ML20054C992
From kanterella
Jump to navigation
Jump to search
ML20054C992 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 03/15/1982 |
From: | Hood D Office of Nuclear Reactor Regulation |
To: | Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8204220222 | |
Download: ML20054C992 (16) | |
Similar Documents at Midland | |
---|---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20149L4981988-02-12012 February 1988
[Table view]Summary of 871207 Meeting W/Utils in Bethesda,Md Re Licensees Revised Proposal to Comply W/Nrc Requirement for Simulation Facilities Under 10CFR55.45(b).List of Attendees & Util Simulation Facility Group Guideline Encl ML20140H0711985-09-30030 September 1985 Summary of ACRS Ad Hoc Subcommittee on Midland 820429 Meeting W/Util & Consultants in Washington,Dc Re Foundation Problems & Remedial Action ML20127N3831985-05-16016 May 1985 Summary of 850321 & 0417 Meetings W/Util Re Surveillance & Maint Plan & QA Program Plan for Surveillance & Maint Phase During Const Shutdown Condition.List of Attendees & Viewgraphs Encl ML20095A3701984-07-18018 July 1984 Agenda for 800930 Meeting W/Util on Site for Appeal of NRC Position ML20093N8991984-07-18018 July 1984 Summary of 840417 Meeting W/Tera,Structural Mechanics Assoc (SMA) & Util in Chicago,Il to Discuss SMA Seismic Margins Evaluation & Potential Applicability to Disposition of Outstanding Civil/Structural Issues ML20094M5281984-03-20020 March 1984 Summary of NRC 840314 Meeting W/D Bridenbaugh of Mab Technical Assocs in Region III Re Info on Midland & Zimmer Plants.Util to Atty General of State of Mi Encl ML20138L4471984-02-15015 February 1984 Summary of 840120 Meeting W/B Garde in Bethesda,Md Re Garde Concerns Expressed to J Axelrad Re Enforcement Action Against Midland for Violation of Board-ordered CP Conditions ML20091F2051984-02-14014 February 1984 Summary of 831004-07 Audit & Meeting W/Util in Ann Arbor,Mi Re safety-related Portions of HVAC Sys ML20091F2091984-02-14014 February 1984 Summary of 831027 Meeting W/Util & Zack Co at Site Re Open Items from 831004-07 HVAC Design Audit.Related Info Encl, Including Status of Allegations as of 840228 ML20094P7421984-01-13013 January 1984 Handwritten Summary of 840104 Public Meeting W/Util,S&W Bechtel Re Monthly Activities,Crack Rept,Crack Mapping & Open Items.Supporting Documentation & Attendance List Encl ML20090H4951983-11-17017 November 1983 Trip Rept Re 831027 Site Visit Re Unresolved Items from 831028 HVAC Audit.No Unresolved Items Remain. Final Safety Evaluation Will Be Provided Under Separate Cover ML20024F0541983-08-19019 August 1983 Summary of 830816 Meeting W/Bechtel in Glen Ellyn,Il Re NRC Views on Bechtel Performance.Bechtel Employees Concerned That Region III Does Not Believe Bechtel Serious About Improving Performance ML20024D5221983-08-0101 August 1983 Summary of 830617 Telcon W/Util Re SER Open Items 4 & 11 & Confirmatory Issues 12 & 14.Requested Info Forthcoming.List of Participants Encl ML20024D5301983-08-0101 August 1983 Summary of 830614 Telcon W/Util & Eg&G Idaho Re Heavy Loads, Util 830217 & 0415 Submittals & Concerns Following Preliminary Reviews,Per 820524 Draft Technical Evaluation Rept Guidelines 3,4 & 7.List of Participants Encl ML20024A5621983-06-0909 June 1983 Summary of 830413 Meeting W/Util & Tera Corp in Bethesda,Md Re Independent Design & Const Verification Program.Items Discussed Included Protocol for Reporting & Communications & Tera Team Organization ML20028B8141982-11-29029 November 1982 Summary of 821109 Meeting W/Util in Bethesda,Md Re Preliminary Results of Seismic Margins Analysis for Svc Water Pump Structure & Borated Water Storage Tank ML20028B5231982-11-22022 November 1982 Summary of 821105 Meeting W/Util,S&W,Parsons,Brinckerhoff & Govt Accountability Project in Bethesda,Md Re Independent Assessment of Auxiliary Bldg Underpinning ML20132F0821982-09-20020 September 1982 Summary