Comments on Re Necessity of Recirculating Suppl Environ Statement Concerning Alternate Sites for Subj Facil. Disagrees W/Recirculation Because of Negative Benefit Cost Ratio for Consuming PublicML20062D920 |
Person / Time |
---|
Site: |
05000471 |
---|
Issue date: |
10/24/1978 |
---|
From: |
Lydon J BOSTON EDISON CO. |
---|
To: |
Boland E HOUSE OF REP. |
---|
Shared Package |
---|
ML20062D902 |
List: |
---|
References |
---|
NUDOCS 7812010050 |
Download: ML20062D920 (2) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18011B1361994-12-13013 December 1994 Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20059M8421990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20151V9791988-07-28028 July 1988 Partial Response to FOIA Request for Documents Re Plant.App a Documents Encl & Available in PDR ML20206F3261986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in Pdr.W/O App B & C Documents ML20206F3301986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in PDR ML20099J8141984-04-25025 April 1984 FOIA Request for Documents Re Electrical Relay Failures Including Class 1E Relay Failures at Listed Plants & Utilization of GE Type Hfa 51 Series Ac Relays or Other Relays Using Lexan as Coil Spool Matl ML20027A8911982-09-22022 September 1982 FOIA Request for NRC Preliminary & Final Calculations of Reactor Accident Consequence Results for Facilities ML20086Q7091982-07-28028 July 1982 Forwards Analyses of Antirotation Pin & Impeller Ring Wear, Per Request.Encl Info Should Be Treated as company- Sensitive ML20055A2601982-05-28028 May 1982 Responds to FOIA Request for Documents Re Requests by Licensees for Exemption or Extension Beyond 820201 Date Specified by Final Rule,Commission Analysis,Comments,Or Actions Re Emergency Planning.Forwards App a Documents ML20051P0041982-05-0707 May 1982 Advises of Util Position Declining to Pay Charges Asserted in NRC 820415 Ltr.Charges W/O Regulatory Basis.Other Reasons for Declining Asserted in Pending Case of New England Power Co Vs NRC ML20042B4561982-03-19019 March 1982 Ack Receipt of Response to 820203 Ltr.Requests NRC Evaluation of Revised Emergency Plans & Any Addl Public Documents Re Communications Between Util & NRC Concerning Emergency Plans ML20042B7141982-03-19019 March 1982 Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML20009H6841981-08-0303 August 1981 Forwards Updated Population Data & Description of Road Network Improvements Projected During First Yr of Plant Operation,In Response to NRC 810724 Request Re Evacuation Time & Population Estimates ML20010C5851981-05-27027 May 1981 Advises That Because of M Cleeton Medical History,Any Extra Radiation Would Pose Risk.Certificate of Svc Encl ML20004B6901981-05-19019 May 1981 Forwards AR & MW Cleeton Exceptions to ASLB Partial Initial Decision ML19347E9231981-05-11011 May 1981 Forwards Endorsements 45 & 46 to Maelu Policy MF-58 ML20008F9011981-05-0606 May 1981 Clarifies Response to 10CFR50.34(e) Provided in PSAR Amend 43 Per 810506 Request.Test Date & Analysis Will Include Igniter Performance & Endurance Characteristics If Option Chosen Continues to Be Deliberate Ignition Sys ML19347E5171981-05-0505 May 1981 Clarifies Statement in 810429 PSAR Amend 43 Re Containment Sys Design Integrity,In Response to NRC 810505 Telcon Request ML20004F3831981-04-30030 April 1981 Forwards Util Latest Annual Rept,Portions of Which May Be Pertinent to Issues in Proceeding.Certificate of Svc Encl. W/O Rept.Related Correspondence ML19347D8511981-03-31031 March 1981 Forwards Endorsements 5 & 6 to Nelia Binder EB-31, Endorsement 5 to Maelu Binder XB-31,Endorsement 44 to Maelu Policy MF-58 & Endorsement 58 to Nelia Policy NF-188 ML19350C7931981-03-19019 March 1981 Informs That Commonwealth of Ma Reviewed Parties' Responses to ASLB 810219 Order.Aslb Should Schedule Hearings on Emergency Planning & Other TMI-related Issues for Sept 1981 ML19343D5261981-03-0404 March 1981 Advises of Review of Evacuation Roadway Network Re Facility. Traffic Control Beyond Emergency Planning Zone Will Avoid Congestion within Zone.Effective Traffic Mgt Plan Is Needed ML19350B5321981-02-27027 February 1981 Informs That Commonwealth of Ma Needs Time to Evaluate Suppl to SER Re Emergency Planning,To Prepare New Interrogatories, to Evaluate Answers to Interrogatories & to Prepare Written Testimony.W/Notice of Appearance & Certificate of Svc ML19341D4641981-02-25025 February 1981 Forwards Intervenors Cleeton Exceptions to