Interrogatories & Request for Production of Documents to Ohio Citizens for Responsible Energy Re Reliability of Transamerica Delaval Standby Diesel Generators.W/Certificate of Svc.Related Correspondence
ML20087C690
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/09/1984
From: Swiger M
CLEVELAND ELECTRIC ILLUMINATING CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
OHIO CITIZENS FOR RESPONSIBLE ENERGY
References
NUDOCS 8403130139
Download: ML20087C690 (28)


Text

.

RE1ATED CORRES?ONDEN@

DOCKETED USNRC Mfphg Q9g g UNITED STATES OF AMERICA 'U"~^ "* <

NUCLEAR REGULATORY COMMISSION '

Before the Atomic Safety and Licensing Board In the Matter of )

)

THE CLEVELAND ELECTRIC ) Docket Nos. 50-440 ILLUMINATING COMPANY, ET AL. )- 50-441

)

(Perry Nuclear Power Plant, )

Units 1 and 2) )

APPLICANTS' INTERROGATORIES AND REQUEST FOR PRODUCTION OF DOCUMENTS TO INTERVENOR OHIO CITIZENS FOR RESPONSIBLE ENERGY (FIFTH SET)

These Interrogatories and the Request for Production of Documents are filed by Applicants pursuant to the Licensing Board's Special Prehearing Conference Memorandum and Order, LBP-81-24, 14 N.R.C. 175 (1981), the. discovery-schedule estab-lished by the Licensing Board's Memorandum and Order (New Con-tention on Diesel Generators), dated December 23, 1983, and the Nuclear Regulatory Commission's Rules of. Practice.~ The Inter-rogatories and Document Request are directed.toward Intervenor Ohio Citizens for Responsible Energy'("OCRE") and pertain to Issue No. 16, concerning the reliability of'the standby diesel generators manufa:tured for the Perry Nuclear Power Plant-("PNPP") by Transamerica Delaval, Inc. .("Delaval" or "TDI").

0403130139 940309 --

PDR ADOCK 05000440 G. ._

PDR __

])

Q_ __

The Interrogatories submitted herein are filed pursuant to 10 C.F.R. 5 2.740b, which requires that the Interrogatories be answered separately and fully in writing under oath or affirma-tion within 14 days after service. The Interrogatories are in-tended to be continuing in nature; and the answers must be im-mediately supplemented or amended, as appropriate, should OCRE obtain any new or different information responsive to the Interrogatories.

The Request for Production of Documents is filed pursuant to 10 C.F.k. $ 2.741, which requires that OCRE produce and ei-ther furnish copies of or permit Applicants to inspect and copy any documents responsive to the request which are in the pca-session, custody or control of OCRE. The Request for Produc-tion of Documents also is continuing in nature and OCRE must produce immediately any additional documents it obtains which are responsive to the Request.

For purposes of these Interrogatories, the term "docu-ment (s)" means all writings and records of every type in the possession, control or custody of OCRE, including, but not lim-ited to, memoranda, correspondence, reports, surveys, tabu-lations, charts, books, pamphlets, photographs, maps, bulle-tins, minutes, notes, speechen, articles, transcripts, voice recordings, and all other writings or recordings of any kind.

" Document (s)" shall also mean copies of documents even though the originals thereof are not in the possession, custody or control of OCRE.

l

0 i

i

l i

For purposes of these Interrogatories, a document shall be deemed to be within OCRE's " control" if OCRE has ownership, '

possession or custody of the document or copy thereof, or has the right to secure the document or copy thereof from any per-i sen or public or private entity having physical possession thereof.

When identification of a document is requested, briefly describe the document, i.e., letter, memorandum, book, pam-phlet, etc., and state the following information as applicable to the particular document: name, title, number, author, date-of publication and publisher, addressee, date written or ap-proved, and the name and address of the person (s) having pos-

, session of the document.

The purpose.5 of these Interrogatories and the Request for i

) Production of Documents are to clarify the scope of Issue No.

16 and to ascertain the factual bases which support each ele-ment of the Issue so that Applicants adequately can prepare their response to the Issue.

