MONTHYEARNPL-99-0565, TS Change Request 201 to Licenses DPR-24 & DPR-27,revising Tech Specs 15.3.1.A.3,15.3.3..A & 15.3.3.C for Consistency1999-10-0505 October 1999 TS Change Request 201 to Licenses DPR-24 & DPR-27,revising Tech Specs 15.3.1.A.3,15.3.3..A & 15.3.3.C for Consistency NPL-99-0446, Application for Amends to Licenses DPR-24 & DPR-27,removing Word Plasma from TS 15.3.5 Re Discussion of Type of Display Monitor for sub-cooling Info in CR & Removing Discussion from TS 15.3.7 Re EDG Inoperability1999-08-0404 August 1999 Application for Amends to Licenses DPR-24 & DPR-27,removing Word Plasma from TS 15.3.5 Re Discussion of Type of Display Monitor for sub-cooling Info in CR & Removing Discussion from TS 15.3.7 Re EDG Inoperability NPL-99-0405, Suppl 2 to TS Change Request 211,transmitting Text That Will Be Relocated to Pbnp FSAR with Respect to Manager Supervisory Staff Requirements.Suppl Provided Based on Comments Fromqa Branch of NRC1999-07-15015 July 1999 Suppl 2 to TS Change Request 211,transmitting Text That Will Be Relocated to Pbnp FSAR with Respect to Manager Supervisory Staff Requirements.Suppl Provided Based on Comments Fromqa Branch of NRC NPL-99-0386, Application for Amends to Licenses DPR-24 & DPR-27, Respectively,Removing Ifba Enrichment Curve Methodology1999-07-0101 July 1999 Application for Amends to Licenses DPR-24 & DPR-27, Respectively,Removing Ifba Enrichment Curve Methodology NPL-99-0369, Application for Amends to Licenses DPR-24 & DPR-27 to Reflect Required Changes to TS as Result of Using Upgraded Fuel at plant.Non-proprietary,WCAP-14788 & Proprietary WCAP- WCAP-14787 Repts Encl.Proprietary Rept Withheld1999-06-22022 June 1999 Application for Amends to Licenses DPR-24 & DPR-27 to Reflect Required Changes to TS as Result of Using Upgraded Fuel at plant.Non-proprietary,WCAP-14788 & Proprietary WCAP- WCAP-14787 Repts Encl.Proprietary Rept Withheld NPL-99-0337, To TS Change Request 211,reflecting Administrative Changes in Sections 15.6 & 15.7 by Changing Titles,Increasing Min Operating Crew Shift Staffing & Deleting Duty & Call Superintendent Function1999-06-0909 June 1999 To TS Change Request 211,reflecting Administrative Changes in Sections 15.6 & 15.7 by Changing Titles,Increasing Min Operating Crew Shift Staffing & Deleting Duty & Call Superintendent Function NPL-99-0206, TS Change Request 212 to Licenses DPR-24 & DPR-27,updating References in TS to Reflect Relocation of Referenced Info in UFSAR1999-04-12012 April 1999 TS Change Request 212 to Licenses DPR-24 & DPR-27,updating References in TS to Reflect Relocation of Referenced Info in UFSAR NPL-99-0057, Application for Amends to Licenses DPR-24 & DPR-27,revising TS 15.6 & 15.7 to Reflect Proposed Administrative Control Changes1999-01-29029 January 1999 Application for Amends to Licenses DPR-24 & DPR-27,revising TS 15.6 & 15.7 to Reflect Proposed Administrative Control Changes NPL-98-0766, Application for Amends to Licenses DPR-24 & DPR-27,revising TS to Ensure 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility1998-10-0707 October 1998 Application for Amends to Licenses DPR-24 & DPR-27,revising TS to Ensure 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility NPL-98-0586, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Section 15.4.1 by Removing Requirement to Check Environ Monitors on Monthly Basis1998-10-0505 October 1998 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Section 15.4.1 by Removing Requirement to Check Environ Monitors on Monthly Basis NPL-98-0768, Application for Amends to Licenses DPR-24 & DPR-27,adding Notation Definition Contained in TS Table 15.4.1-1, Min Frequencies for Checks,Calibrations & Tests of Instrument Channels, Per NUREG-14311998-09-28028 September 1998 Application for Amends to Licenses DPR-24 & DPR-27,adding Notation Definition Contained in TS Table 15.4.1-1, Min Frequencies for Checks,Calibrations & Tests of Instrument Channels, Per NUREG-1431 NPL-98-0759, Tech Spec Change Request 209,amending Licenses DPR-24 & DPR-27,removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers)1998-09-23023 September 1998 Tech Spec Change Request 209,amending Licenses DPR-24 & DPR-27,removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) L-98-613, Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability1998-07-30030 July 1998 Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability NPL-98-0613, Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability1998-07-30030 July 1998 Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability NPL-98-0431, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl1998-05-28028 May 1998 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl L-98-431, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl1998-05-28028 May 1998 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl NPL-98-0303, TS Change 205 to License DPR-27,revising Schedule for Implementing Boron Concentration Changes Related to Planned Conversion of Unit 2 to 18-month Fuel Cycles1998-05-15015 May 1998 TS Change 205 to License