ML20030B886
ML20030B886 | |
Person / Time | |
---|---|
Site: | 05000471 |
Issue date: | 08/18/1981 |
From: | Hermann H HERRMANN, H., MASSACHUSETTS WILDLIFE FEDERATION |
To: | Buck J, Kohl C, Moore T NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP) |
References | |
NUDOCS 8108250102 | |
Download: ML20030B886 (2) | |
Similar Documents at 05000471 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18011B1361994-12-13013 December 1994
[Table view]Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20059M8421990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20151V9791988-07-28028 July 1988 Partial Response to FOIA Request for Documents Re Plant.App a Documents Encl & Available in PDR ML20206F3261986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in Pdr.W/O App B & C Documents ML20206F3301986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in PDR ML20099J8141984-04-25025 April 1984 FOIA Request for Documents Re Electrical Relay Failures Including Class 1E Relay Failures at Listed Plants & Utilization of GE Type Hfa 51 Series Ac Relays or Other Relays Using Lexan as Coil Spool Matl ML20027A8911982-09-22022 September 1982 FOIA Request for NRC Preliminary & Final Calculations of Reactor Accident Consequence Results for Facilities ML20086Q7091982-07-28028 July 1982 Forwards Analyses of Antirotation Pin & Impeller Ring Wear, Per Request.Encl Info Should Be Treated as company- Sensitive ML20055A2601982-05-28028 May 1982 Responds to FOIA Request for Documents Re Requests by Licensees for Exemption or Extension Beyond 820201 Date Specified by Final Rule,Commission Analysis,Comments,Or Actions Re Emergency Planning.Forwards App a Documents ML20051P0041982-05-0707 May 1982 Advises of Util Position Declining to Pay Charges Asserted in NRC .Charges W/O Regulatory Basis.Other Reasons for Declining Asserted in Pending Case of New England Power Co Vs NRC ML20054C9951982-04-15015 April 1982 Requests Fee Be Remitted for Review of Withdrawn Application ML20042B4561982-03-19019 March 1982 Ack Receipt of Response to .Requests NRC Evaluation of Revised Emergency Plans & Any Addl Public Documents Re Communications Between Util & NRC Concerning Emergency Plans ML20042B7141982-03-19019 March 1982 Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML20010H7411981-09-25025 September 1981 Advises That NRC Is Not Filing Response to Intervenors Contentions Re Emergency Planning & TMI-2 Issues ML20031A9921981-09-23023 September 1981 Forwards Listed Documents in Response to Cleeton 810814 Request for Production of Documents ML20010H2041981-09-23023 September 1981 Forwards Gh Patrick Resume ML20031A3171981-09-21021 September 1981 Forwards Documents Responsive to Commonwealth of Ma 810825 Second Set of Requests for Production of Documents Directed to NRC Re Emergency Planning.W/O Encl ML20031A1191981-09-17017 September 1981 Responds to Commonwealth of Ma 810819 First Set of Document Requests Directed to NRC Re TMI Issues.Documents in Response to Interrogatory 10 Will Be Provided Once Witnesses to Be Offered Are Identified ML20033C5341981-09-11011 September 1981 Responds to FOIA Request for Eight Categories of Documents Re Emergency Planning for Facilities.Forwards Documents Listed in App ML20010G1131981-09-10010 September 1981 Forwards Documents to Aid in Preparing Testimony.W/O Encl ML20010F8911981-09-10010 September 1981 Forwards Documents Supplementing NRC Prior Production Per Util 810701 Document Request 1 Re Emergency Planning. W/O Encl ML20030D2381981-08-28028 August 1981 Forwards NRC & Commonwealth of Ma 810820 Agreement, Inadvertently Omitted from NRC 810827 Motion for Protective Order ML20030C9761981-08-27027 August 1981 Forwards