of 820915 Meeting W/Util in Chicago,Il Re Proposed Util Investigation Into Gap Allegations Concerning Facilities.Util Agreed to Delay Investigation Until NRC Completes Investigation.Related Info Encl ML20027C9111982-08-16016 August 1982 Summary of ACRS Subcommittee on Midland Plant Units 1 & 2 820602 Meeting in Washington,Dc Re Application for OL ML20094P5081982-08-0909 August 1982 Summary of ACRS Subcommittee on Midland Units 1 & 2 820520 & 21 Meetings W/Util in Midland,Mi Re Review of OL Application ML20063G0881982-07-26026 July 1982 Summary of Mi Environ Review Board 820726 Meeting in Lansing,Mi Re EIS ML20058B4421982-07-19019 July 1982 Summary of 820625 Meeting W/Util & Bechtel in Bethesda,Md Re soils-related Requests for Info ML20125B5001982-07-15015 July 1982 Trip Rept of 820630-0701 Visit to Site Re Testing of Potentially Defective Containment Coatings ML20054J7921982-06-23023 June 1982 Summary of 820615 Meeting W/Util in Bethesda,Md Re Status of Schedule Development for Review of Soils Remedial Actions.Ltr of Clarification Re Fivp Proof Load Test Will Be Issued in Future ML20054J8101982-06-23023 June 1982 Summary of 820601 Meeting W/Util in Bethesda,Md Re Elements of Physical Security Plan.Comments Withheld Per 10CFR73.21. Response to Comments & Corresponding Revisions to Plan Will Be Forwarded by 820630 & 0715,respectively ML20054A6311982-04-0202 April 1982 Summary of 820316 Meeting W/Util Re Review & Hearing Schedules for Soils Remedial Work at Facility ML20054D2801982-03-16016 March 1982 Supplemental Summary of 820118-20 Meeting & Audit W/Util & Bechtel in Ann Arbor,Mi Re Plans & Preparations on Phase II Const for Underpinning of Auxiliary Bldg ML20052A7371982-03-16016 March 1982 Summary of 811103-05 Meetings W/Util in Jackson,Mi Re FSAR Chapter 13 ML20054C9921982-03-15015 March 1982 Summary of 820108 Meeting W/Util in Glen Ellyn,Il Re Operator Licensing.Handouts & Viewgraphs Encl ML20094K3491982-03-11011 March 1982 Summary of 840304 Meeting W/Util Re Schedules & Topics for Instant Hearing on Soils Matters.Hearing Schedule Resulting in Inefficient Reviews Due to Changing Const Priorities by Applicant ML20049J0381982-03-0202 March 1982 Summary of 810620-24 Audit of Seismic & Structural Design Calculations ML20041D1311982-02-0505 February 1982 Summary of 811001 Meeting W/Util & Bechtel Power Corp in Bethesda,Md Re Design & Const Aspects of Underpinning Planned Beneath Auxiliary Bldg ML20090B3801982-01-29029 January 1982 Summary of 820112 Meeting W/Util in Glen Ellyn,Il Re QA Organization Changes & Underpinning ML20093P1251982-01-22022 January 1982 Agenda for 820121-22 Meeting to Discuss Underground Piping Concerns.W/Handwritten Summary of 820107 Conference Call Re Underground Piping & 820120 Evaluation of Sand Settlement Due to Earthquake ML20040A7501981-12-31031 December 1981 Summary of 811104 Meeting W/Consultants & Util in Bethesda, MD Re Remedial Plans for Auxiliary Bldg & Feedwater Isolation Valve Pit Foundations.List of Attendees,Meeting Agenda & Schedule of Util Work Progress Encl ML20039C1131981-11-23023 November 1981 Summary of 810917 Meeting W/Util,Bechtel & Mueser,Rutledge, Johnson & Desmoine Re Preliminary Design of Mods Proposed to Foundation of Part of Svc Water Pump Structure Founded on Inadequate Fill.Attendee List,Agenda & Viewgraphs Encl ML20038A7491981-11-0909 November 1981 Summary of 810921 Meeting W/Util & B&W in Bethesda,Md Re Conformance of FSAR Fuel Design Section to Revision 2 Given in Srp.Also Discussed Approaches to Technical Issues Previously Outstanding on Other Plants.Viewgraphs Encl ML20093P1581981-10-0606 October 1981 Agenda for 811006 Meeting W/Bechtel,Util & Army Corps of Engineers to Discuss Underground Piping Reprofiling,Proposed Demonstration Solution & 1981 Measurement Results ML20010J4171981-09-29029 September 1981 Summary of 810505-07 Meeting W/Util,Bechtel & Consultants Re Remedial Activities