DPR-27,revising Schedule for Implementing Boron Concentration Changes Related to Planned Conversion of Unit 2 to 18-month Fuel Cycles NPL-98-0146, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Sections 15.3.6, Containment Sys Bases, 15.3.12, CR Emergency Filtration Including bases,15.4.4, Containment Tests bases,15.4.11, CR Emergency...1998-02-26026 February 1998 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Sections 15.3.6, Containment Sys Bases, 15.3.12, CR Emergency Filtration Including bases,15.4.4, Containment Tests bases,15.4.11, CR Emergency... NPL-97-0484, TS Change Request 199,consisting of Application for Amends to Licenses DPR-24 & DPR-27,removing Requirement in TS to Perform Containment Integrated Leak Rate 60-months from Previous Test1997-08-14014 August 1997 TS Change Request 199,consisting of Application for Amends to Licenses DPR-24 & DPR-27,removing Requirement in TS to Perform Containment Integrated Leak Rate 60-months from Previous Test NPL-97-0315, Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 11997-06-0303 June 1997 Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 NPL-97-0249, Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 11997-05-0909 May 1997 Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 NPL-97-0167, Application for Amends to Licenses DPR-24 & DPR-27, Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP1997-04-14014 April 1997 Application for Amends to Licenses DPR-24 & DPR-27, Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP NPL-97-0166, Application for Amends to Licenses DPR-24 & DPR-27,changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President-Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c1997-04-14014 April 1997 Application for Amends to Licenses DPR-24 & DPR-27,changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President-Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c L-97-005, Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray, to Incorporate Outage Times Similar to NUREG-1431,Rev 11997-02-13013 February 1997 Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray, to Incorporate Outage Times Similar to NUREG-1431,Rev 1 ML20134L9621997-02-12012 February 1997 TS Change Request 196 to Licenses DPR-24 & DPR-27, Respectively,Relocating Turbine Overspeed Protection Surveillances,Limiting Conditions for Operation (Lcos),Per NRC GL 95-10 ML20134A3581997-01-24024 January 1997 Application for Amends to Licenses DPR-24 & DPR-27, Requesting Storage of Fuel Assemblies of Higher Enrichment than Currently Authorized ML20134A3061997-01-21021 January 1997 Application for Amends to Licenses DPR-24 & DPR-27, Requesting to Update References to 10CFR20 in TS Section 15.6.11, Radiation Protection Program ML20133N3961997-01-16016 January 1997 Application for Amends to Licenses DPR-24 & DPR-27, Requesting Boron Concentration Changes to Support 18-month Fuel Cycles ML20132C3631996-12-12012 December 1996 Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Auxiliary Cooling Sys,Air Recirculation Fan Coolers & Containment Spray, Per NUREG-1431,Rev 1 ML20129F1591996-09-30030 September 1996 Application for Amends to Licenses DPR-24 & DPR-27 for Plant,Units 1 & 2 to Modify TS Section 15.3.3, ECCS, Auxiliary Cooling Sys,Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT ML20129C0651996-09-19019 September 1996 Application for Amends to Licenses DPR-24 & DPR-27,revising Seection 15.3.15, Overpressure Mitigating Sys & Section 15.3.1, Rcs. Calculation 96-0182,Rev 1 Which Determined Acceptable LTOP Setpoint for Plant,Encl ML20117D2571996-08-22022 August 1996 TS Change Request 190 to Licenses DPR-24 & DPR-27,reflecting Licensed Power Level for Plant ML20116N1311996-08-15015 August 1996 Application for Amends to Licenses DPR-24 & DPR-27, Supplementing TS Change Request 170,modifying TS 15.3.10, Control Rod & Power Distribution Limits & TS 15.4.1 Operational Safety Review ML20112F7291996-06-0404 June 1996 TS Change Request 188 to Licenses DPR-24 & DPR-27,modifying TS 15.2.3, Limiting Safety Sys Settings & Protective Instrumentation & 15.5.3, Design Features - Reactor ML20117K1831996-06-0404 June 1996 TS Change Request 189 to Licenses DPR-24 & DPR-27,modifying TS to Maintain Safety Margin for Unit 2 W/Replacement Sgs. Util Scheduled to Replace SGs in Unit 2 During Fall 1996 Refueling Outage ML20112E2191996-05-29029 May 1996 Application for Amends to Licenses DPR-24 & DPR-27,revising Section 15.4.4,Containment Tests,Section 15.1, Definitions, 15.3.6, Containment System, & 15.6, Administrative Controls ML20108D1461996-04-29029 April 1996 TS Change Request 173 to Application for Amends to Licenses DPR-24 & DPR-27,respectively,removing Fire Protection Requirements from TSs & Incorporating Requirements Into Fire Protection Evaluation Rept,Per GL 88-12 ML20107N1951996-04-24024 April 1996 Application for Amends to Licenses DPR-24 & DPR-27,removing Items Identified in GLs 89-01 & 95-10 as Being Procedural Details from Pbnp Rets,Section 15.7 & Relocating to Appropriate Documents