INTERROGATORIES

1. State the name, present or-last known address,rpres-ent or tact known employer, and educational'and professional qualifications of each person known to you to have first-hand
  • knowledge of the facts alleged-in Issue-No. 16.
2. (a) State the name, title, employer and educational I

and professional' qualifications of each personLyou intend to

callias a witness on Issue No. 16.

s 1

o (b) State the subject matter on which each such per-son is expected to testify.

(c) State the substance of the facts and opinions to which each such person is expected to testify.

(d) State a summary of the grounds for such opin-ions, and identify all documents upon which such person relies to substantiate such opinions.

3. Identify all documents in your possession, custody or control, including all relevant page citations, pertaining to the subject matter of Issue No. 16.
4. Identify all documents which you intend to offer as exhibits durir g this proceeding to support Issue No. 16 or which you intend to use during your cross-examination of wit-nesses presented by Applicants and/or the NRC Staff (" Staff")

on Issue No. 16.

5. State each and every reason why you believe-that the PNPP standby diesel generators "are not highly reliable." Ohio Citizens for Responsible Energy Motion To Resubmit Contention
  1. 2, dated September 6, 1983 (" Motion To' Resubmit"), at 1. De-scribe in detail the bases for your answer.
6. Describe in detail the " pattern of deficiencies and substandard quality" which you believe " threatens the reliability of on-site electric power at PNPP." Id. at 3.
7. (a) Identify all the "known problems with Transamerica Delaval diesel generators," OCRE Response to Ap-plicants' Answer to NRC Staff Supplemental Response ~Re Proposed

l i

4, r- Diesel Generator Reliability Contention, dated December 22, 4 1983, at 2, which you believe affect adversely the reliability l of the-PNPP standby diesel generators. As to each such prob-1em, state: the type of application of the-diesel generator, j e.g., nuclear or marine; the name of the plant, ship or other facility using the diesel generator; the rated capacity of the diesel generator; the type of diesel engine, e.g., straight-8 or V-16, and all other relevant design information; the number ,

of hours of operation when the problem occurred; whether the l

problem occurred during type qualification testing, preservice l

{ testing, inservice testing, or actual operation; the cause(s) of the problem; and all other facts, details and circumstances j concerning the problem. Identify all relevant documentation of I

the problem. Provide a detailed explanation of why you believe-l the particular problem applies to the PNPP standby diesel gen-erators.

{ (b) As to each problem identified in response to (a) above, state whether you believe the problem has been or.will

.be adequately resolved for the PNPP. standby diesel generators.

1 If your answer is other than affirmative, describe in detail 1

the bases for your answer.

[ - .

'(c) As to each problem identified in response to (a) above which you believe has'not been or will.not be'auoquately 1

resolved, state what corrective action (s) you:believe Appli-i' cants must.take to resolve the~ item and' describe in' detail.the- '

! _ bases forLyour answer.

b ..:

5-3 -

s

,, . - , . , ~ g,

. - ,----,s ,m, , ,, - e - - - . , - - -ss- , > . - - - - --

. -=

i

8. (a) Identify all facts, findings, assertions and 1

conclusions stated in IE Information Notice 83-58, dated August 30, 1983, which you believe demonutrate the unreliability of the PNPP standby diesel generators. As to each such item, pro-vide a detailed explanation of why you believe the particular item applies to the PNPP standby diesel generators.

(b) As to each item identified in response to (a) above, state whether you believe the item hans been or will be adequately resolved for the PNPP standby diesel generators. If your answer is other than affirmative,' describe in detail the

, bases for your answer. $

(c) As to each item identifieki in response to (a) above which you believe has not been or will notube adequately resolved, state what corrective action (s) you believe Appli-cant, mur.tl take 2 to resolve the-item and describe in detail the

~

.-1 -

bases for your %answey.

9. (a) Identify all facts, findings, assertions.and e- ..

conclusions stated in IE Informition:Notic) 83-51,-dated August

^

5, 1983b which you beli ve kemonstrate the unreliability of the PNPP standby ciiesel generators.