Resulting from Inadequate Soils Compaction at Site.Attendee List & Viewgraphs Encl ML20094J4411981-09-18018 September 1981 Summary of 810917 Meeting W/Cpc,Us Army Corps of Engineers, Nrc,Bechtel & Mueser,Rutledge,Wentworth & Johnson in Bethesda,Md Re Preliminary Design of Proposed Remedial Measures for Svc Water Pumping Structure ML20010G4371981-09-11011 September 1981 Summary of 810805 Meeting W/Util,Bechtel,Graver Co & Us Army Corps of Engineers in Midland,Mi Re Surcharging of Valve Pits of Borated Water Storage Tank Foundations ML20079R1291981-08-24024 August 1981 Agenda for 810825 Meeting W/Nrc Caseload Forecast Panel to Conduct Plant Tour.Related Info Encl ML20093P0681981-08-19019 August 1981 Summary of 810721 Meeting W/Applicant in Bethesda,Md Re Summary of San Onofre Meeting on Confirmatory Analysis of Piping Sys Design.Confirmatory Analysis Encl ML20094J0391981-08-0505 August 1981 Handwritten Summary of 810805 Meeting in Ramada Central Inn Re Borated Water Storage tank.W/810728 Handwritten Memo Re Status of Review on Borated Water Storage Tank ML20010A0891981-07-30030 July 1981 Summary of 810630 Meeting W/Util in Bethesda,Md Re Seismological Input Issues.List of Attendees & Presentation Matls Encl ML20010A8891981-07-29029 July 1981 Summary of 810715 Telephone Conference W/Util,Bechtel & Us Army Corps of Engineers Re Borated Water Storage Tank Surcharge Program ML20008E4801981-02-20020 February 1981 Trip Rept of Jp Matra & J Kane 810127 Site Visit Re Cracks in Concrete Foundation of Borated Water Storage Tanks. Plastic Sheeting Erected Adjacent to Unit 2 Tank.Excavation to Inspect Cracks Not Yet Started ML20090A7581980-10-17017 October 1980 Summary of 800617 Meeting W/Util in Bethesda,Md Re Fire Protection Evaluation Rept ML20079R1101980-07-25025 July 1980 Agenda for 800729 Caseload Forecast Panel Site Visit. Related Info Encl ML20094M7121980-07-0707 July 1980 Summary of 800523 Meeting W/Util,B&W,Bechtel & Teledyne in Bethesda,Md Re Preservice Failure of Three Reactor Vessel Holddown Studs.List of Attendees,Agenda & Viewgraph Slides Encl.Sketches for Underpinning Auxiliary Bldg Encl 1988-02-12 Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT) MONTHYEARML20149L4981988-02-12012 February 1988
[Table view]Summary of 871207 Meeting W/Utils in Bethesda,Md Re Licensees Revised Proposal to Comply W/Nrc Requirement for Simulation Facilities Under 10CFR55.45(b).List of Attendees & Util Simulation Facility Group Guideline Encl ML20140H0711985-09-30030 September 1985 Summary of ACRS Ad Hoc Subcommittee on Midland 820429 Meeting W/Util & Consultants in Washington,Dc Re Foundation Problems & Remedial Action ML20127N3831985-05-16016 May 1985 Summary of 850321 & 0417 Meetings W/Util Re Surveillance & Maint Plan & QA Program Plan for Surveillance & Maint Phase During Const Shutdown Condition.List of Attendees & Viewgraphs Encl ML20093N8991984-07-18018 July 1984 Summary of 840417 Meeting W/Tera,Structural Mechanics Assoc (SMA) & Util in Chicago,Il to Discuss SMA Seismic Margins Evaluation & Potential Applicability to Disposition of Outstanding Civil/Structural Issues ML20094M5281984-03-20020 March 1984 Summary of NRC 840314 Meeting W/D Bridenbaugh of Mab Technical Assocs in Region III Re Info on Midland & Zimmer Plants.Util to Atty General of State of Mi Encl ML20138L4471984-02-15015 February 1984 Summary of 840120 Meeting W/B Garde in Bethesda,Md Re Garde Concerns Expressed to J Axelrad Re Enforcement Action Against Midland for Violation of Board-ordered CP Conditions ML20091F2091984-02-14014 February 1984 Summary of 831027 Meeting W/Util & Zack Co at Site Re Open Items from 831004-07 HVAC Design Audit.Related Info Encl, Including Status of Allegations as of 840228 ML20091F2051984-02-14014 February 1984 Summary of 831004-07 Audit & Meeting W/Util in Ann Arbor,Mi Re safety-related Portions of HVAC Sys ML20024F0541983-08-19019 August 1983 Summary