ML20100L3791996-02-27027 February 1996 Application for Amends to Licenses DPR-24 & DPR-27, Respectively,Consisting of TS Change 186,modifying TS Section 15.4.4, Containment Tests, Spec I.C.1 to State That Type a Tests Be Conducted Per 10CFR50,App J ML20097D6691996-02-0808 February 1996 Application for Amends to Licenses DPR-24 & DPR-27, Consisting of TS Change Request 170,modifying TS 15.3.10, Control Rod & Power Distribution Limits & TS 15.4.1, Operational Safety Review ML20095F7521995-12-13013 December 1995 Application for Amends to Licenses DPR-24 & DPR-27, Consisting of TS Change Request 185 Revising TS to Implement COLR in Accordance W/Gl 88-16, Removal of Cycle-Specific Parameter Limits... & WCAP-14483, ...Expanded Colr ML20094R5061995-11-29029 November 1995 Application for Amends to Licenses DPR-24 & DPR-27 Consisting of Suppl to Change Request 180,modifying 4.16 Kv Degraded voltage,4.16 Kv Loss of Voltage & 480 V Loss of Voltage Protection Functions Setting Limits ML20094M9721995-11-17017 November 1995 Application for Amends to Licenses DPR-24 & DPR-27,revising Health Physics Manager Qualifications ML20094H4811995-11-0909 November 1995 TS Change Request 184 to Licenses DPR-24 & DPR-27,modifying TS Section 15.4.2, ISI & Testing of Safety Class Components, to Incorporate F* SG Tube Repair Criterion. Proprietary B&W Rept Encl.Proprietary B&W Rept Withheld ML20094D3041995-10-23023 October 1995 Application for Amends to Licenses DPR-24 & DPR-27,changing Licensee Name to Wisconsin Energy Co (Wec),In Support of Pending Merger Between NSP & WEC ML20093K1091995-10-19019 October 1995 Application for Amend to Licenses DPR-24 & DPR-27,revising Modified TS 15.3.1.G, Operational Limitation, Spec 3.b,to Reduce RCS Raw Measured Total Flow Rate Limit by 4000 Gpm for Unit 2 ML20092H0071995-09-13013 September 1995 Application for Amend to Licenses DPR-24 & DPR-27, Consisting of TS Change Request 181,revising TS Section 15.3.1.G.3 Re RCS Raw Measured Total Flow Rate.W/O TS ML20085N6961995-06-23023 June 1995 Application for Amend to Licenses DPR-24 & DPR-27,consisting of Change Request 164,modifying TS 15.3.0, General Considerations, to Incorporate Requirements Similar to NUREG-1431 ML20083B0051995-05-0202 May 1995 Application for Amends to Licenses DPR-24 & DPR-27, Consisting of TS Change Request 172,modifying TS Section 15.4.1, Operational Safety Review ML20082R8761995-04-27027 April 1995 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Section 15.3.5, Instrumentation Sys 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARNPL-99-0565, TS Change Request 201 to Licenses DPR-24 & DPR-27,revising Tech Specs 15.3.1.A.3,15.3.3..A & 15.3.3.C for Consistency1999-10-0505 October 1999 TS Change Request 201 to Licenses DPR-24 & DPR-27,revising Tech Specs 15.3.1.A.3,15.3.3..A & 15.3.3.C for Consistency ML20211A7561999-08-11011 August 1999 Amends 190 & 195 to Licenses DPR-24 & DPR-27,respectively, Revising Sections 15.6 & 15.7 of Pbnp,Units 1 & 2.Rev Reflects Personnel Title Changes,Increases Min Operating Crew Shift Staffing & Rev to Procedure Review NPL-99-0446, Application for Amends to Licenses DPR-24 & DPR-27,removing Word Plasma from TS 15.3.5 Re Discussion of Type of Display Monitor for sub-cooling Info in CR & Removing Discussion from TS 15.3.7 Re EDG Inoperability1999-08-0404 August 1999 Application for Amends to Licenses DPR-24 & DPR-27,removing Word Plasma from TS 15.3.5 Re Discussion of Type of Display Monitor for sub-cooling Info in CR & Removing Discussion from TS 15.3.7 Re EDG Inoperability NPL-99-0405, Suppl 2 to TS Change Request 211,transmitting Text That Will Be Relocated to Pbnp FSAR with Respect to Manager Supervisory Staff Requirements.Suppl Provided Based on Comments Fromqa Branch of NRC1999-07-15015 July 1999 Suppl 2 to TS Change Request 211,transmitting Text That Will Be Relocated to Pbnp FSAR with Respect to Manager Supervisory Staff Requirements.Suppl Provided Based on Comments Fromqa Branch of NRC NPL-99-0386, Application for Amends to Licenses DPR-24 & DPR-27, Respectively,Removing Ifba Enrichment Curve Methodology1999-07-0101 July 1999 Application for Amends to Licenses DPR-24 & DPR-27, Respectively,Removing Ifba Enrichment Curve Methodology NPL-99-0369, Application for Amends to Licenses DPR-24 & DPR-27 to Reflect Required Changes to TS as Result of Using Upgraded Fuel at plant.Non-proprietary,WCAP-14788 & Proprietary WCAP- WCAP-14787 Repts Encl.Proprietary Rept Withheld1999-06-22022 June 1999 Application for Amends to Licenses DPR-24 & DPR-27 to Reflect Required Changes to TS as Result of Using Upgraded Fuel at plant.Non-proprietary,WCAP-14788 & Proprietary WCAP- WCAP-14787 Repts Encl.Proprietary Rept Withheld NPL-99-0337, To TS Change Request 211,reflecting Administrative Changes in Sections 15.6 & 15.7 by Changing Titles,Increasing Min Operating Crew Shift Staffing & Deleting Duty & Call Superintendent Function1999-06-0909 June 1999 To TS Change Request 211,reflecting Administrative Changes in Sections 15.6 & 15.7 by Changing Titles,Increasing Min