Concurs W/Revised Battery Testing Program for Plant. Bounding Battery Load Profile Should Be Included in Plant Sar,Replacing Current Table 8.2-3, Major Battery Loads Following Loss of Outside Power
ML20043A523
Person / Time
Site: Point Beach  
Issue date: 05/16/1990
From: Swenson W
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9005220190
Download: ML20043A523 (3)


Text

/

May 16,.1990 i

N

-Docket Nos.'50-266 DISTRIBUTION:

.and 50-301 (pocket-M ies: NRC & Local PDRs PDIII-3 r/f-JZwolinski Mr. C. W. _ Fay, Vice President JHannon LDaniels i

Nuclear Power Department WSwenson PKreutzer

/

Wisconsin Electric Power Company OGC-WF1 EJordan 231 W. Michigan Street, Room 308 PDIII-3 Gray ACRS(10)

. Milwaukee, Wisconsin 53201 SSaba i

Dear.Mr. Fay:

SUBJECT:

REVISED BATTERY TESTING PROGRAM POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

'The staff has reviewed the revised battery testing program as described in.

.your letter dated September 29 1989.

In general, we concur with this battery testing program. However,itlsthepositionoftheNRCasspecifiedinRegula-t tory Guide (RG)'1.129.that conformance with the requirements and recommendations specified by IEEE Std-450, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Generating Stations and Sub-stations," provides an adequate. basis for complying with the requirements of the Coninission's regulations with respect to the maintenance, testing, and replace-ment of large lead storage batteries, subject to the following conditions:

(1) - The-battery service test should be performed in addition to the battery performance discharge test, and (2) The battery service test should be performed during refueling operations or at some other outage, with intervals between tests not to exceed 18 months.

These conditions are consistent with Westinghouse Standard Technical Specifica-tions.

The staff also recommends that the bounding battery testing load profile be y

included in Point Beach's Final Safety Analysis Report, replacing the current Table 8.2-3,." Major Battery Loads Following Loss of Outside Power." Note'

,7 that this change would require a corresponding change to the Point Beach R

Technical Specification 15.4.6.B.4.

Sincerely,

/S/

I Warren H. Swenson, Project Manager l

Project Directorate III-3' Division of Reactor Projects - III, l

9005220190 900516 IV, V and Special Projects gDR ADOCK0500g6 Office of Nuclear Reactor Regulation 1

1

cc: See next page M

DOCUMENT NAME: REVISED BA a ESTING l

Office:

LA/ DIII-3 PDIII-3

-3 SELBg1 l-Surname: P re zer LDaniels/tg Swegson SSab6

" / /90 g y /90 fd5 /90 5 //6/90

\\

l Date:

Office:

PD I-3

,M\\

o Surname:

JHj'/

'\\

o

[

.Date:

/90 u

n v

f'1_,

'f May 1, % g, k

UNITED STATES g-NUCLEAR REGULATORY COMMISSION l

4%

'j WASHINGTON. D. C. 20665 3 *A t..

May 16, 1990 l

Docket Nos. 50-266-

-and 50,-301.

Mr. C. W. Fay,L Vice President Nuclear Power Department Wisconsin Electric Power Company 231 W. Michigan Street, Room 308 Milwaukee,- Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

> REVISED BATTERY TESTING PROGRAM POINT BEACH NUCLEAR PLANT, UNITS 1 i

AND 2 The staff has reviewed the. revised battery testing program as described in your letter dated ~ September 29.-1989.

In general, we concur with this battery testing program. However, 1.t is the position of the NRC as specified in Regula-tory Guide (RG) 1.129 that conformance with the requirements and recommendations :

specified by IEEE Std 450, "IEEE Recommended Practice for Maintenance, Testing, and. Replacement of Large Lead Storage Batteries for Generating Stations and Sub-stations," provides an adequate basis for complying with the-requirements of the Connission's regulations with respect to the maintenance, testing, and replace-ment of large lead storage batteries, subject to the following conditions:

(1) iThe battery service test should be performed in addition to the battery pet formance discharge test, and (2) The battery service test should be performed during refueling

. operations or at some other outage, with intervals between tests not to exceed 18 months.

These conditions are consistent with Westinghouse Standard Technical Specifica-tions.

7 The staff alsc recommends that the bounding battery testing load profile be included in Point Beach's Final Safety Analysis Report, replacing the current Table 8.2-3, " Major-Battery Loads Following Loss of Outside Power." Note that this change would require a corresponding change to the Point Beach Technical Specification 15.4.6.B.4.

Si cerely, u

7

(

t

'4 Warren H. Swenson, Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page 1

'i N ;.. i' -

C ~,'

  • Mr. C.'W. Fay Point Beach Nuclear Plant
Wisconsin Electric Power Company Units 1 and 2

-cc:

Ernest-L. Blake, Jr.

Shaw, Pittman, Potts and Trowbridge 2300 N Street.N.W.

4 Wrshington, DC 20037.

Mr. James J. Zach, Manager..

s Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road:

Two_ Rivers, Wisconsin 54241 1

lTownChairman Town of Two Creeks Poute 3

% 0 Rivers', Wisconsin 54241 Chairman Public Service Commission of' Wisconsin Hills; Farms State Office Building Madison, Wisconsin 53702 Regional Administrator. Region III U.S. Nuclear Regulatory Commission Office-of Executive Director i

for Operations i

799 Roosevelt Road Glen Ellyn, ' Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road i

Two Rivers, Wisconsin 54241 j