of 830816 Meeting W/Bechtel in Glen Ellyn,Il Re NRC Views on Bechtel Performance.Bechtel Employees Concerned That Region III Does Not Believe Bechtel Serious About Improving Performance ML20024D5301983-08-0101 August 1983 Summary of 830614 Telcon W/Util & Eg&G Idaho Re Heavy Loads, Util 830217 & 0415 Submittals & Concerns Following Preliminary Reviews,Per 820524 Draft Technical Evaluation Rept Guidelines 3,4 & 7.List of Participants Encl ML20024D5221983-08-0101 August 1983 Summary of 830617 Telcon W/Util Re SER Open Items 4 & 11 & Confirmatory Issues 12 & 14.Requested Info Forthcoming.List of Participants Encl ML20024A5621983-06-0909 June 1983 Summary of 830413 Meeting W/Util & Tera Corp in Bethesda,Md Re Independent Design & Const Verification Program.Items Discussed Included Protocol for Reporting & Communications & Tera Team Organization ML20028B8141982-11-29029 November 1982 Summary of 821109 Meeting W/Util in Bethesda,Md Re Preliminary Results of Seismic Margins Analysis for Svc Water Pump Structure & Borated Water Storage Tank ML20028B5231982-11-22022 November 1982 Summary of 821105 Meeting W/Util,S&W,Parsons,Brinckerhoff & Govt Accountability Project in Bethesda,Md Re Independent Assessment of Auxiliary Bldg Underpinning ML20132F0821982-09-20020 September 1982 Summary of 820915 Meeting W/Util in Chicago,Il Re Proposed Util Investigation Into Gap Allegations Concerning Facilities.Util Agreed to Delay Investigation Until NRC Completes Investigation.Related Info Encl ML20027C9111982-08-16016 August 1982 Summary of ACRS Subcommittee on Midland Plant Units 1 & 2 820602 Meeting in Washington,Dc Re Application for OL ML20094P5081982-08-0909 August 1982 Summary of ACRS Subcommittee on Midland Units 1 & 2 820520 & 21 Meetings W/Util in Midland,Mi Re Review of OL Application ML20058B4421982-07-19019 July 1982 Summary of 820625 Meeting W/Util & Bechtel in Bethesda,Md Re soils-related Requests for Info ML20054J7921982-06-23023 June 1982 Summary of 820615 Meeting W/Util in Bethesda,Md Re Status of Schedule Development for Review of Soils Remedial Actions.Ltr of Clarification Re Fivp Proof Load Test Will Be Issued in Future ML20054J8101982-06-23023 June 1982 Summary of 820601 Meeting W/Util in Bethesda,Md Re Elements of Physical Security Plan.Comments Withheld Per 10CFR73.21. Response to Comments & Corresponding Revisions to Plan Will Be Forwarded by 820630 & 0715,respectively ML20054A6311982-04-0202 April 1982 Summary of 820316 Meeting W/Util Re Review & Hearing Schedules for Soils Remedial Work at Facility ML20052A7371982-03-16016 March 1982 Summary of 811103-05 Meetings W/Util in Jackson,Mi Re FSAR Chapter 13 ML20054D2801982-03-16016 March 1982 Supplemental Summary of 820118-20 Meeting & Audit W/Util & Bechtel in Ann Arbor,Mi Re Plans & Preparations on Phase II Const for Underpinning of Auxiliary Bldg ML20054C9921982-03-15015 March 1982 Summary of 820108 Meeting W/Util in Glen Ellyn,Il Re Operator Licensing.Handouts & Viewgraphs Encl ML20094K3491982-03-11011 March 1982 Summary of 840304 Meeting W/Util Re Schedules & Topics for Instant Hearing on Soils Matters.Hearing Schedule Resulting in Inefficient Reviews Due to Changing Const Priorities by Applicant ML20049J0381982-03-0202 March 1982 Summary of 810620-24 Audit of Seismic & Structural Design Calculations ML20041D1311982-02-0505 February 1982 Summary of 811001 Meeting W/Util & Bechtel Power Corp in Bethesda,Md Re Design & Const Aspects of Underpinning Planned Beneath Auxiliary Bldg ML20090B3801982-01-29029 January 1982 Summary of 820112 Meeting W/Util in Glen Ellyn,Il Re QA Organization Changes & Underpinning ML20040A7501981-12-31031 December 1981 Summary of 811104 Meeting W/Consultants & Util in Bethesda, MD Re Remedial Plans for Auxiliary Bldg & Feedwater Isolation Valve Pit Foundations.List of Attendees,Meeting Agenda & Schedule of Util Work Progress Encl ML20039C1131981-11-23023 November 