Operating Crew Shift Staffing & Deleting Duty & Call Superintendent Function ML20206A4951999-04-23023 April 1999 Amends 189 & 194 to Licenses DPR-24 & DPR-27,respectively, Change TS to Provide Specific Numerical Setpoint Limits for Rt,Rcp Trip & Auxiliary Feedwater Initiation on Loss of Power to 4 Kv Buses NPL-99-0206, TS Change Request 212 to Licenses DPR-24 & DPR-27,updating References in TS to Reflect Relocation of Referenced Info in UFSAR1999-04-12012 April 1999 TS Change Request 212 to Licenses DPR-24 & DPR-27,updating References in TS to Reflect Relocation of Referenced Info in UFSAR ML20207L3351999-03-0202 March 1999 Amends 187 & 192 to Licenses DPR-24 & DPR-27,respectively, Modifying TS 15.4.1, Operational Safety Review, by Removing Requirement to Check Environ Monitors on Monthly Basis ML20207D5621999-03-0101 March 1999 Amends 186 & 191 to Licenses DPR-24 & DPR-27,respectively,to Clarify Notation Definition of Refueling Interval, R, in TS Table 15.4.1-1, Minimum Frequencies for Checks, Calibrations & Tests of Instrument Channels NPL-99-0057, Application for Amends to Licenses DPR-24 & DPR-27,revising TS 15.6 & 15.7 to Reflect Proposed Administrative Control Changes1999-01-29029 January 1999 Application for Amends to Licenses DPR-24 & DPR-27,revising TS 15.6 & 15.7 to Reflect Proposed Administrative Control Changes NPL-98-0766, Application for Amends to Licenses DPR-24 & DPR-27,revising TS to Ensure 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility1998-10-0707 October 1998 Application for Amends to Licenses DPR-24 & DPR-27,revising TS to Ensure 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility NPL-98-0586, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Section 15.4.1 by Removing Requirement to Check Environ Monitors on Monthly Basis1998-10-0505 October 1998 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Section 15.4.1 by Removing Requirement to Check Environ Monitors on Monthly Basis NPL-98-0768, Application for Amends to Licenses DPR-24 & DPR-27,adding Notation Definition Contained in TS Table 15.4.1-1, Min Frequencies for Checks,Calibrations & Tests of Instrument Channels, Per NUREG-14311998-09-28028 September 1998 Application for Amends to Licenses DPR-24 & DPR-27,adding Notation Definition Contained in TS Table 15.4.1-1, Min Frequencies for Checks,Calibrations & Tests of Instrument Channels, Per NUREG-1431 NPL-98-0759, Tech Spec Change Request 209,amending Licenses DPR-24 & DPR-27,removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers)1998-09-23023 September 1998 Tech Spec Change Request 209,amending Licenses DPR-24 & DPR-27,removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) NPL-98-0613, Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability1998-07-30030 July 1998 Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability L-98-613, Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability1998-07-30030 July 1998 Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability ML20236U7171998-07-21021 July 1998 Amend 190 to License DPR-27,revising Schedule for Implementing Boron Concentration Changes from Refueling Outage 24 to Refueling Outage 23 for Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20236T1731998-07-17017 July 1998 Amends 185 & 189 to Licenses DPR-24 & DPR-27,respectively, Revising TS Table 15.4.1-1, Min Frequencies for Checks, Calibrs & Tests of Instrument Channels, to Change Test Frequency of Containment Hrrm,Revise Note 7 & Item 36 ML20236S0111998-07-13013 July 1998 Amends 184 & 188 to Licenses DPR-24 & DPR-27,respectively, Revising TS Section 15.7, RETS, Sections 15.7.3,15.3.4 & 15.7 of RETS Were Moved to licensee-controlled Documents Consistent W/Gl 89-01 L-98-431, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl1998-05-28028 May 1998 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl NPL-98-0431, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl1998-05-28028 May 1998 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl NPL-98-0303, TS Change 205 to License DPR-27,revising Schedule for Implementing Boron Concentration Changes Related to Planned Conversion of Unit 2 to 18-month Fuel Cycles1998-05-15015 May 1998 TS Change 205 to License DPR-27,revising Schedule for Implementing Boron Concentration Changes Related to Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20217K4511998-03-24024 March 1998 Amends 183 & 187 to Licenses DPR-24 & DPR-27,respectively, Allowing Health Physicist to Fulfill TS Requirements Previously Specified for Health Physics Manager ML20248L8611998-03-17017 March 1998 Amends 182 & 186 to Licenses DPR-24 & DPR-27,respectively, Revising Section 15.6.11, Radiation Protection Program, Ref to 10CFR20 NPL-98-0146, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Sections 15.3.6, Containment Sys Bases, 15.3.12, CR Emergency Filtration Including bases,15.4.4, Containment Tests bases,15.4.11, CR Emergency...1998-02-26026 February 1998 Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Sections 15.3.6, Containment Sys Bases, 15.3.12, CR Emergency