LD-84-055, Advises That Requested Addl Info Re SER Confirmatory Issue 4 Listed in Suppl 2 to NUREG-0852 Concerning Inadequate Core Cooling Instrumentation Will Be Submitted by Dec 1984

From kanterella
(Redirected from ML20098H012)
Jump to navigation Jump to search
Advises That Requested Addl Info Re SER Confirmatory Issue 4 Listed in Suppl 2 to NUREG-0852 Concerning Inadequate Core Cooling Instrumentation Will Be Submitted by Dec 1984
ML20098H012
Person / Time
Site: 05000470
Issue date: 09/28/1984
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0852, RTR-NUREG-852 LD-84-055, LD-84-55, NUDOCS 8410090243
Download: ML20098H012 (1)


Text

n 3 C-E Power Systems Tel. 203/688-1911 Combustion Engineering, Inc. Velex: 90297 -

1000 Prospect Hill Road Windsor, Connecticut 06095.

POWER h 'l M SYSTEMS STN 50-470F September 28, 1984 LD-84-055 Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Confirmatory Issue No. 4

Reference:

NRC Meeting Sumary for August 29, 1984 Meeting with Combustion Engineering Owners Group Operations Subcommittee

Dear Mr. Eisenhut:

Confirmatory Issue No. 4, as listed in Supplement No. 2 to the CESSAR SER (NUREG-0852), required additional information in the Emergency Operating Procedure Guidelines (CEN-152) for the use of Inadequate Core Cooling Instrumentation. Additional information was subsequently provided in Rev. 2 of CEN-152 earlier this year. Or, August 29, 1984, the Combustion Engineering Owners Group (CE0G) Operations Subcommittee met with the NRC Staff to discuss the revision and identify any additional information needed by the Staff for its review. The NRC's summary of that meeting (provided by the Reference) lists the additional information needed by the Staff. On behalf of the CE0G, C-E is now preparing the raquested information, which is expected to be submitted to the NRC by December of 1984 and subsequently incorporated into CEN-152.

In a September 18, 1984 meeting on the CESSAR-F docket, the NRC reviewer agreed that C-E's commitment to provide the above information would be sufficient to close out this confirmatory issue on the CESSAR-F docket. Since we are, by this letter, committing to provide the requested information, we believe that the confirmatory issue can now be closed.

If you have any questions or comments on this issue, lp' ease feel free to call me or Mr. T. J. Collier of my staff at (203) 285-5215.

Very truly yours, COMBUSTION ENGINEMING, INC.

^

8410090243 840928 PDR ADOCK 05000470 E PDR A. 5. Scherer Director Nuclear Licensing AES:las d cc: K. Eccleston (NRC F oject Manager) pfd )