3 As to each such;citem, provide

% -- s _.

y e _ cs,. ..

a detailed explanation of why you believe the.- particular item -

x .. _

x.

~

appliebto thikPNPP ' standby t%

diesel ' generators. -. .

, g%s, ,,'

(b}a As'.to each item ' identified jn response to (a)

., 'e , ~

,. .m u al$ove, stateiwhether you believesthe item'h'as been or will be-

,,  %. a. ' .1 adequately;resolvAd fdr; the PNPP standby diesel generators. m If 1  ; 'E. Tc ..

your answei is'otherfthan affirmative,; describe in; detail ~-tho' n'  ; ,

bases for yourls.nswe'r.

s  %

s.,, 1 6-k } . -

.r. M- ~ . a,, ,, .. .-

(c) as to each item identified in response to (a) above which you believe has not been or will not be adequately resolved, state what corrective action (s) you believe Appli-cants must take to resolve the item and describe in detail the bases for your answer.

10. (a) Identify all facts, findings, assertions and conclusions stated in the Newsday article entitled Maker of Shoreham Generators Has Record of Problems in U.S., dated August 16, 1983, attached to OCRE's Motion To Resubmit, which you believe. demonstrate the unreilability of the PNPP etandby diesel generators. As to each such item, provide a detailed explanation of why you believe the particular item applies to the PNPP standby diesel generators.

(b) As to each item identified in respense to (a) above, state whether you believe the item has been or will be adequately resolved for the PNPP standby diesel generators. If your answer is other than affirmative, describe in detail the bases for your answer.

(c) As to each item identified in response to (a) above which you believe has not been or will not be adequately res _ilved, state what corrective action (s) you believe Appli-cants must take to resolve 'che item and describe in detail the

-bases for your answer.

11. (a) Identify all facts, findings, assertions and conclusions stated in the Newsday article entitled Cracks Now i

l Confirmed in All 3 Shoreham Diesel Generators, dated August 24, i

l l

i 1983, attached to OCRE's Motion To Resubmit, which you believe demonstrate the unreliability of the PNPP stamtby diesel gener-ators. As to each such item, provide a detailed explanation of why you believe the particular item applies to the PNPP standby diesel generators.

(b) As to each item identified in response to (a) above, state whether you believe the item has been or will be adequately resolved for the PNPP standby diesel generators. If your answer is other than affirmative, describe in detail the bases for ycur answer.

(c) As to each item identified in response to (a) above which you believe has not been or will not be adequately resolved, state what corrective action (s) you believe Appli-cants must take to resolve the item and describe in detail the bases for your answer.

12. (a) Identify all facts, findings, assertions and conclusions stated in the Newsday article entitled NRC Has Cited Builder of Equiement 59 Times, dated August 24, 1983, at-tached to OCRE's Motion To Resubmit, which you believe demon-strate the unreliability of the PNPP standby diesel generators:

As to each such item, provide a detailed explanation of why you believe the particular item applies to the PNPP standby diesel generators.

(b) As to each item identified in response to (a) above,-state whether you believe the item has been or will be adequately resolved for the PNPP standby diesel generators. If

your answer is other than affirmative, describe in detail the bases for your answer.

(c) As to each item identified in response to (a) above which you believe has not been or will not be adequately resolved, state what corrective action (s) you believe Appli-cants must take to resolve the item and describe in detail the l bases for your answer.

13. (a) Identify all facts, findings, assertions and conclusions stated in the Newsday article entitled Shoreham Diesels' Troubled History (undated), attached to OCRE Response to Staff and Applicant Answers to OCRE's Motion To Resubmit its Contention #2, dated October 14, 1983 ("OCRE Response"), which you believe demonstrate the unreliability of the PNPP standby diesel generators. As to each such item, provide a detailed

~

explanation of why you believe the particular item applies to the PNPP standby diesel generators.

(b) As to each item identified in response to (a)

. above, state whether you believe the item has been or will be adequately resolved for the PNPP standby dielel generators. If your answer is other than affirmative, describe in detail the bases for your answer.