Filtration Including bases,15.4.4, Containment Tests bases,15.4.11, CR Emergency... ML20198T0731997-09-29029 September 1997 Corrected TSs Pages 15.4.2-5 & 15.6.12-1 to Amends 181 & 185,respectively.Amends Issued W/Typographical Error on Pages ML20217D6951997-09-29029 September 1997 Amends 181 & 185 to Licenses DPR-24 & DPR-27,respectively, Changes TSs Re Containment Integrated Leak Rate Testing ML20236R9451997-09-23023 September 1997 Amends 180 & 184 to Licenses DPR-24 & DPR-27,respectively, Changing Amounts of Boric Acid in Refueling Water Storage Tanks,Boric Acid Storage Tanks & Safety Injection Accumulators & Increase Lowest Permissible Concentration ML20210S9641997-09-0404 September 1997 Amends 179 & 183 to Licenses DPR-24 & DPR-27,respectively,to Revise TS 15.5.4, Fuel Storage, to Increase Fuel Assembly Enrichment Limits to 5.0 Weight Percent ML20216G5511997-09-0303 September 1997 Amends 178 & 182 to Licenses DPR-24 & DPR-27,respectively, Revising TS 15.3.1, Reactor Coolant Sys, to Eliminate Provisions for at Power Operation W/Single Reactor Coolant Pump ML20210P9981997-08-25025 August 1997 Amends 177 & 181 to Licenses DPR-24 & DPR-27,respectively, Revising TS Sections 15.6.2, Organization, TS 15.6.5.1, Managers Supervisory Staff, TS 15.6.6, Reportable Event Action & TS 15.6.7 NPL-97-0484, TS Change Request 199,consisting of Application for Amends to Licenses DPR-24 & DPR-27,removing Requirement in TS to Perform Containment Integrated Leak Rate 60-months from Previous Test1997-08-14014 August 1997 TS Change Request 199,consisting of Application for Amends to Licenses DPR-24 & DPR-27,removing Requirement in TS to Perform Containment Integrated Leak Rate 60-months from Previous Test ML20217H4171997-08-0606 August 1997 Amends 175 & 179 to Licenses DPR-24 & DPR-27,respectively, Revising Section 3.A of Facility OL from Licensed Power Level of 1,518 MW Thermal to 1,518.5 MW Thermal ML20198F0191997-08-0606 August 1997 Amends 176 & 180 to Licenses DPR-24 & DPR-27,respectively, Relocating Turbine Overspeed Protection Specs,Limiting Conditions for Operation,Srs & Associated Bases from TS Section 15.3.4 to FSAR ML20148U4631997-07-0101 July 1997 Amends 173 & 177 to Licenses DPR-24 & DPR-27,respectively, Revising Listed TSs & Definitions for Both Units to Incorporate Listed Changes to Facility Into TS & FSAR NPL-97-0315, Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 11997-06-0303 June 1997 Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 NPL-97-0249, Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 11997-05-0909 May 1997 Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 NPL-97-0167, Application for Amends to Licenses DPR-24 & DPR-27, Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP1997-04-14014 April 1997 Application for Amends to Licenses DPR-24 & DPR-27, Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP NPL-97-0166, Application for Amends to Licenses DPR-24 & DPR-27,changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President-Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c1997-04-14014 April 1997 Application for Amends to Licenses DPR-24 & DPR-27,changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President-Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20138M0481997-02-20020 February 1997 Amends 172 & 176 to Licenses DPR-24 & DPR-27,respectively, Revising RCS Temp Below Which LTOP Sys & Pressurizer PORVs Shall Be Operable,Modify Requirement to Limit Operation of High Pressure Injection Pump from RCS Cold Leg Temp L-97-005, Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray, to Incorporate Outage Times Similar to NUREG-1431,Rev 11997-02-13013 February 1997 Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray, to Incorporate Outage Times Similar to NUREG-1431,Rev 1 ML20134L9621997-02-12012 February 1997 TS Change Request 196 to Licenses DPR-24 & DPR-27, Respectively,Relocating Turbine Overspeed Protection Surveillances,Limiting Conditions for Operation (Lcos),Per NRC GL 95-10 ML20134H0231997-02-0505 February 1997 Corrected Tech Spec Pages to Amends 171 & 175 to Licenses DPR-24 & DPR-27.TS Page 4 of 5 Issued with Part of Text Illegible & Page 5 of 5 Inadvertently Omitted ML20134A3581997-01-24024 January 1997 Application for Amends to Licenses DPR-24 & DPR-27, Requesting Storage of Fuel Assemblies of Higher Enrichment than Currently Authorized ML20134A1111997-01-23023 January 1997 Corrected TS Pages for Amends 171 & 175 to Licenses DPR-24 & DPR-27,respectively ML20134A3061997-01-21021 January 1997 Application for Amends to Licenses DPR-24 & DPR-27, Requesting to Update References to 10CFR20 in TS Section 15.6.11, Radiation Protection Program ML20133N3961997-01-16016 January 1997 Application for Amends to Licenses DPR-24 & DPR-27, Requesting Boron Concentration Changes to Support 18-month Fuel Cycles ML20133N4231997-01-16016 January 1997 Amends 171 & 175 to Licenses DPR-24 & DPR-27,respectively, Revising TS Section 15.3.10, Control Rod & Power Distribution Limits 1999-08-04
[Table view] |
Text
T
}wll '
d?.'
