Discusses Steam Generator Tube Rupture on 870715.Rupture Raised Questions Re Steam Generator Surveillance from Standpoint of Plant Restart & Generic Implications.Ait Formed on 870717 to Investigaste Event
ML20090J811
Person / Time
Site: North Anna Dominion icon.png
Issue date: 08/14/1987
From: Varga S
Office of Nuclear Reactor Regulation
To: Shao L
Office of Nuclear Reactor Regulation
Shared Package
ML082380335 List:
References
FOIA-91-106 NUDOCS 8708190155
Download: ML20090J811 (2)


Text

f U.h.t t

~'

f_

\\

/p %qI*,

UNIT (DsTAfts

< g/ ';

NUCLE AR REGULATORY COMMISSION

/

riasmutos o c tons

% e' o-August 14, 1987 MEMORANDUM FOR:

Lawrence C. Shao Director

}

Division of Engineering and Systems Technology FRO'i:

Steven A. Varga, Director Division of Reactor projects-!/I!

SUBJECT:

COORDINATION OF NPR AND REGION 11 ACT!V! TIES /NORTN AhNA, UNIT 1 (NA-1) STEAM GENERATOR TUBE RUPTURE (SGTR)

As you are aware, NA-1 experienced an SGTR on July 15, 1987 The tube rupture on the cold leg side at the 7th support level of SG "C" raises questions and (2) g SG surveillance both from the standpoint of (1) restart o regardinthe generic implications for the industry.

An AIT was fonned on Jaly 17, 1987 to investigate this event.

The team was composed of members from Region 11 and NRR. As you are aware, the NRR AIT members included the Project Manager, Leon Engle, and members of your staff:

Mr. H. Conrad, EMTB and Mr. C. Dodd, NRC ORNL consultant.

28, 1987 to A, Gibson from G.C. Lainas, the actions By memorandum dated July and responsibilities were designated pursuant to the memorandum, "Dircks to Regional Administrators, dated April 13, 1982," Steam Generator Problems.

A copy,cf the July 28, 1987 memorandum is provided in Enclosure 1.

Two of the items specified in the July 1987 memorandum require prompt action on the part of the NRR staff. They are:

ftem (3) Ali Report to be reviewed by R!l and NRR prior to issuance, and item (4) Adequacy of SG repairs prior to restart for NA-1. Regarding item 5. I would like to discuss the generic implications of this SGTR event with you in the near future.

Regarding Item (3) ebove, the draf t AIT report is scheduled to be available for review by August 12, 1987. Review and any comments of this document should be made available to the PM by August 18, 1987 in order that the R!l/NRR AIT report can be issued by August 21, 1987. Mr. H. Conrad and Mr. C, Dodd have already provided their input for the AIT report.

Regarding Item (2) above, the NRR staff must provide an SER regarding the At a meeting adequacy of SG inspection and repairs for NA-1 prior to restart.

held on site on July 29, 1987, the licensee provided an update of the SGTR event and planned inspection of SG's A, 8 and C and needed repairs. Members of your staff were in attendance at this meeting.

The licensee's present schedule shows M inspection and repairs will be completed and NA-1 ready for 30, 1987 A milestone schedule is provided in Enclosure 2 restart by September to this memorandum.

The milestones are based on the best infortnation available at this time. As specified in the Enclosure, an SER for NA-1 is needed by September 20, 1987 in order to be issued prior to restart for NA-1.

, - ~. - -

)!c

,r

[

0700190155 Del 4Ct'4

)

Q~*n"$?"

/

l AV$ $4 167

?-

Lawrence C. Shao With the above matters as background, I propose that we meet shortly after the NRR SEP, input has been issued (09/20/87), in order to finalize NRR's management position regarding the SG inspection and repairs and authorization for restart of NA-1.

The Region !! position regarding restart should also be available at that time.

Steven A. Varga, Director Division of Reactor Projects-!/l!

Enclosures:

As stated cc:

T. Murley J. Snierek F. Miraglia R. Starostecki D. Crutchfield C. Fossi J. Partlow F. Congel W. Russell J. Grace 4,Ernst L. Reyes DISTPIBUTION D6Eket Filet)

PD22 Rdg.

S. Yarga G. Lainas L. Engle D. Miller I

  • See previous concurrence
  • LA:PD22
  • PM:P022
  • D:PD22
  • PD2A DMiller LEngle:he LRubenstein Glainas a

8/ /87 8/ /87 8/ /87 8/ /87 787

,...,