(c) As to each item identified in response to (a) above which you believe has not been or will not be adequately resolved, state what corrective action (s) you believe Appli-cants must take to resolve the item and describe in detail the bases for your answer.

. l

14. (a) Identify all facts, findings, assertions and conclusions stated in NRC Board Notifications relating to Delaval diesel generators, including all enclosures and attach-ments to the Board Notifications, which you believe demonstrate the unreliability of the PNPP standby diesel generators. As to each such item, provide a detailed explanation of why you be-lieve the particular item applies to the PNPP standby diesel generators. For each item, identify the relevant Board Notifi- ,

cation and provide appropriate citacions.

(b) As to each item identified in response to (a) above, state whether you believe the item has been or will be adequately resolved for the PNPP standby diesel generators. If your answer is other than affirmative, describe in detail the bases for your answer, (c) As to each item identified in response to (a) above which you believe has not been or will not be adequately resolved, state what corrective action (s) you believe Appli-cants must take to resolve the item and describe in detail the bases for your answer.

15. (a) Identify all facts, findings, assertions and conclusions stated in NRC Inspection Reports,-including but not limited to notices of violation and notices of nonconformance, which you believe demonstrate the unreliability of the PNPP standby diesel generators. As to each such item, provide a de-tailed explanation of why you believe the particular item applies to the PNPP standby diesel generators. For each item,.

identify the relevant Inspection Report and provide appropriate citations.

(b) As to each item identified in response to (a) above, state whether you believe the item has been or will be adequately resolved for the PNPP standby diesel generators. If your answer is other than affirmative, describe in detail the a

bases for your answer.

] (c) As to each item identified in response to (a)

, above which you believe has not been or will not-be adequately resolved, state what corrective action (s) voa believe Appli-cants must take to resolve the item and describe in detail the bases for your answer.

16. (a) Identify all deficiencies which you believe af-feet adversely the reliability of the PNPP standby diesel gen-erator crankshafts. As to each such deficiency, identify all relevant documentation of t'he deficiency and provide a detailed explanation of why you believe the deficiency applies to the PNPP standby diesel generators.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved for the PNPP standby diesel genera-tors. If your answer is other than affirmative, describe in detail the bases for your answer.

3 (c) As to each deficiency identified in response'to (a) above which you believe has nct been or will.not be ade-l quately resolved, state what corrective action (s) you believe l

Applicants must.take to resolve the deficiency and describe in detail the bases for your answer.

17. (a) State whether you agree that the maximum tor-sional stress on the PNPP standby diesel generator crankshafts is only 60 percent of the design stress, and that the margin of safety at PNPP is therefore sufficiently great that there is reasonable assurance that the crankshafts will not crack from torsional stress throughout the life of the plant. If your an-swer is other than affirmative, describe in detail the bases for your answer.

(b) Describe in detail the bases for your assertion that, with respect to diesel generator crankshafts, " lower tor-sional stresses may not be a factor favoring safety." OCRE Re-sponse at 2 n. 4.

(c) State what you believe to be the range of tor-sional stresses for the PNPP standby diesel generators which would prcduce crankshaft cracking growth rates low enough not to be detected prior to completion of preservice testing but high enough to cause crankshaft failure before the end of the 40 year life of the plant. Describe in detail the bases for your answer.

18. (a) Identify all deficiencies which you believe-af-feet adversely the reliability of the PNPP standby diesel gen-

~

erator connecting rod bearings. As to each such deficiency, identify all relevant docunentation of the deficiency and pro-vide a detailed explanation of why you believe the' deficiency applies to the PNPPfstandby diesel generators.

l l

t f

1 1

1 4

I (b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved for the PNPP standby diesel genera-tors. If your answer is other than affirmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answer.

19. (a) State whether you believe that the design of the i

PNPP standby diesel generator crankshafts is likely to lead to

cracking of connecting rod bearings. If your answer is other than negative, describe in detail the bases for your answer.

(b) State whether you believe that the THPP standby diesel generators have unsupported, overhung connecting rod bearing ends. If your answer is other than negative, describe in detail the bases for your answer.