Commonwealth of Ma Emergency Planning Contentions for Use in Preparation of Testimony.Direct Testimony Must Be Filed by 810911 ML20030C5511981-08-25025 August 1981 Forwards Bk Grimes Affidavit for Attachment to NRC 810824 Response to Commonwealth of Ma Second Set of Interrogatories.Certificate of Svc Encl ML20010D1151981-08-20020 August 1981 Confirms Ground Rules for 810820 Informal Questioning of NRC Personnel.Also Confirms Agreement That All Motions Re First Set of Interrogatories Are Moot & Essentially Withdrawn ML20030B8861981-08-18018 August 1981 Requests to Be Excused from Participation in Oral Argument Scheduled for 810901.Issues Have Been Joined & Briefed & Oral Argument Is Not Essential.Request Partially Due to Budgetary Restraints ML20010C1211981-08-14014 August 1981 Requests That ASLB Defer Any Ruling on NRC 810710 Motion for Protective Order & Commonwealth of Ma 810724 Response to Motion.Nrc & Commonwealth of Ma Are Consulting Informally Re Interrogatories & Document Requests ML20010B3281981-08-0505 August 1981 Advises of Issue Raised in CP Proceeding Re Feasibility of Developing Adequate Emergency Plan by OL Stage of Proceeding.Fema Testimony Will Be Needed ML20009H6841981-08-0303 August 1981 Forwards Updated Population Data & Description of Road Network Improvements Projected During First Yr of Plant Operation,In Response to NRC 810724 Request Re Evacuation Time & Population Estimates ML20010C2431981-07-28028 July 1981 Forwards All Matl Re Evaluation of Facility Evacuation Time Estimates Per Request ML20009E2861981-07-24024 July 1981 Forwards Document Referenced on Page 20 of SER Suppl 6, Which NRC Made Available to Applicants at 810408 Meeting.W/O Encl ML20031F3231981-07-22022 July 1981 Summarizes 255th ACRS Meeting on 810709-11 in Washington,Dc Re Safety Research Program Budget for FY83,TMI-1 Restart, Rept on New Safety Concepts for Future Const,Subcommittee Activity & Future Schedule ML20009B7911981-07-15015 July 1981 Forwards SER Suppl on Emergency planning,810715 Interrogatory Answers & Affidavit to Be Notarized.W/O Encl ML20009B5061981-07-15015 July 1981 Forwards ACRS Re Application of TMI-2 Action Plan to Facility ML20009B3301981-07-10010 July 1981 Requests That NRC Notify N Reynolds That 810622 Petition for Extension of Deadline for Compliance w/CLI-80-21 Has Been Retitled.Svc Should Be Made of All Subsequent Papers on Parties to Proceeding,Including Ucs ML20010B5371981-07-0909 July 1981 Confirms 810701 Conversation.Licensee Has Revised Population Data Used in Evaluation of Evacuation Time Estimates ML20033C5451981-07-0101 July 1981 Forwards Review of Facility Equipment Air Locks as Described in Util 810401 Emergency Plan ML20005A3991981-06-29029 June 1981 Forwards Advanced Copy of SER Suppl 6 Per 810624 Request. W/O Encl ML20030D6581981-06-29029 June 1981 Advises That Toledo Edison Co & IA Electric Light & Power Co Should Be Included as Petitioners in Licensee 810622 Petition Requesting Commission Extension of Deadline Imposed by CLI-80-21 ML19350F0001981-06-22022 June 1981 Forwards Suppl 6 to Facility Ser.W/O Encl ML20037D2811981-06-18018 June 1981 Forwards Suppl 6 to SER for Facility.W/O Encl NUREG-0718, Forwards SER Suppl 6 Re NRC Evaluation of Util Compliance W/ TMI Lessons Learned Requirements.No Issues to Be Resolved Prior to CP Decision.W/O Encl1981-06-18018 June 1981 Forwards SER Suppl 6 Re NRC Evaluation of Util Compliance W/ TMI Lessons Learned Requirements.No Issues to Be Resolved Prior to CP Decision.W/O Encl ML20004C9141981-06-0404 June 1981 Forwards Suppl 5 to Facility Ser.W/O Encl ML20009B1301981-06-0303 June 1981 Forwards Suppl 5 to SER for Facility.W/O Encl ML20010C5851981-05-27027 May 1981 Advises That Because of M Cleeton Medical History,Any Extra Radiation Would Pose Risk.Certificate of Svc Encl ML20004B6901981-05-19019 May 1981 Forwards AR & MW Cleeton Exceptions to ASLB Partial Initial Decision 1994-12-13 Category:INCOMING CORRESPONDENCE MONTHYEARML18011B1361994-12-13013 December 1994