ASLB 810202 Partial Initial Decision ML19341C4871981-02-24024 February 1981 Forwards Endorsement 43 to Maelu Policy MF-58 ML19341C9131981-02-23023 February 1981 Requests Svc of Documents Upon Util Be Made to Tg Dignan Instead of Gh Lewald.Address Unchanged ML20003C1181981-02-18018 February 1981 Forwards Commonwealth of Ma 810218 Exceptions to ASLB 810202 Partial Initial Decision ML20003B4821981-02-0909 February 1981 Forwards Endorsements 56,57 & 4 to ANI Policies NF-188, NF-188 & Binder EB-31,respectively & Endorsement 4 to Maelu Binder XB-31 ML19341B2671981-01-23023 January 1981 Informs of No Plans for Filing Application & Review Requests,Per NRC 801205 Request.Cp Receipt or Const Completion Dates Undetermined Until NRC Issuance of Policy for Resumption of CP Licensing ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19347B3151980-10-10010 October 1980 Forwards Amend 40 to Psar.Amend Incorporates Revised Section 13.3,emergency Planning,In Response to Final Emergency Planning Rule ML20062J3251980-09-30030 September 1980 Discusses Emergency Planning Regulations,In Response to Re L Boyd Concerns.Fema Is Responsible for Adequacy of Emergency Preparedness in States & Communities Around Nuclear Plants ML19331E2871980-07-14014 July 1980 Forwards Recommendation for Item 3.1.6/3.2.4 Re Cable Combustibility for Fire Protection Review.Recommends That Licensee Be Required to Coat Okonite & Kerite Cables ML19330C2071980-07-14014 July 1980 Responds to IE Bulletin 80-11, Masonry Wall Design. Inaccessible Block Walls Surveyed & Program to re-evaluate Walls Near safety-related Sys Developed.Justification for re-evaluation Criteria to Be Submitted by 801108 ML19323H6951980-06-0909 June 1980 Request Mod of First Page of Distribution List.Distribution List Encl ML19323G8941980-05-0202 May 1980 Responds to ASLB 800327 Order Requesting Date of Planned Testimony Re Emergency Planning Issue.Written Testimony Will Be Filed within 4-6 Wks from Receipt of NRC Evaluation. Related Correspondence ML19323F3761980-05-0101 May 1980 Submits Applicants' Response to ASLB 800327 Order Re Emergency Planning Hearing.Requests Reconsideration of ASLB Position on Previously Admitted Contention Re Emergency Planning.Related Correspondence Encl ML19323A8721980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML19323A8681980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML20062J3301980-04-18018 April 1980 Requests Response to Encl L Boyd Inquiry About Emergency Preparedness Around Facility ML19323G2211980-04-0808 April 1980 Expresses Concern Re on-job Intoxication of Facility Employees.Boston Herald American 800403 Article Encl ML19305C3711980-03-17017 March 1980 Responds to NRC Request Re Necessity of Antitrust Hearing Following Ma Municipals' Withdrawal of Petition to Intervene.Antitrust Hearing Unnecessary Re Instant Application ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19296D2931980-02-25025 February 1980 Forwards Endorsement 38 to Maelu Policy MF-58 ML19294B9081980-02-14014 February 1980 Corrects Typographical Errors & Omissions in Applicant 800209 Statement Filed in Response to ASLB Request Re Emergency Planning as Proper Issue in Hearings ML19260D6061980-02-0505 February 1980 Forwards Endorsements 50 & 51 to Nelia Policy NF-188 1994-12-13
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML19323A8721980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML19323A8681980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML19247B1291979-07-11011 July 1979 Forwards Suppl Response to Interrogatory 39,containing Missing Entries for Nuclear Fuel Data.Certificate of Svc Encl ML19207C4211979-07-0909 July 1979 Ack Receipt of 790703 Ltr Re Request for PSAR Amends 22,34 & 36.Renews Request for Copies of PSAR Amends at Earliest Convenience ML20136C3981979-06-25025 June 1979 Requests Copies of Amends 22,34 & 36 to Psar.Amends Are Missing from Files & Records ML19289D8681979-01-0909 January 1979 Questions Legal Procedures Re Abbreviated Recirculation of Fes Suppl Re Alternative Sites Analysis.Asserts Truncated Procedure Is Improper ML20062D9201978-10-24024 October 1978 Comments on Re Necessity of Recirculating Suppl Environ Statement Concerning Alternate Sites for Subj Facil. Disagrees W/Recirculation Because of Negative Benefit Cost Ratio for Consuming Public 1980-04-30