(c) State whether you believe that the PNPP standby diesel generators have excessive crankpin journal yawing. If your answer is other than neggtive, describe in detail the bases for your answer.

(d) State whether you believe that the PNPP standby diesel generator connecting rod bearings have excessive voids or pores. If your answer is other than negative, describe in detail the bases for your answer.

, 1

. .. _ .- . ~ .

(e) If your answer-to either (a), (b), (c) or (d) above is other than negative, state what corrective action (s) 1 you believe Applicants must take to resolve each deficiency and describe in detail the bases for your answer.

20. (a) Identify all deficiencies which you believe af-fect adversely the reliability of the PNPP standby diesel gen-erator pistons. As to each such deficiency, identify all rele-vant do'cumentation of the deficiency and provide a detailed explanation of why you believe the deficiency applies to the PNPP standby diesel generators.

i (b) As to each deficiency identified in response to I

(a) above, state whether you believe the deficiency has been or l will be adequately resolved for the PNPP standby diesel genera-tors. If your answer is other than affirmative, describe in detail the bases for your answer.

(c)

As to each deficiency identified in response to (a) above which you believe han not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in i

detail the bases for your answer.

21. (a) State whether you believe that the PNPP standby diesel generators are susceptible to piston crown-skirt separa-tion. If your answer is other than negative, describe.in de-tail the bases for your answer.

(b) If.your answer to (a) above is other than'nega-tive, state why_you believe that the PNPP piston design, which

-1 i

14-

m. v .w,

4 .

provides that the piston crowns are bolted to the skirts through a " full stack" of Belleville washers, will not prevent separation. Describe in detail the bases for your answer.

(c) If your answer to (a) above is other than nega-l tive, state what corrective action (s) you believe-Applicants must take to resolve the problem and describe in detail the

bases for your answer.
22. (a) State whether you believe that the PNPP standby

! diesel generator pistons have stress ricers. If your answer is j

other than negative, describe in detail the bases for your an-swar.

i 4

?

(b) If your answer to (a) above is other than nega*

i i

tive, state why you believe that (1) heat treatment of the PNPP pistons, (2) deburring of-the PNPP pistons prior.to heat treat-l ment, and-(3) air cooling (as opposed to fan cooling) of the PNPP pistons after heat treatment were not sufficient.to' pre-vent stress risers. Describe in-detail the' bases for your an-swer.

~

(c) If your answer to (a) above is'other than negative, state what corrective action (s).you believe Applicants must

[ take to-resolve the problem and describe in' detail the bases for your answer.

l

23. (a) State whether.you-believe that.the-PNPP-standbyf .

diesel generators are. susceptible to-cplinderLhead cracking.

If_your answer is other.than negative,._describemin detail'the -

bases for your' answer.

l

--15-- H

- o h

,2 . ~i

~

1 l

l (b) If your answer to (a) above is other than nega-tive, state whether you believe that cylinder head cracking is likely to result in cylinder head or engine failure. If your answer is other than negative, describe in detail the bases for your answer.

(c) If your answer to (a) above is other than nega-tive, state what corrective action (s) you believe Applicants must take to resolve the problem and describe in detail the bases for your answer.

24. (a) Identify all deficiencies which you believe af-fect adversely the reliability of the PNPP standby diesel gen-erator cylinder liners. As to each such deficiency, identify all relevant documentation of the deficiency and provide a de-tailed explanation of why you believe the deficiency applies to the PNPP standby diesel generator.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved for the PNPP standby diesel genera-tors. If your answer is other than affirmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answer.

I

25. (a) Identify all defibiencies which you believe af-fect adversely the reliability of the PNPP standby diesel gon-erator cylinder blocks. As tc each such deficiency, identify all relevant documentation of the deficiency and provide a de-tailed explanation of why you bel.ieve the deficiency applies to the PNPP standby diesel generators.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved for the PNPP standby diesel genera-tors. If your answer is other than affirmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, state what currective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answer.