Y Wsconson v
gy,ggge POWER COMPANY 231 W Mcho:n PO in 2046. Mh0Jkee, WI $3201
@id) 221-234$
VPNPD 397 10 CFR 50.59 NRC-90-92 10 CFR 50.90 l
September 7, 1990 l
)
U.
S. NUCLEAR. REGULATORY COMMISSION Document Control Desk i
Mail Station P1-137
[
Washington, D. C.
20555 l
l l
l Gentlement j
h
. DOCKETS 50-266 AND 50-301 TECHNICAL SPECIFICATION CHANGE REOUEST 142 BATTERY SERVICE AND PERFORMANCE TESTING REOUIREMENTS POINT 3.EACH NUCLEAR PLANT. UNITS 1 AND 2 In accordance with the requirements of 10 CFR 50.59(c)"and i
10 CFR 50.90, Wisconsin Electric Power Company (Licensee) i requests amendments to Facility Operating Licenses DPR-24 and DPR-27 for Point Beach Nuclear Plant, Units 1 and 2 respectively.
l The amendments request proposes changes to Technical Speci-_
I fication (TS) 15.4.6, " Emergency Power System' Periodic Tests",
Section B,
" Station Batteries", which will define and establish ~
.i periodic service and performance testing requirements for safety-related station batteries.
Changes to the. corresponding bases for these specifications are also proposed.
Technical Specifi-catica pages with the proposed changes identified by margin-bars in the right-hand margin are attached.
On June 2, 1989, an Enforcement Conference was held between.the Licensee and members of the NRC staff at the NRC Region III headquarters in Glen Ellyn, Illinois.. The conference was talled.
to discuss apparent violations identified in NRC' Inspection Reports 50-266/89016 and 50-301/89015, as transmitted.by letter dated May 31, 1989.
One of the najor issues discussed in this meeting was battery testing and what constitutes an. effective 1
testing program.
A letter dated July 21, 1989 transmitted the findings of the NRC staff in regard to the apparent violations discussed at the con-ference and also forwarded a Notice of Violation for a Severity-Level IV non-contormance regarding battery testing.
This letter 9009120080 900907 ADOCK0500ggg6 DR s!
p//
A suh@s7of Hiwrmer ExpOvjwatAm
Document Control Desk i
September 7, 1990 Page 2 also requested that the Licensee describe what it believes to be a satisfactory battery testing program and its justification for this position.
We responded to this request in a letter dated September 29, 1989.
In our letter we indicated that, upon the NRC staff's review and concurrence with the battery testing program proposed in the attachment to the letter, we would submit a license amendment change application to incorporate the program into the Point Beach Technical Specifications.
The staff reviewed our program and responded with a letter dated May 16, 1990, offering general concurrence.
It was, however, the position of the staff that battery service testina should be per-formed in addition to battery performance discharae tests and that this service testing should be conducted at intervalr, not to exceed eighteen months.
This position is consistent with Regulatoy Guide (RG) 1.129, " Maintenance, Testing, and. Replace-ment of Large Lead Storage Batteries for Nuclear Pcwer Plants."
Wisconsin Electric, in its September 29, 1989 letter, had proposed a program involving only performance discharge tests on the basis that the performance test envelopes the worst case duty cycle (which the service test mimics) completely for batteries D105 and D106 and almost completely (except for the first minute of the sixty-minute test) for batteries DOS and D06.
In response to the NRC letter, Wisconsin Electric hereby proposes changes to the Technical Specifications to establish a battery testing program, including both service testing and performance l
testing, consistent with RG 1.129 and IEEE Standard 450-1987, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries."
