Rev 1 to Monthly Operating Rept for Sept 1983
ML20081B619
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/30/1983
From: Murray T, Sarsour B
TOLEDO EDISON CO.
To: Haller N
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
K84-216, NUDOCS 8403090251
Download: ML20081B619 (2)


Text

_ _ __ . _ _ . _ _ _-- . _ _

5 Rev. 1 - 2/22/86 1 -

OPERATING DATA REPORT i - DOCKET NO. 50-346 DATE October 7, 1983 COMPLETED BY Bilal Sarsour TELEPHONE 419-239-3000, Extension 384 OPERATING STATUS i I

1. Unit Name: _ Davis-Besse Unit 1 Notes
2. Reporting Pened September 1983

-- 3. Licensed Thermal Power (MWt): 2772

4. Nameplate Rating (Gross MWe): 925 *
5. Design Electrical Rating (Net MWe): 906
6. Maximum Dependable Capacity (Gross MWe): 918
7. Maximum Dependable Capacity (Net MWe): 874
8. If Changes Occur in Capacity Ratings (Items Number 3 Through r) Since Last Repon. Give Reasons:
9. Power Level To Which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr.-to.Date Cumulative

11. Hours In Reporting Period 720 6,551 45,312
12. Number Of Hours Reactor Was Critical 88.2 4,679.4 25,574.9
13. Reactor Reserve Shutdown Hours 0.0 469.5 3.833.6
14. Hours Generator On Line 3.2 4.542.0 24.301.6
15. Unit Reserve Shutdown Hours 0.0 0.0 1.732.5
16. Gross Thermal Energy Cenerated (MWH) 6,187.0 11,540,329 56,913,000 .

'l 17. Gross Electrical Energy Generated (MWH)' 3 64 .D.. 3.841.514 18.947.168

18. Net Electrical Energy Generated (MWH) 0.0 3.631.352 17.746.792
19. Unit Service Factor 0.4 69.3 53.6
20. Unit A'vailability Factor 0.4 69.3 57.5 21.' Unit Capacity Factor (Using MDC Net) 0.0 -63.4 44.8
22. Unit Capacity Factor (Using DER Net) 0.0 61.2 43.2 4
23. Unit Forced Outage Rate 0.0 9.5 18.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t: .

r~

L 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

. 26. Units in Test Status (Prior to Commercial Operation): ' Forecast Achiesed INITIAL CRITICALITY

  • INITIA L ELECTRICITY COMMERCIA L OPERATION 4

8403090251 830930 guj77)

PDR ADOCK 05000346 R PDR _

ps- . o n - -,y -e. p -

e-- ,-r,---- --<w=-- -,--w e -w < w - w w,er,-=m.-.-t-,--,-r-,-me *r- e",--Pwiv. r-w---

  • r ym- st--Te'- e
  • ~ .o 4

TOLEDO

%ss EDISON February 22, 1984 Log No. K84-216 File: RR 2 (P-6-83-09, Docket No. 50-346 P-6-83-10, License No. NPF-3 P-6-83-11, P- 6-83-12)

Mr. Norman Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Haller:

Attached are ten copies of Revision 1 to the Operating Data Report which is a part of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1 for the months of September 1983, October 1983, November 1983, and December 1983.

The revision to each Operating Data Report changed the Year-to-Date value for item 17, Cross Electrical Energy Generated (MWH). Please remove and destroy the previous Operating Data Reports for the subject months and replace with the attached revised pages.

If you have any questions, please fee-1 free to contact Bilal Sarsour at (419) ~ 259-5000 Extension 384.

Yours truly, Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/BMS/1jk

~

Attachments cc: -Mr. James C. Keppler, w/1 Regional Administrator, Region III Mr. Richard DeYoung, Director, w/2 Office of Inspection and Enforcement Mr. Walt Rogers, w/1 NRC Resident Inspector i g i

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, CHIO 43652