26. (a) Identify all NRC regulations, regulatory guides ,

and industry standards relating to the reliability of the PNPP standby diesel generators with which you believe Applicants fail or will fail to comply. As to each such regulation, regu-latory guide or inductry standard, describe in detail the bases for your answer, including the reasons'for identifying'the reg-ulation, regulatory guide or industry standard.

(b) As to.each regulation, regulatory guide or in-dustry standard identified in response to (a) above, identify all specific provisions with which you believe Applicknts fail 1

A

t or will fail to. comply. As to each such provision, describe in

, detail the bases for your answer, including the reasons for identifying the provision.

(c) As to each provision identified in response to (b) above, state what action (s) you believe Applicants must l take to comply with the provision. Describe in detail the bases for your answer.

27. (a) State each and every reason why you believe that Regulatory Guide 1.9, " Selection, Design, and Qualification of Diesel Generator Units Used as Standby (Onsite) Electric Power Systems at Nuclear Power Plants," dev. 2 (December 1979) (" Reg.

Guide 1.9, Rev. 2"), applies to the PNPP standby diesel genera-tors "[a]lthough Revision 2 of Regulatory Guide 1.9 is applica-ble to applications docketed after December 1979." CCRE Brief-1 on Engulations and Guidance Applicable to Issue #16, dated January 16, 1984, at 6.

(b) Identify all specific provisions of Reg. Guide 1.9, Rev'. 2 not contained in IEEE Standard 387-1977, "IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations" ("IEEE Standard 387-1977"), 1;ith which you believe Applicants fail to comply. i (c) As to each provision identified in response to (b) above, state whether you believe the provision is necessary-to assure the reliability of the PNPP standby diesei

-18 .

generators. If.your answer is other than negative, describe in detail the bases for your answer.

(d) As to each provision identified in response to (b) above which you believe necessary to assure the reliability of the PNPP standby diesel generators, state what action (s) you believe Applicants must take to comply with Reg. Guide 1.9, Rev. 2. Describe in detail the bases for your answer.

28. (a) Identify all deficiencies which you believe exist in the specification for the PNPP standby diesel genera-tors, including all revisions and attachments to the specifica-tion, and which you believe affect adversely the reliability of the standby diesel generators. As to each such deficiency, de-scribe in detail the bases for your answer, including the rea-sons for identifying the deficiency.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adquately resolved. If your answer is other than af-firmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answor.

29. (a) Identify all deficiencies which you believe exist in the design of.the-PNPP standby diesel generators and.

which you believe affect adversely the reliability of the l

i standby diesel generators. As to each such deficiency, de-scribe in detail the bases for your answer, including the rea-sons for identifying the deficiency.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved. If your answer is other than af-firmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answer.
30. (a) Identify all deficiencies which you believe to exist in Delaval's Instruction Manual for the PNPP standby die-sel generators and which you believe affect adversely the reliability of the standby diesel generators. As to each such deficiency, describe in detail the bases for your answer, including the reasons for identifying the deficiency.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved. If your answer is other than af-firmative, describe in detail-the bases for your answer.

(c) As to each deficiency identified in_responsectoi (a) above which you believe has not been orJwill not'be~ade -

, quately resolved, state what corrective' action (s) you believe Applicants musu take to resolve the' deficiency and' describe'in

~

detail.the bases for your answer.

l

  • I

--20-' l

31. (a) Identify all hardware deficiencies, potential deficiencies and nonconformances for the PNPP standby diesel generators, including but not limited to those documented in Applicants' Deviation Analysis Reports and Nonconformance Re-ports, which you believe affect adversely the reliability of the standby diesel generators. As to each such item, describe in detail the bases for your answer, including the reasons for identifying the item. l (b) As to each item identified in response to (a) above, state whether you believe the item has been or will be adequately resolved. If your answer is other than affirmative, describe in detail the bases for your answer.

l (c) As to each item identified in response to (b) above which you believe has not been or will not be. adequately resolved, state what corrective action (s) you believe Appli-cants must take to resolve 'the item and describe in detail the '

l 1 bases for your answer.

