ML20062G268

From kanterella
Jump to navigation Jump to search

Forwards Proposed Amends to Tech Specs & to Environ Tech Specs of Subj Facils,Minus Section on Solid Radioactive Waste Which Is Still Under Dev.Requests Delay of Implementation to 790701 or Later Pending Review Completion
ML20062G268
Person / Time
Site: Hatch  
Issue date: 12/21/1978
From: Whitmer C
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
TAC-08043, TAC-08095, TAC-8043, TAC-8095, NUDOCS 7812270274
Download: ML20062G268 (400)


Text

. - _.

e...

e (y f d 39,9 I% r/.+ * '. #L f h *' r /

z u e,.n:,...

9,..:

g....x,,.i.

[t; m, e, > r s

.m ni... u.,, 9 :. y,.:,w b

O Georgia Power c= r ww~

v a pr~. + -

Eng.nm'.r ';

'hU 6' 'UPM ' *"' C rr V

December 21, 1978 I

Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission f'

Uashington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 RADIOLOGICAL EFFLUENT TECHNICAL SPECIFICATIONS Gentlemen:

Pursuant to the guidance provided by 11r. D. B. Vasallo's letter dated July 10, 1978, and by lir. B. K. Grimes' letters of July 11 and November 15, 1978, Georgia Power Company hereby submits proposed amendments to the Tech-nical Specifications and to the Environmental Technical Specifications of Plcut Hatch Units 1 and 2, respectively.

PIcase note that the section for solid radioactive waste is not included in this sub:aittal. Because the curreat NUREG-0473 (Model Technical Specifica-tions) specify strict requirements fc,r solidifi' cation, and the section for solid radioactive waste in NUREG-0473 is not directly applicable to the current operational practice at the Hatch Nuclear Plant, it is thus Georgia Power Company's position that the submittal of the solid radioactive waste section at this time is impractical and premature.

However, Georgia Power Company has formed a task group and initiated a study to review the entire solid waste processing system and to develop appropriate technical specifica-tions for this system. We will be pleased to discuss any progress in this area as our study continues.

In order to achieve a smooth transition from the existing requirements to the proposed Technical Specifications, Georgia Power Company requests MN,ww was IAL m

7gijig,7 0F7M T>

1

Georgia Power e4 2

Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission December 21, 1978 Page 2 that implementation of these proposed specifications be delayed until July 1, 1979, or, should the review process not be completed by then, the next January 1 or July 1 following upproval.

This delay in imple-mentation will provide time for the training, programming, and proce-dural changes which will be necessary due to these proposed changes to the Technical Specifications, and will allow for initiation of the program at the beginning of a reporting period.

{

Yours very truly, V

C) h A,

s Chas. F. Whitmer

(

V110/mb Attachment Svern to and subscribed before me this 21st day of December,1978.

k.

?!bt D

/$

?

~~fdotaif Public, ceorgia StatWeteryo Public My Comtnission Empires Sept. 29,1981 xe: lir kuble A. Thomas George F. Trowbridge, Esquire gggesent k

i l.

I

e, n.ano.+

~

ATTACHMENT 1 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 PROPOSED DETERMINATION OF AMENDMENT CLASS The attached proposed changes to the Technichi Specifications and Environmental Specifications for Plant Hatch Units 1 and 2 were required by NRC letters dated July 10, 1978, July 11, 1978, and November 15, 1978.

Therefore, no determinations of amendment class is necessary.

C C

l l

1

ATTACHMENT 2 NRC DOCKET 50-321 OPERATINC LICENSE DPR-57 EDWIN 1. HATCH NUCLEAR PLANT UNIT 1 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS The proposed changes to the Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

1.

Replace page 3.2-18 with page 3.2-18.

2.

Insert pages 1-1 through 1-3 following page 1.0-7.

3.

Insert pages 3/4 3-44 through 3/4 16-17 following page 3.13-12.

4.

Replace pages 6-1 through 6-26 with pages 6-1 through 6-29.

The proposed changes to the Environmental Technical Specifications (Appendix B to Operating License DPR-57) would be incorporated by replacing the entire document.

l i

l N

\\

Note: The enclosed Off-site Dose Calculation Manual is not part of the Technical Specifications.

ATTACIDfENI 3 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS The proposed changes to the Technical Specifications (Appendix A to Operating License NPF-5) would be incorporated as follows:

1.

Replace page v with page v 2.

Add page ixa 3.

Replace page xvi with page xvi 4.

Add pages 1-6a through 1-7 5.

Replace pages 3/4 3-44 through 3/4 3-46 with pages 3/4 3-44 through 3/4 3 46.

6.

Add pages 3/4 60a through 3/4 60s 7.

Add pages 3/4 11-1 through 3/4 12-11 8.

Add pages B 3/4 3-4 through B 3/4 12-1 9.

Replace pages 6-1 through 6-19 with pages 6-1 through 6-29 The proposed changes to the Environmental Technical Specifications (Appendix B to Operating License NPF-5) would be incorporated by replacing the entire document.

The enclosed Off-site bose Calculational Manual is not part of the Note:

Technical Specifications.