The proposed specifications regarding the tests are also consistent with I
NUREG-0452, Revision 4,
" Standard Technical Specifications for Westinghouse Pressurized Water Reactors" (STS).
These proposed changes may be described as follows:
1.
TS 15.4.6, " Emergency Power System Periodic Tests",
specifies periodic surveillance requirements for both diesel generators and batteries.
One of the proposed changes i
retitles Section B as " Safety-Related Station Batteries" vice the present, more generic " Station Batteries".
An identical change is proposed in the text to TS 15.4.6.B.1.
This change is essentially a consideration for the future configuration of the station batteries because, at present, all four station batteries, DOS, D06, D105, and D106, are safety related.
However, as mentioned in our September 29, 1989 letter and.in our recent response to the electrical I
i l
Document Control Desk September 7, 1990 l
Page 3 distribution system functional inspection dated August 3, j
1990, it is our intention to install a new non-safety-related station battery for the purpose of powering several i
large non-safety-related loads presently carried by the station batteries, thus relieving the safety-related
)
batteries of significant loading.
We anticipate installa-tion by the end of 1992.
The proposed title change will l
specifically delineate the surveillances as applicable to the safety-related station batteries only.
2.
The present TS 15.4.6.B.4 describes the performance testing requirements for the station batteries.
We are proposing that this TS be replaced by a new TS 15.4.6.B.4 which defines a more restrictive, more definitive, and conserva-tive testing program consistent with the NRC response to our program submittal.
a.
The new TS 15.4.6.B.4.a defines the eighteen-month required service test, and the wording presented essentially duplicates the STS except for the require-ment that the test be conducted during shutdown.
We believe this rastriction is unnecessary for a battery whose loads are not unit-specific.
At Point Beach, all four safety-related batteries carry loads which are common to both units.
The stipulation that the battery l
test be conducted while shut down would direct, for Point Beach Nuclear Plant, that both units be shut down to conduct a battery test.
It is our intention to install, by the end of 1992, a
fully qualified, seismically. mounted " swing" safety-related battery, capable of performing the safety-related functions of any of the four present station batteries.
(The battery, presently designated spare battery D205, is on site and was utilized during the replacement of DOS and D06 in 1989.)
With the full installation of this battery as a swing component, any of the station batteries may be taken.off line for testing, regardless of the reactor condition.
- Thus, the battery service test need not take place only during shutdown.
b.
The proposed new TS 15.4.6.B.4.b defines the 60-month required performance test which serves to measure battery capacity and, thus, indi
<Ee long-term degradation due to aging effect; our proposed specification is virtually ident.ieal to the STS with two exceptions-
Document Control' Desk L
September 7, 1990 l
Page 4 1)
As with the service test, we are taking exception to the requirement that the test be conducted i
while shut down, for the same reasons discussed above.
2)-
~ We have revised the definition of degradation to; l
be consistent with IEEE Standard 450-1987.-
j i
This standard uses the " previous performance. test" as l,
the basis from which degradation is measured vice the
- average on previous performanceitests" used-in the' STS.
A review of earlier revisions of the IEEE I
t Standard revealed that the.* average on-previous-j performance tests" concept was previously specified by the standard, but was changed with the 1987-revision.
l 1
3.
We have added a footnote to 15.4.6.4.a and b'which speci-
- g fies that service and performance testing will begin subsequent to installation of the swing safety-related.
l battery.
TS 15.3.7.B.1.f-and g provide Limiting conditions
{
for operation (LCO's) for batteries 005/D06 and D105/D106, respectively, and define an allowable porlod of inopera-bility for D05/D06 as 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,-and D105/D106 as 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
If these batteries remained inoperable beyond.this time period, per TS 15.3.0.A, any affected unit would be required to be placed in hot shutdown within 3_ hours.
Under the present TS 15.4.6.B.4, the load test _specified to be completed on a 5-year periodicity could be completed within the 24-hour window;for batteries DOS and D06.
The' test.
verifies that the major;1oads, as listed in FSAR Table 8.2-3'
(" Major Battery Loads Following Loss of Outside Power") can be supplied by tho' battery for: the. time period specified.
This test was conducted with the battery on line supplying
~
the actual loads.
No disconnection of the-battery was necessary, our revised testing program, as specified by the proposed l
new TS 15.4.6.B.4, will subject the batteries to a more conservative and demanding loading cycle.
This more extensive testing program will involve manual disconnection of the battery and reconnection of.the battery to a resistor bank.
Following testing and subsequent recharging of the' battery, manual reconnection of the battery to its busiwill complete the evolution.
Based on our_ experience with testing of batteries D105 and D106 in 1989 (72-hour i
.inoperability Lco's), we know that testing of this nature cannot be completed within the allowable 24-hour LCO l
zJ
?
e i
Document control Desk September 7, 1990 page 5 currently specified for batteries DOS and D06.
The additional time required for battery disconnection and reconnection, as well as the auditional time required to recover and recharge the battery, preclude these tests from l
being completed in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
As previously discussed, we expect to complete installation of a swing safety-related battery by the end of 1992.