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML19323A8721980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML19323A8681980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML19247B1291979-07-11011 July 1979 Forwards Suppl Response to Interrogatory 39,containing Missing Entries for Nuclear Fuel Data.Certificate of Svc Encl ML19207C4211979-07-0909 July 1979 Ack Receipt of 790703 Ltr Re Request for PSAR Amends 22,34 & 36.Renews Request for Copies of PSAR Amends at Earliest Convenience ML20136C3981979-06-25025 June 1979 Requests Copies of Amends 22,34 & 36 to Psar.Amends Are Missing from Files & Records ML19289D8681979-01-0909 January 1979 Questions Legal Procedures Re Abbreviated Recirculation of Fes Suppl Re Alternative Sites Analysis.Asserts Truncated Procedure Is Improper ML20062D9201978-10-24024 October 1978 Comments on Re Necessity of Recirculating Suppl Environ Statement Concerning Alternate Sites for Subj Facil. Disagrees W/Recirculation Because of Negative Benefit Cost Ratio for Consuming Public 1980-04-30
[Table view] |
Text
_ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
e
- d BOSTON EctsON COMPANY G O O BOYLETQN STptET
~- . BOSTON. MAssACHUSCTTS D2199 f t aAwes u. i.voeu October 24, 1978 m........,
'D *N 'cNv ios 'd cuwsca 828L98100 The Honorable Edward P. Boland ^
f 2111 Rayburn House Office Building A8 03AEKP3 Washington, D. C. 20515
Dear Congressman Boland:
I would like to take this opportunity to respond to a letter addressed to your office from Mr. Harold R. Denton, Director, Office of Nuclear Regulation dated October 17, 1978, which Boston Edison also received as a party to the proceeding with respect to the necessity of recirculation of a supplemen-tary Environmental Statement in regard to the alternative sites issue for Boston Edison's proposed Pilgrim Unit 2.
In his letter Mr. Denton indicated a willingness to con-sider any information Boston Edison wished to provide to his office and this information would be taken into consideration before a decision is made on whether recirculation of the En-vironmental Statement on the alternative sites is necessary or whether the issue could be brought %directly to a resumed Atomic Safety and Licensing Board (ASLB) hearing when the NRC staff analysis on the alternative sites issue is completed.
Attached is our legal memorandum which was transmitted to Mr. Denton on October 20, 1978 which we believe sets forth j the points and authorities which support our position that re- !
circulation of a supplemental Environmental Statement is not legally required under NEPA or the Commission's NEPA regulation.
We believe our legal arguments point out that it is un- .
necessary to invoke the procedures for preparation and recircu-lation of a supplementary Environmental Statement. Our memo-randum shows there is nothing in the decisions of the Atomic Safety and Licensing Board or Appeal Board that requires the use of the supplementary Environmental Statement process.
Recent decisions of the Appeal Boards, the Nuclear Regu-latory Commission, and the Federal Courts also support the argu-ment that NRC need.not use the supp'.ementary Environmental State-ment process unless there is some major change in project scope or major change in NRC staff findings. .
781201CoSO
Co hDN EDISDN COMPANY '
s ,
, n.
Congressman Edward P. Boland October 24, 1978 4
You should be aware that the ASLB has the power and the opportunity to collect environmental information such as that on alternative sites, and subsequently modify the Environmen-tal Statement if necessary.
Since the ASLB has the power to do this, their doing so would mean eliminating a three month delay in the issuance by the ASLB of a Limited Work Authorization (LMA) and a potential savings of $45 million for consumers.
According to an article in the Wal~l Stir'est J6hriial of October 18, 1978 the White House is stepping up efforts with
- agencies to cut the cost that businesses incur in complying with their regulations that cause undue hardship for particu-lar industries. White House meetings have been marked by sharp debate and " massive overreaction by everybody", according to one government official.
We believe that there is no need for recirculation of the supplementary Environmental Statement by the NRC as the public benefit of recirculation must be weighed .against the costs of recirculation. The cost of three months of delay,
$45 million', will be borne by the public. Stated simply, we believe it has a negative Benefit Cost ratio for our consuming public.
Sincerely, jw /L M t-MC