1981 Summary of 810917 Meeting W/Util,Bechtel & Mueser,Rutledge, Johnson & Desmoine Re Preliminary Design of Mods Proposed to Foundation of Part of Svc Water Pump Structure Founded on Inadequate Fill.Attendee List,Agenda & Viewgraphs Encl ML20038A7491981-11-0909 November 1981 Summary of 810921 Meeting W/Util & B&W in Bethesda,Md Re Conformance of FSAR Fuel Design Section to Revision 2 Given in Srp.Also Discussed Approaches to Technical Issues Previously Outstanding on Other Plants.Viewgraphs Encl ML20010J4171981-09-29029 September 1981 Summary of 810505-07 Meeting W/Util,Bechtel & Consultants Re Remedial Activities Resulting from Inadequate Soils Compaction at Site.Attendee List & Viewgraphs Encl ML20010G4371981-09-11011 September 1981 Summary of 810805 Meeting W/Util,Bechtel,Graver Co & Us Army Corps of Engineers in Midland,Mi Re Surcharging of Valve Pits of Borated Water Storage Tank Foundations ML20093P0681981-08-19019 August 1981 Summary of 810721 Meeting W/Applicant in Bethesda,Md Re Summary of San Onofre Meeting on Confirmatory Analysis of Piping Sys Design.Confirmatory Analysis Encl ML20094J0391981-08-0505 August 1981 Handwritten Summary of 810805 Meeting in Ramada Central Inn Re Borated Water Storage tank.W/810728 Handwritten Memo Re Status of Review on Borated Water Storage Tank ML20010A0891981-07-30030 July 1981 Summary of 810630 Meeting W/Util in Bethesda,Md Re Seismological Input Issues.List of Attendees & Presentation Matls Encl ML20010A8891981-07-29029 July 1981 Summary of 810715 Telephone Conference W/Util,Bechtel & Us Army Corps of Engineers Re Borated Water Storage Tank Surcharge Program ML20090A7581980-10-17017 October 1980 Summary of 800617 Meeting W/Util in Bethesda,Md Re Fire Protection Evaluation Rept ML20094M7121980-07-0707 July 1980 Summary of 800523 Meeting W/Util,B&W,Bechtel & Teledyne in Bethesda,Md Re Preservice Failure of Three Reactor Vessel Holddown Studs.List of Attendees,Agenda & Viewgraph Slides Encl.Sketches for Underpinning Auxiliary Bldg Encl ML20093B4951980-03-10010 March 1980 Summary of 800227 & 28 Meeting & Site Visit W/Util in Midland,Mi Re Soil Settlement Problems & Related Investigation Program ML20090A4471979-08-27027 August 1979 Summary of 790821-22 Meeting W/Bechtel Power Corp,& San Francisco Power Div Re Generic Application of QA Topical Rept BQ-TOP-1 & Proposed Exceptions to Reg Guide 1.123 as Applied to ASME Code Shops ML20091L1191979-08-24024 August 1979 Summary of 790816 Site Meeting Re Status of Staff Review of Soils Settlement Issue ML20090A1101979-03-20020 March 1979 Summary of 790306 Site Visit to Observe Status of Soil Preloading Program Being Performed to Consolidate Fill in Vicinity of & Underneath Diesel Generator Bldg ML20090A1031979-02-27027 February 1979 Summary of 790117 Meeting W/Util,Bechtel Associates & B&W in Bethesda,Md to Discuss PSAR Changes & Reg Guides on QA ML20094K2281978-12-0707 December 1978 Handwritten Summary of 781204 Site Meeting Re Excessive Settlement of Diesel Generator Bldg & Foundations & Other Category I Structures ML20148P1361978-11-14014 November 1978 Summary of 781106 Meeting W/Cpc in Bethesda,Md Re Extension of Const Completion Dates.Draft Response to 781027 Questions Encl ML20090A6001978-02-16016 February 1978 Summary of 780213 Meeting W/Util in Bethesda,Md Re Util QA Program Topical Rept Changes ML20090A5941977-05-0505 May 1977 Summary of 770428 Meeting W/Util in Bethesda,Md Re Operator Training & Qualifications.Equipment & Circuit Separation Criteria Review Encl ML20090A6231977-03-28028 March 1977 Summary of 770323-25 Midland,Mi Site Tour & Interviews W/Midland City & County Officials Re Evaluation of Post & Prospective Community Impacts Associated W/Facility Const ML19212A3451976-09-29029 September 1976 Integrated Notes of Meetings on 760929,1012,1101,08 & 15 1988-02-12 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20054C992&oldid=4498705"