The installation of this battery will allow replacing any.of the four safety-related batteries (DOS, D06, D105, D106) and thus permit testing off-line without affecting plant operation and without the time limitation of the existing LCO's.
Accordingly, the new testing specifications must be qualified with the proposed footnote.
We intend to enter our proposed battery testing cycle, including the 18-month service tests, following installation of the swing safety-related battery.
This creates a period of three years in which no testing will take place for batteries D105 and D106 (these batteries were installed in 1984 and completed their 5-year required performance test in fall 1909) and three and one-half years for batteries DOS, D06, and D205, all of which were installed new in 1989.
We believe this testing delay is acceptable becaus6 of the relative newness of theue batteries whose design service life is 20 years and their satisfactory performance thus far.
These batteries are presently at their expected peak capacity.
Furthermore, and as mentioned above, the physical limitations imposed by testing under the present electrical system configuration preclude completion of testing within the 24-hour LCO specified for batteries DOS and D06, and crporience has shown that the 72-hour LCO for D105 and D106 is extremely limiting.
Thus a testing program cannot be initiated until Technical Specification changes are approved, and this approval is predicated on our installation of an additional, swing safety-related battery.
We will begin the new test cycle by testing all five safety-related batteries during the two refueling outages subsequent to the installation of the swing safety-related battery.
Although we are requesting a Technical Specification for battery testing t
which does not require a unit shutdown, we intend to do the initial testing during unit outages due to consideration for risk minimization following installation of the new safety-related swing battery and its supporting switchgear.
We believe it is 1
prudent to conduct the initial tests while one of the Point Beach units is shut down.
l l
l l
_a,m,
,m-,.
v
Document Control' Desk September 7, 1990 Page 6 We have evaluated the changes proposed in this amendment applica-tion in accordance with the requirements of 110 CFR 50.91(a) using the standards in 10 CFR 50.92 and hi e determined that the changes do not result in a significant hazards. consideration.
A proposed amendment does not result in a significant hazards consideration if operati7n of the facility in accordance with the proposed amendment does not (1) involve a significant increase in the probability or consequences or an accident previously evoluated, (2)-create the. possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety.
These proposed changes to TS 15.4.6.B irupose more stringent and more frequent test requirements for the batteries than present requirements.
Additionally, the tests are performed with the tested battery off line and replaced by a swing safety-related battery.
There can, therefore, be no effect'on previously evaluated accidents nor is any new accident created.
By the same reasoning, there is no significant reduction in the margin of safety.
In fact, the more stringent surveillance 1
requirements should result in an increase in margin of safety by providing better and more frequent assurances of operability.
l We note also that the addition of this specification is similar to an " example of amendments not likely to involve significant hazards considerations" set forth by.the staff at 51 FR 7751.
i Example 11 reads, "A change that constitutes an additional limitation, restriction, or control not presently included in the technical specifications, e.g.,
a more^ stringent surveillance requirement."
On a separate matter, Wisconsin Electric submitted' Technical Specification Change Request 132, "LCO's for Power Distribution on Safeguards Buses" to you on September 22, 1989.
It is our understanding through Mr. Warren swenson, our Project Manager prior to July 1, 1990, that the-staff has nearly completed their review of this change request.
Mr. Swenson further informed us
]
that one of the reviewers requested we consider removing the phrase "... including Black Plant startup..." from TS 15.3.7.A.2 which begins with the following sentence:.
"A.2 Under abnormal conditions, including Black Plant startup, one teactor may be made l
critical providing the following conditions are mat..."
The reviewer's concerns are that the term " Black Plant
)
the STS do not contain this term; and, to his knowledge, no other 1
plant has this phrase in its specifications, 1
l l
I I
s
J z..-
s'
" Document Control Desk
[
- September 7, 1990.
Page-7
- i We have considered this matter, and we concur'with the1 proposed deletion'of the words1* including Black Plant'startup" from-thh first sentence of TS 15.3.7.A.2..
We have attached-a revised TS-Page 15.3.7-2, which incorporates ~the change.
[
HWe have evaluated this proposed change in accordance with the standards specified:in 10 CFR 50.92 and have determined that this proposed 1 change involves no significant nazards considerations.
" Black Plant startup" itself is an abnormal-condition and, therefore, its removal does"nothinglto change the meaning or.
intent of the: specification.- This change is thus purely-administrative in nature and. represents,an example'of an amendment that is not likely to involveJa'significant. hazards.
consideration as-listed at. example i of 51.FR 7751.;
t Please contack us if you have any questions concerning this-request.
i
'Very.truly yours, 1
k C.
W. Fay Vice President Nuclear Power
..j L.
Copies to NRC Regional Administrator, Region III L
NRC Resident Inspector Subscribed and sworn to before me this 7tLday of xla,o P.
, 1990.
.A:7.Lestas Q. btc%+6v Notary Public, State of-Wisconsin L
My, commission expires 6-7-9A.