[Table view]Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld ML20099J8141984-04-25025 April 1984 FOIA Request for Documents Re Electrical Relay Failures Including Class 1E Relay Failures at Listed Plants & Utilization of GE Type Hfa 51 Series Ac Relays or Other Relays Using Lexan as Coil Spool Matl ML20027A8911982-09-22022 September 1982 FOIA Request for NRC Preliminary & Final Calculations of Reactor Accident Consequence Results for Facilities ML20086Q7091982-07-28028 July 1982 Forwards Analyses of Antirotation Pin & Impeller Ring Wear, Per Request.Encl Info Should Be Treated as company- Sensitive ML20051P0041982-05-0707 May 1982 Advises of Util Position Declining to Pay Charges Asserted in NRC .Charges W/O Regulatory Basis.Other Reasons for Declining Asserted in Pending Case of New England Power Co Vs NRC ML20042B4561982-03-19019 March 1982 Ack Receipt of Response to .Requests NRC Evaluation of Revised Emergency Plans & Any Addl Public Documents Re Communications Between Util & NRC Concerning Emergency Plans ML20042B7141982-03-19019 March 1982 Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML20030B8861981-08-18018 August 1981 Requests to Be Excused from Participation in Oral Argument Scheduled for 810901.Issues Have Been Joined & Briefed & Oral Argument Is Not Essential.Request Partially Due to Budgetary Restraints ML20009H6841981-08-0303 August 1981 Forwards Updated Population Data & Description of Road Network Improvements Projected During First Yr of Plant Operation,In Response to NRC 810724 Request Re Evacuation Time & Population Estimates ML20010C2431981-07-28028 July 1981 Forwards All Matl Re Evaluation of Facility Evacuation Time Estimates Per Request ML20009B3301981-07-10010 July 1981 Requests That NRC Notify N Reynolds That 810622 Petition for Extension of Deadline for Compliance w/CLI-80-21 Has Been Retitled.Svc Should Be Made of All Subsequent Papers on Parties to Proceeding,Including Ucs ML20033C5451981-07-0101 July 1981 Forwards Review of Facility Equipment Air Locks as Described in Util 810401 Emergency Plan ML20030D6581981-06-29029 June 1981 Advises That Toledo Edison Co & IA Electric Light & Power Co Should Be Included as Petitioners in Licensee 810622 Petition Requesting Commission Extension of Deadline Imposed by CLI-80-21 ML20010C5851981-05-27027 May 1981 Advises That Because of M Cleeton Medical History,Any Extra Radiation Would Pose Risk.Certificate of Svc Encl ML20004B6901981-05-19019 May 1981 Forwards AR & MW Cleeton Exceptions to ASLB Partial Initial Decision ML19347E9231981-05-11011 May 1981 Forwards Endorsements 45 & 46 to Maelu Policy MF-58 ML20008F9011981-05-0606 May 1981 Clarifies Response to 10CFR50.34(e) Provided in PSAR Amend 43 Per 810506 Request.Test Date & Analysis Will Include Igniter Performance & Endurance Characteristics If Option Chosen Continues to Be Deliberate Ignition Sys ML19347E5171981-05-0505 May 1981 Clarifies Statement in 810429 PSAR Amend 43 Re Containment Sys Design Integrity,In Response to NRC 810505 Telcon Request ML20004F3831981-04-30030 April 1981 Forwards Util Latest Annual Rept,Portions of Which May Be Pertinent to Issues in Proceeding.Certificate of Svc Encl. W/O Rept.Related Correspondence ML19347D8511981-03-31031 March 1981 Forwards Endorsements 5 & 6 to Nelia Binder EB-31, Endorsement 5 to Maelu Binder XB-31,Endorsement 44 to Maelu Policy MF-58 & Endorsement 58 to Nelia