(d) Describe in detail the bases for your assertion that the documented hardware deficiencies for the PNPP standby diesel generators are " harbingers of trouble to come." Motion To Resubmit at 4 n. 1.

32. State whether you believe that the proposed corree-tive actions documented in Applicants' final report'to the NRC l Staff relating to installation of fuel oil line clamps,' dated t . .

L Janary 30, 1984, are adequate. If your answer isfother than

, affirmative, state the additional corrective action (s) you-t

~

i m P W *

  • 7 + F

, l believe Applicants must take and describe in detail the bases for your answer.

33. (a) Identify all deficiencies which you believe existed with respect to the storage of the PNPP standby diesel generators prior to installation and which ycu believe affect adversely the reliability of the standby diesel generators. As to each such deficiency, describe in detail the bases for your answer, including the reasons for identifying the deficiency.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or 4

will be adequately resolved. If your answer is other than af-firmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to 4 (a) above which you believe has not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answer.

34. (a) Identify all_ deficiencies which you believe exist with respect to the installation of the PNPP standby die-sel generators and which you believe atfect adversely the reliability of the standby diesel _ generators. As to each such deficiency, describe in detail the bases for your answer, including the reasons for identifying the deficiency.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved. If your answer is other than affirmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answer.

, 35. (a) Identify all deficiencies which you believe exist with respect to the type qualification program for the PNPP standby diesel generators and wh.ich you believe affect ad-versely the reliability of the standby diesel generators. As to each such coficiency, describe in detail the bases for your answer, including the reasons for identifying the deficiency.

l (b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved. If your answer is other than af-firmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take *.o resolve the deficiency and describe in-detail the bases for ycur answer.

36. (a) Identify all deficiencies which you believe exist with respect to the factory testing of the PNPP standby diesel generators and which you believe affect adversely the-reliability of the standby diesel generators. As to each such deficiency, describe in detail.the bases for your answer, including the reasons for identifying the deficiency.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved. If your answer is other than af-firmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, ctate what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answer.

37. (a) Identify all deficienciee which you believe exist with respect to the preoperational testing program for the PNPP standby diesel generators and which you believe affect adversciy the reliability of the standby diesel generators. As to each such deficiency, describe in detail the bases for your l

answer, including the reasons for identifying the deficiency.

(b) As to each deficiency identified in response to (a) above, state whether you believe the deficiency has been or will be adequately resolved. If your answer is other than af-firmative, describe in detail the bases for your answer.

(c) As to each deficiency identified in response to (a) above which you believe has not been or will not be ade-quately resolved, state what corrective action (s) you believe Applicants must take to resolve the deficiency and describe in detail the bases for your answer.

38. (a) Identify all deficiencies which you believe to exist with respect to the TDI Diesel Generator Owners Group

t .

i 5

Design Review /Qvality Revalidation Program ("DR/QR Erogram")

and which you believe affect adversely the reliability of the PNPP standby diesel generators. As to each such deficiency, describe in detail the bases for your answer, including the reasons for identifying the deficiency.

f (b) As to each deficiency identified in response to (a) above, state what action (s) you believe Applicants must take to assure the reliability of the PNPP standby diesel gen-eraters. Describe in detail the bases for your answer.

39. State the name, title or position, address, employer, and educational and professional qualifications of each person who provided information used in preparing responses to any of the foregoing Interrogatories.
40. For each person identified in response to Interroga-tory #39, supra, state the number (s) of the Interrogatories for which information was supplied.
41. State the name, title or position, address, employer and educational and professional qualifications of each person who searched for documents in order to respond to any of the foregoing requests for identification of documents.
42. For each person identified in response to Interroga-tory #41, supra, state the number (s) of the Interrogatories for which the search was conducted and the location where the search was conducted.
43. Identify any written or recorded statement of any_in-dividual pertaining to the subject matter of Issue No. 16 not

_ -- ~ e e

previously identified in response to the foregoing Interrogato-ries.

