Text
-
_... -. -. _ - ~ ~ -. _
TABLE 15.4.12 (Continued)
- 30. Pressurizer Heaters Verify that 100 KW of Quarterly heaters are available.-
- 31. CVCS Charging Pumps Verify rability of Quarterly pumps
- 32. Potential Dilution in Verify operability of Prior to placing plant in Progress Alarm alem.
cold shutdown.
- 33. Core Power Distribution Perform power distribu-Monthly "
tion maps using movable incore detector system to confirm hot channel factors.
- 34. Shutdown Margin Perform shutdown margin Daily
- calculation.
1 (1)
Required only during periods of power operation.
(2)
E determination will be started when the gross activity analysis of a filtered sample indicates 210 Ci/cc and will be redetermined if the primary coolant gross radioactivity of a filtered sample increases by more than 10pCi/cc.
(3)
Drop test shall be conducted at rsted reactor coolant flow. Rods shall be dropped under both cold and hot condition, but cold drop tests need not be timed.
(4)
Drop tests will be conducted in the hot condition for rods on which maintenance was performed.
(5)
As accessible without disassembly of rotor.
(6)
Not required during periods of refueling shutdown.
l (7)
At least once per week during periods of refueling shutdowTi.
(8)
At least three times per week (with maximum time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples) during periods of refueling shutdown.
(9)
Not required during periods of cold or refueling shutdown, but must be performed prior to exceeding 200 F if it has not been performed during the previous surveillance period.
(10)
Sample to be taken after a minimum of 2 EFPD and 20 days power operation since the reactor was last subcritical for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer.
(11)
An approximately equal number of valves shall be tested each refueling outage such that all valves will be tested within a five year period. If any valve fails its tests, an additional number of valves equal to the number originally tested shall be tested. If any of the additional tested valves fail, all remaining valves shall be tested.
(12)
The specified buses shall be determined energized in the required manner at least once per shift by verifying correct static transfer switch alignment and indicated voltage on the buses.
(13)
Not required if the block s alve is shut to isolate a PORV that is inoperable for reasons other than excessive seat leakage.
O*
Only applicable when the overpressure mitigation system is in service.
(15)
Required to be performed only if conditions will be established, as defined in Specification 15.3.15, where the PORVs are used for low temperature overpressure protection. The test must be performed prior to establishing these conditions.
9702110123 970205 PDR ADOCK 05000266 p
POR Unit 1 - Amendment No.h h l Unit 2 - Arnendrnent No.'lM, h,,171 175 Page 4 of 5 g
Corrected February 5, 1997 9701110113
l' TABLE 15.4.1-2 (Continued)
(16)
Test valve operation in accordance with the inservice test requirements of the ASME Boiler and Pressure Vessel Code,Section XI.
j (17)
Operability of charging pumps is verified by ensuring that the pumps develop the required flowrate, as specified by the In Service Test Program.
(18)
Not required to be performed if the reactor is subcritical.
(19)
Required only when the BAST (s) are relied upon as a source of borated water.
(20)
Perform during power operation at effective full power monthly intervals. Following a refueling shutdown, a power distribution map shali be performed prior to exceeding 90% of rated thermal power.
(21)
Only applicable during low-power physics testing.
i
-l Unit 1 - Amendment No. 171 l Unit 2 - Amendment No. 175 Page 5 of 5 Corrected February 5, 1997