Policy NF-188 ML19350C7931981-03-19019 March 1981 Informs That Commonwealth of Ma Reviewed Parties' Responses to ASLB 810219 Order.Aslb Should Schedule Hearings on Emergency Planning & Other TMI-related Issues for Sept 1981 ML19343D5261981-03-0404 March 1981 Advises of Review of Evacuation Roadway Network Re Facility. Traffic Control Beyond Emergency Planning Zone Will Avoid Congestion within Zone.Effective Traffic Mgt Plan Is Needed ML19350B5321981-02-27027 February 1981 Informs That Commonwealth of Ma Needs Time to Evaluate Suppl to SER Re Emergency Planning,To Prepare New Interrogatories, to Evaluate Answers to Interrogatories & to Prepare Written Testimony.W/Notice of Appearance & Certificate of Svc ML19341D4641981-02-25025 February 1981 Forwards Intervenors Cleeton Exceptions to ASLB 810202 Partial Initial Decision ML19341C4871981-02-24024 February 1981 Forwards Endorsement 43 to Maelu Policy MF-58 ML19341C9131981-02-23023 February 1981 Requests Svc of Documents Upon Util Be Made to Tg Dignan Instead of Gh Lewald.Address Unchanged ML20003C1181981-02-18018 February 1981 Forwards Commonwealth of Ma 810218 Exceptions to ASLB 810202 Partial Initial Decision ML20003B4821981-02-0909 February 1981 Forwards Endorsements 56,57 & 4 to ANI Policies NF-188, NF-188 & Binder EB-31,respectively & Endorsement 4 to Maelu Binder XB-31 ML20031E1761981-02-0505 February 1981 Ack Receipt of 810122 Request Re Evacuation Time Estimates for Facilities.Memo Will Be Provided by 810306 ML19341B2671981-01-23023 January 1981 Informs of No Plans for Filing Application & Review Requests,Per NRC 801205 Request.Cp Receipt or Const Completion Dates Undetermined Until NRC Issuance of Policy for Resumption of CP Licensing ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19347B3151980-10-10010 October 1980 Forwards Amend 40 to Psar.Amend Incorporates Revised Section 13.3,emergency Planning,In Response to Final Emergency Planning Rule ML19330C2071980-07-14014 July 1980 Responds to IE Bulletin 80-11, Masonry Wall Design. Inaccessible Block Walls Surveyed & Program to re-evaluate Walls Near safety-related Sys Developed.Justification for re-evaluation Criteria to Be Submitted by 801108 ML19331E2871980-07-14014 July 1980 Forwards Recommendation for Item 3.1.6/3.2.4 Re Cable Combustibility for Fire Protection Review.Recommends That Licensee Be Required to Coat Okonite & Kerite Cables ML19323H6951980-06-0909 June 1980 Request Mod of First Page of Distribution List.Distribution List Encl ML19323G8941980-05-0202 May 1980 Responds to ASLB 800327 Order Requesting Date of Planned Testimony Re Emergency Planning Issue.Written Testimony Will Be Filed within 4-6 Wks from Receipt of NRC Evaluation. Related Correspondence ML19323F3761980-05-0101 May 1980 Submits Applicants' Response to ASLB 800327 Order Re Emergency Planning Hearing.Requests Reconsideration of ASLB Position on Previously Admitted Contention Re Emergency Planning.Related Correspondence Encl ML20062J3301980-04-18018 April 1980 Requests Response to Encl L Boyd Inquiry About Emergency Preparedness Around Facility ML19323G2211980-04-0808 April 1980 Expresses Concern Re on-job Intoxication of Facility Employees.Boston Herald American 800403 Article Encl ML19305C3711980-03-17017 March 1980 Responds to NRC Request Re Necessity of Antitrust Hearing Following Ma Municipals' Withdrawal of Petition to Intervene.Antitrust Hearing Unnecessary Re Instant Application ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19296D2931980-02-25025 February 1980 Forwards Endorsement 38 to Maelu Policy MF-58 ML19294B9081980-02-14014 February 1980 Corrects Typographical Errors & Omissions in Applicant 800209 Statement Filed in Response