REQUEST FOR PRODUCTION OF DOCUMENTS Applicants request that OCRE respond in writing to the following request for production of documents, and produce the original or best copy of each of the documents requested below ,

I at the Perry Nuclear Power Plant at the office of Mr. Bradley S. Ferrell of The Cleveland Electric Illuminating Company, or at a place mutually convenient to the parties.

The term " document (s)" means all writings and records of every type in the possession, control or custody of OCRE including, but not limited to, memoranda, correspondence, re-ports, surveys, tabulations, charts, books, pamphlets, photo-graphs, maps, bulletins, minutca, notes, speeches, articlea, transcripts, voict recordings, and all other writings or re-cordings of any kind. " Document (s)" shall also mean copies of documents even though the originals thereof are not in the pos-l session, custody or control of OCRE.

A document shall be deemed to be within the " control" of l OCRE if it has ownership, possession or custody of the document l or copy thereof, or has the right to secure the document or copy thereof from any person or public or private entity having physical possession thereof.

O t

Applicants request that OCRE produce each and every docu-ment identified or described in the answers to Interrogatories

  1. 1 through #43, supra.

Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE By:  %,&faffQ.8d @

JAY E. SILBERG, P.C.

MICHAEL A. SWIGER Counsel for Applicants 1800 M Street, N.W.

Washington, D.C. 20036 (202) 822-1000 Dated: March 9, 1984 1

5 i

i l

I t _

March 9, 1984 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

THE CLEVELAND ELECTRIC ) - Docket Nos. 50-440 ILLUMINATING COMPANY, ET AL. ) 50-441

)

(Perry Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE This is to certify that copies of the foregoing

" Applicants' Interrogatories and Request for Production of Documents to Intervenor Ohio Citizens for Responsible Energy (Fif th Set)" were served by deposit in the United States Mail, express mail , postage prepaid, this 9th day of March, 1984, to all those on the attached Service List.

% /cAcutd Q, d Oi W

~

Michael A. Swiger DATED: March 9, 1984

l i

UNITED STATES OF AMERICA I NUCLEAR REGULATORY COMMISSION ,

Before the Atomic Safety and Licensing Board In the Matter of )

) .

THE CLEVELAND ELECTRIC ) Docket Nos. 50-440 ILLUMINATING COMPANY ) 50-441 ,

l

)

(Perry Nuclear Power ' Plant, )

Units 1 and 2) )

i SERVICE LIST i Pater B. Bloch, Chairman Atomic Safety and Licensing Atomic Safety and Licensing Board Appeal Board Panel U.S. Nuclear Regulatory Consnission U.S. Nuclear Regulatory Commission

. Washington, D.C. 20555 Washington, D.C. 20555 Dr. Jerry R. Kline - Docketing and Service Section Atomic Safety and Licensing Board Office of the Secretary U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Wnshington, D.C. 20555 Washington, D.C. 20555 Mr.'Glenn O. Bright Colleen P. Woodhead, Esquire l Atomic Safety. and Licensing Board Office of the Executive Legal U.S. Nuclear Regulatory Constission Director Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Christine N. Kohl, Chairman Atomic Safety ad Licensing Ms. Sue Hiatt Appeal Board OCRE-Interim Representative U.S. Nuclear Regulatory Commission 8275 Munson Avenue Washington, D.C. 20555 Mentor, Ohio 44060 Dr. W. Re:ed Johnson Terry Lodge, Esquire Atomic Safety and Licensing 618 N. Michigan Street, Suite 105 Toledo, Ohio 43624

, Appeal Board U.S. Nuclear Regulatory Conunission Washington, D.C. 20555 Donald T. Ezzone, Esquire l' Assistant Prosecuting Attorney Gary J. Edles, Esquire Lake County Administration Center Atomic Safety and Licensing 105 Center Street Appeal Board Painesville, Ohio 44077 U.S. Nuclear Regulatory Commission John G. Cardinal, Esquire Washington, D.C. 20555 Prosecuting Attorney Atomic Safety and Licensing Ashtabula County Courthouse Board Panel Jefferson, Ohio 44047 U.S. Nuclear Regulatory Conunission Washington, D.C.,~20555 ,

l l _ - ._. .- . - .

- . - .