March 23, 1983 J
i William J. Dircks MEMORANDUM FOR:
Executive Director for Operations Leo Slaggie b E.
FROM:
Acting Solicitor DOCUMENT SEARCH RELATED TO WASHINGTON
SUBJECT:
PUBLIC POWER SUPPLY SYSTEM LITIGATION The United States Department of Justice is currently involved in litigation centered around the attempt by the Washington Public Power Supply System to build five nuclear By letter power plents at Satsop and Hanford, Washington.the Department of Jus 21, 1983, dated March on's assistance in preparing for that litigation the Commit This office has agreed to provide such (attached).
assistance.
(5) issues In the attached letter, Justice identifies five Documents in the related to the Supply System litigation.
agency's possession related to these issues are likely to be the subject of civil discovery requests or FOIA requests.
(
Based on this likelihood and in light of Justice's request for assistance, we believe that the appropriate staff offices should begin as soon as possible to identify relevant documents to avoid unnecessary delay in responding Accordingly, we to any future discovery or FOIA requests. search be instituted regarding each request that a document of the five issues identified by the Department of Justice.
For each issue, we would cppreciate a listing of all relevant documents by subject, originator, recipient and l
If possible, the location (original or headquarters date.
of each document should be shown.
- Finally, and office) should your review identify any documents related to WPPSS not clearly related to any of the five issues identified by Justics, please list such documents separately.
I have asked C. Sebastian Aloot (X41493) to coordinate the The results agency's identification of relevant documents, l
of your search and any comments or requests for additional Finally, we would information should be directed to him.
{
appreciate an estimate of the time within which your search
^
j will be completed.
Attachment:
As stated wy,v60,ses,29,CB
~
l
(
JA Copy Has Been S.e.n_t.iE. PD_R Q3qqug 7
.d F.,,,, f
~
CARVEY, SCHUBERT, ADAMS 8 BARER wasmesNGTON. O C 3oTH FLOOR RonvL ANO eOOO POTOMAC STRE ET N w-THE BANM QF CALiroRNIA CENTER 8800 ONE MAIN PLACE WASHINGTON. D C. 20007 SE ATTLE. WASHINGTON 98164 eof S,w, M Alte (E02) sees-7880 (2oe) 464 3933 PORTLAND. OREGON 97204 (503)228 3939 TELEX: 321037 (LEm SE A)
C AeL E: LE x-S E AT TL E SAN rRANCISCO suite 2808 TELEComER ONE EMBARCADERO CENTER (209) 434 3939 (par)
SAN rRANCISCC,. CALirORNIA 949e
(*06) 464 2947 (mesGMT)
(415) 788 Sa35 September 28, 1983 PLE ASE REPLv TO SE ATTLE OrriCE FREEDOM OF INFORMATION ACT REQUEST Fo Z A S 75*
R 'h y - J Q Director Office of Administration U.S. Nuclear Regulatory Commission 1717 H Street Northwest Washington, D.C.
20555 Re: Freedom of Information Act Request -- Washington Public Power Supply System Plants 4 and 5
Dear Sir or Madsm:
This firm is involved in litigation arising out of bonds issued to finance construction of two nuclear plants by the Washington Public Power Supply System ("WPPSS").
Pursuant to the Freedom of Information Act, 5 USC section 552, and the regulations promulgated thereunder, 10 CFR section 9.3 et seq., I am requesting access to the following materials:
1.
All correspondence, documents, records, or other materials pertaining in any way to WPPSS plants 4 and 5.
2.
All correspondence, documents, rccords or other materials pertaining to any WPPSS application to the NRC for authorization to construct WPPSS plants 4 and 5; 3.
All correspondence, documents, records or other materials pertaining to the procedure by which the NRC authorized WPPSS to construct l
WPPSS plants 4 and 5; 4.
All correspondence, documents, records or other materials pertaining to NRC authorization to construct WPPSS plants 4 and 5; 5.
Transcripts of all hearings conducted by the hTC or any other agency pertaining in any way to WPPSS plants 4 and 5; 6.
All correspondence, records, documents, or other materials pertaining in any way to the financial structure of WPPSF, the methods g v - -.fh[bS T fG ALJ lll f r r-
=.
L
... +
y,..'
U.S. Nuclear Regulatory Commission i
September 28, 1983 Page two by which WPPSS finances or financed construction of plants 4 and 5, or i
any other financial information concerning plants 4 and 5.
l If all or any part of this request is denied, please cite the specific exemptions which you think justify your refusal to release the informa-tien purscant to 10 CFR sections 9.5 and 9.10(b).
I do not wish to have the requested materials copied at this time.
Rather, please notify me where and when the requested materials will be available for inspection and copying pursuant to 10 CFR section 9.10(b).
' lease advise me of approximately how much it will cost to copy the
- equested materials.
j Please respond to this. request by mail.
If you have any questions or if I can help you identify any of the requested materials, please call me at (206) 464-3939. Thank you for your assistance.
i Sincerely yours, i
GARVEY, SCHUBERT, ADAMS & BARER i '
. / g. '[
- {/
By Scott I. Anderson SIA:kmf 1
l
\\