to ASLB Request Re Emergency Planning as Proper Issue in Hearings ML19260D6061980-02-0505 February 1980 Forwards Endorsements 50 & 51 to Nelia Policy NF-188 ML19257A7031980-01-0202 January 1980 Forwards 780209 Ltr to NRC Re J & s Pires & R & D Fitts Notice of Claims Against Util.Both Claimants Have Filed Suit ML19270H8001979-12-27027 December 1979 Forwards Design Review & Supplemental Recommendations Re Exposed Steel protection,self-contained Breathing Apparatus, Generation Seals,Fire Detector Testing,Cable Combustibility & Dc Power Sys Hazard Analysis ML19256F4471979-11-20020 November 1979 Notifies That 791119 Meeting W/Ma Wildlife Federation & NRC Will Be Rescheduled Either 791123 or Filing Date for Ma Wildlife Federation Pleadings Moved to 791130 1994-12-13 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML20042B7141982-03-19019 March 1982
[Table view]Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML20030B8861981-08-18018 August 1981 Requests to Be Excused from Participation in Oral Argument Scheduled for 810901.Issues Have Been Joined & Briefed & Oral Argument Is Not Essential.Request Partially Due to Budgetary Restraints ML20009B3301981-07-10010 July 1981 Requests That NRC Notify N Reynolds That 810622 Petition for Extension of Deadline for Compliance w/CLI-80-21 Has Been Retitled.Svc Should Be Made of All Subsequent Papers on Parties to Proceeding,Including Ucs ML20030D6581981-06-29029 June 1981 Advises That Toledo Edison Co & IA Electric Light & Power Co Should Be Included as Petitioners in Licensee 810622 Petition Requesting Commission Extension of Deadline Imposed by CLI-80-21 ML19347E9231981-05-11011 May 1981 Forwards Endorsements 45 & 46 to Maelu Policy MF-58 ML19347D8511981-03-31031 March 1981 Forwards Endorsements 5 & 6 to Nelia Binder EB-31, Endorsement 5 to Maelu Binder XB-31,Endorsement 44 to Maelu Policy MF-58 & Endorsement 58 to Nelia Policy NF-188 ML19341C9131981-02-23023 February 1981 Requests Svc of Documents Upon Util Be Made to Tg Dignan Instead of Gh Lewald.Address Unchanged ML19323F3761980-05-0101 May 1980 Submits Applicants' Response to ASLB 800327 Order Re Emergency Planning Hearing.Requests Reconsideration of ASLB Position on Previously Admitted Contention Re Emergency Planning.Related Correspondence Encl ML19294B9081980-02-14014 February 1980 Corrects Typographical Errors & Omissions in Applicant 800209 Statement Filed in Response to ASLB Request Re Emergency Planning as Proper Issue in Hearings ML19257A7031980-01-0202 January 1980 Forwards 780209 Ltr to NRC Re J & s Pires & R & D Fitts Notice of Claims Against Util.Both Claimants Have Filed Suit ML19256F2971979-11-12012 November 1979 Informs of Minor Change in Schedule for Requests for Findings of Fact & Conclusions of Law.Possibility Exists of Stipulation Between Nrc,Intervenor Ma Wildlife Federation & Applicant ML19210D7701979-11-0101 November 1979 Forwards Util & Bank Consortium 790731 Credit & Loan agreement,791012 Amend 1,State of Ma Dept of Public Util Orders Re Agreement & Util Affidavit ML19260A2871979-10-23023 October 1979 Advises That Intervenors Cleeton Support & Join Commonwealth of Ma Memorandum Opposing Dismissal of Emergency Planning Contentions ML19208C5101979-07-30030 July 1979 Advises of Receipt of Commonwealth of Ma Motion to Defer Forthcoming Evidentiary Hearings on Emergency Planning & Class 9 Accidents ML19208D0131979-07-23023 July 1979 Forwards Applicant Answers to Commonwealth of Ma Interrogatories Re Need for Power Issue.W/O Encl ML19242D5391979-07-0303 July 1979 Clarifies Withdrawal of 790518 Ltr.Withdrawal Not Intended ML19242B3751979-06-26026 June 1979 Forwards Util Objections & Motions for Protective Orders Re