Application for Amends to Licenses DPR-24 & DPR-27, Supplementing TS Change Request 170,modifying TS 15.3.10, Control Rod & Power Distribution Limits & TS 15.4.1 Operational Safety Review
ML20116N131
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/15/1996
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116N132 List:
References
VPNPD-96-0049, VPNPD-96-49, NUDOCS 9608210255
Download: ML20116N131 (2)


Text

a

  • +

l Wisconsin

'Electnc -

POWER COMPANY 231 W'Michigort'PO Box 2046. MJwoukee, WI 63201-2046 (414)221-2345 VPNPD-96-0049 August 15,1996 Document Control Desk >

US NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:

1 DOCKETS 50-266 AND 50-301 SUPPLEMENT TO TECHNICAL SPECIFICATIONS CHANGE REOUEST 170 MODIFICATION OF TS 15.3.10.

" CONTROL ROD AND POWER DISTRIBUTION LIMITS" AND TS 15.4.1 " OPERATIONAL SAFETY REVIEW" POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 In a letter dated February 8,1996, Wisconsin Electric submitted Technical Specifications Change Request 170. In subsequent review of this Technical Specifications change request, it has been determined that a surveillance requirement that should be included for axial flux difference at- I power physics tests exceptions was inadvertently omitted. l An additional item of"at-power physics tests exceptions" should be included in proposed Specification 15.3.10.F, as follows:

7. At least once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, verify Fo (Z) and F% are within the required limits.

A revised set of edited Technical Specifications pages is provided as an attachment to this letter.

No revision to the original safety evaluation for this Technical Specification change request is

! considered necessary at this time because this surveillance requirement for at-power physics tests exceptions was inadvertently omitted. The inclusion of this requirement is necessary to maintain L consistency with the current Point Beach Technical Specifications and NUREG-1431, WOG Improved Standard Technical Specifications.

f 0 1

9608210255 960815 PDR ADOCK 05000266 l fY P PDR 1

5 A suh, Mon ofHiuvnsin ExarCotswathw

i Document Control Clerk August 15,1996 i i Pdge 2 l l

1 I

l It has been determined that this correction to the proposed amendments do not alter the i conclusion that these changes do not involve a significant hazards consideration, authorize a significant change in the types or total amounts of any effluent release, or result in any significant increase in individual or cumulative occupational exposure. We, therefore, continue to conclude ,

that the proposed amendments meet the requirements of 10 CFR 51.22(c)(9) and that an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared.

Please contact us if there are any questions.

Sincerely, l Bob ' ink Vice President Nuclear Power CAC/kmc ,

Attachment cc: NRC Regional Administrator, Region III NRC Resident Inspector Subscribed to and sworn to before me this 15* day of sal ,1996.

OmL ]cuA otaly1 l

/comm(dblic, State of Wisconsinission expires to,/al l 9 L i