ML20083L310

From kanterella
Jump to navigation Jump to search
Forwards from Constituent E Borhek for Response. Requests That Duplicate Rept Be Forwarded to 802 United States Courthouse,Seattle,Wa 98104
ML20083L310
Person / Time
Site: Columbia, 05000000, Washington Public Power Supply System, Satsop
Issue date: 07/21/1980
From: Jackson H
SENATE, ENERGY & NATURAL RESOURCES
To: Kammerer C
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
Shared Package
ML082840625 List: ... further results
References
FOIA-83-575 NUDOCS 8012160551
Download: ML20083L310 (2)


Text

.....

- [e S. sN'[.I.I.. ~(*[e'u'eI. eYa' s.

k em

)

.....m.

,,,.......m...

D'!*." ",*".'.7l *."..'~.* ;'.1*."C."?.

3(nileb,${ct{es aenctfe c,

, T". 7.'a,'.*6 r...J..:'0 "*"...

-co--iraco~

. 6a ENtnGy AND N ATUR AL RESOURCES o n.. p.s,e s. e,.e, e. sc, w

W AsMINGTON. D.C. 20$10

  • "!.".'.'.'20".*,"O*,We ---

July 21, 1980 Mr. Carlton C. Kammerer Director, Office of Con'Tressional Affairs Nuclear Regulatory Comm ssion 1717 H Street N.W.

'.:3, Washington, D.C.

20555

~

Dear Mr. Kammerer:

The enclosed is respectfully submittec} tio you for every proper consideration.

Please provide me with a report in dupli-cate and send your response and the ' enclosure

~

directly to my Seattle office at 802 United States Courthouse, Seattle, Washington 98104 (telephone 206/442-7476, FTS 399-7476).

4 Sincerely

urs, Henry M.

ackson, U.S.S.

HMJ:gb Enclosure XA Copy Has Been Sent to PDR I

I 60' y

t I

O y.

D

...43 QP(,b w....

PYRAMID ENTERPRISES 4617 Darien Drive No.

Tacoma, Washington 98407 (206) 759-8084 h*

4 1

gua_ z 1m 1

UNSTED STATES SENATE COhh3TTEE ON ENERGV AND HATSONAL RESOURCES 3

WASH 3NGTON D.C. 20510

.q--

~ '

^.E Att: Henry'n. fackson Dean nr. fackson:

w 3 am appaMed at the logic used by ceAtain Government Agencies in app. lying punative measures against. Local Public Agencies.

3 am referring in partica.lar to 2.he Nuc.lcar,Reputatory Commission in.t. heir judgement of the Washington Pub.Lic Power Supply System and the impending fine of some 360,000.00.

Who in heavans name do they think is going to wind up paying this tidg JH+1e sum?

Don't take me wrong; Sam not against the intent, and insistence that correct.ive measures be demanded for shoddy workmanship, and design deficiencies.

To saddle the PubLie though with any more unnecessary cost.s in these depressed tim es, is uncatied for and irresponsible.

Where do you stand along 2.hese Lines? Can Pub.Lic buying capability be improved with more and more burdens pi. Led on?

~

3've been in the Construction Business for some 45 years and see a crying need for more rea.listic p.lanning and.Less inefficiency and feather bedding.

The Genera.L Pubiic has litt.de or not.hing to say about how t.hcLa money is used on some of these billion dottar projects, but possibly by getting some initiatives started can. turn this situation around.

Voj v.

kru.ly, (g.

d. Bonhch se

&A, 1

W

,g,,

em m e pes *WN%**

$ "M N * "

N'

_M_**'*$.

_D N

_