Certain Commonwealth of Ma Interrogatories Concerning Need for Power Issue.Certificate of Svc Encl ML19282C7991979-04-26026 April 1979 Forwards Complaints Re New Class Action Against Boston Edison Co,Et Al,Commenced by Plymouth County Nuclear Info Committee,Inc,Et Al.Summons,Order & Class Action Complaint Encl ML19284A4721979-01-25025 January 1979 Provides Comments on NRC 790116 Statement of Outstanding Issues in Proceeding Re Alternative Sites,Financial Qualification,Need for Power & NRC Reactor Safety Study ML19259A7411978-12-29029 December 1978 Refutes Position in 781208 Ltr of RM Butler (Boston Edison Co) That Site Analysis Should Not Be Recirculated Pursuant to NEPA ML20062D2181978-11-0303 November 1978 Believes That Alternative Sites Issue Is at Heart of Nuc Lic Process & That NEPA Mandates the Recirculation of Fes Suppl in This Case ML20062D9061978-11-0303 November 1978 Comments on 781012 Meeting Re Recirculating Final Environ Statement Suppl Relating to Alternate Sites.Intervenors Disagree with Facil Decision Not to Recirculate Fes ML20062C1231978-10-20020 October 1978 Forwards Memorandum Re Points & Authorities Relied Upon in Support of Position That Recirculation of Suppl Staff Site Analysis Not Legally Required Under NEPA ML20062D9261978-10-20020 October 1978 Forwards Memo Setting Forth Points & Auth Used to Support Position That Recirculation of Suppl Staff Site Analysis Is Not Req Under NEPA or NRC NEPA Reg ML19257A7051978-02-0909 February 1978 Notifies of Receipt of R Fitts & J Pires Notices of Claim Against Util.Claimants Allege Anxiety,Apprehension & Loss of Wages Due to Exposure 1982-03-19 |
Text
HENRY HERRMANN ATTORNEY AT LAW 50 CONGRESS STREET (1045)
BOSTON. MASSACHUEETTS C2109 (6178 423 6096
\\
i Aue 18, 1981
\\ {-11p r
\\
k(p[ Hj u C
s
<s Moore, Chairman 6'
. J,.. l [
Thomas S..
Buck 3
Dr. John II.
, O'II98I h I
Christine N. Kohl, Equire Atomic Safety and Licensing 8, E8 Naame }
Appeal Board
\\',
/-
U.S. Nuclear Regulatory CommissfQQ'f-
\\p cy, Washington, D.C.
20555
\\
en
/
r
~
b9
\\
Re:
Boston Edison Company et al.
^
(Pilgrim Nuclear Generating
((i c'U3 2 II9Bf y pli
.. /
Station, Unit 2)
- .g \\ :
Docket No. 50-471 f
\\'
L' Order dated August 10, 1981 To the Chairman and Members of the Atomic Safety and Licensing Appeal Board:
The Massachusetts Wildlife Federation ("MWF"), an Intervenor in the above-captioned proceeding, respectfully requests to be excused from participation in oral argument on appeal currently scheduled by the Board for September 1, 1981 (irrespective of any adjournments granted pursuant to Applicant's motion).
The'MWF has already extensively briefed the basis for its exceptions filed with this Board.
Neither the Applicant nor the Regulatory Staff have responded to the substantive arguments of the MWF's brief but have restricted themselves to merely alleging, in cursory fashion, that the MWF's exceptions constitute.an attack on a Commission' Regulation The MWF had already which is procedurally impermissible.
anticipated that position in its brief and had argued that
~
it is unsound.
Accordingly, unless the Board, in its dis'cretion, re-
~'
the MWF respectfully quires oral argument on this issue, submits that the issues have been joined and briefed and oral argument is not essential.
We further make this request
' I h-4 W
I 8109250102 810G10 PDR ADOCK 05000471
. ~ _
.3 O
-~
l Page 2 j
August 18, 1981 because of the budgetary restraints on the MWF and the j
fact that travel to Washington would pose a burden to MWF's counsel because of the effects of a back injury.
I Respectfully, LL numl HH/lpn Henry Her'mann
~
Attorney for the Massachusetts Wildlife Federation cc:
Service List I
i J
~
~
a-
.a.-
..