n itr uqk UNITED STATES g
g
,[
NUCLEAR REGULATORY COMMISSION n
g WASHINGTON, D.C. 20066-0001
..o,*
WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-266 POINT BEACH NUCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENS.E Amendment No.183 License No. DPR-24 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (the licensee) dated November 17,1995, as supplemented on July 29,1996, and December 15,1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules i
and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the 4
Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The ssuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
(
9804070231 980324 PDR ADOCK 05000266 P
PDR J
., 2.
Accordingly, the licen e is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility i
Operating License N s. DPR-24 is hereby amended to read as follows:
i B.
Technical f pecifications The Tec'enical Specifications contained in Appendices A and B, as revised throug', Amendment No. 183 ~, are hereby incorporated in the license. The licey,ee shall operate the facility in accordance with Technical Specifications.
3.
This lice,nse amendment is effective immediately upon issuance. The Technical Spec 5 cations are to be implemented within 45 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION NW Linda L. Gundrum, Project Manager Project Directorate 111-1 Division of Reactor Projects - lil/lV -
Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date ofissuance: March 24, 1998 4
)
~
so rts p
t UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006H001
$, n
/
WISCONSIN ELECTRIC POWER COMPANY DOCKET NO 50-301 POINT BEACH NUCLEAR PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.187 License No. DPR-27 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (the licensee) dated November 17,1995, as supplemented on July 29,1996, and December 15,1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Acti and the Commission's rules and regulations set forth in 10 CFR Chapter 8' B.
The facility will operate in conformity with th: s vilcation, the provisions of the Act, and the rules and regulations of the Con, mission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
1
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-27 is hereby amended to read as follows:
B.
Technical Soecifications The Technical Specifiestions contained in Appendices A and B, as revised through Amendment No. 187, are hereby incorporated in the license. The licensee shall operate the facility in accordance with Technical Specifications.
3.
This license amendment is effective immediately upon issuance. The Technical Specif. cations are to be implemented within 45 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION S
Linda L. Gundrum, Project Manager Project Directorate lil-1 Division of Reactor Projects.-lil/lV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date ofissuance: March 24, 1998 i
I
ATTACHMENTTO LICENSE AMENDMENT NOS.183 AND 187 TO FACILITY OPERATING LICENSE NOS. DPR-24 AND DPR-27 DOCKET NOS. 50-266 AND 50-301 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
REMOVE INSERT 15.6.3-1 15.6.3-1 15.6.3-2 15.6.3-2 15.6.4/5-1 15.6.4/5-1
15.6.3 FACILITY STAFF QUAllFICATIONS 15.6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions or as clarified in 15.6.3.2 through 15.6.3.5.
15.6.3.2 Except as provided in 15.6.3.3, the Health Physicist shall be a line supervisor and shall meet the following requirements:
a.
The individual shall have a bachelor's degree or the equivalent in a science or engineering subject, including some formal training in radiation protection. For purposes of this paragraph, equivalent"is as follows:
(1)
Four years of formal schooling in science or engineering; or (2)
Four years of applied radiation protection experience at a nuclear facility; or (3)
Four years of operational or technical experience or training in nuclear power; or (4)
Any combination of the above totaling four years.
b.
Except as provided in d., below, the individual shall have at least five years of professional experience in applied radiation protection. A master's degree in a related field is equivalent to one year of experience and a doctor's degree in a related field is equivalent to two years of experience.
c.
Except as provided in d., below, at least three of the five years of j
experience shall be in applied radiation protection work in a nuclear facility dealing with radiological problems similar to those encountered in nuclear power plants.
d.
If the individual has a bachelor's degree specifically in health physics, radiological health, or radiation protection, at least three years of professional experience is required; if the individual has a master's or a doctor's degree specifically in health physics, radiological health, or radiation protection, at least two years of professional experience is required. This experience shall be in applied radiation protection in a nuclear facility dealing with radiological problems similar to those encountered in nuclear power plants.
15.6.3-1 Unit 1 - Amendment No. 446,464,183 Unit 2 - Amendment No. 450,468,187 l
j
15.6.3.3 in the event the position of Health Physicist is vacated and the proposed l
replacemant does not meet all the qualifications of 15.6.3.2, but is determined to be otherwise well qualified, the concurrence of NRC shall be sought in approving the qualification of that individual.
15.6.3.4 The Duty Technical Advisor shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific training in plant design and response and analysis of the plant for transients and accidents. The Duty Technical Advisor shall also receive training in plant design and layout including the capabilities of instrumentation and controls in the control room.
15.6.3.5 The Operations Manager shall:
1)
Hold a Senior Reactor Operator license at PBNP; or 2)
Have held a Senior Reactor Operator license at PBNP or a similar unit; or 3)
Have been certified at an appropriate simulator for equivalent senior operator knowledge level.
If the Operations Manager does not hold a Senior Reactor Operator license at PBNP, then an operations middle manager to whom the operating crews report shall hold a Senior Reactor Operator license at PBNP.
I 15.6.3-2 Unit 1 - Amendment No. 446,464,183 Unit 2 - Amendment No. 460,468,187
i 15.6.4 TRAINING 15.6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Manager and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and 10 CFR Part 55.
15.6.5 REVIEW AND AUDIT 15.6.5.1 Manager's Supervisory Staff 15.6.5.1.1 The Manager's Supervisory Staff (MSS) shall function to advise the Manager on all matters related to nuclear safety.
15.6.5.1.2 The Manager's Supervisory Staff shall be selected and designated by the Manager from a list of qualified individuals in the following disciplines:
Operations Maintenance Health Physics Engineering Licensing Training Chemistry 15.6.5.1.3 Each individual representing a MSS discipline shall meet or exceed the qualification requirements specified in Section 4.2 of ANSI N18.1-1971, except as described in Specification 15.6.3.2 for the Health Physicist.
l l
15.6.4/5 1 Unit 1 - Amendment No. 4M, 183 Unit 2 - Amendment No. 4N, 187 I
)
)