TER.A E ( f eno uq p
UNITED STATES g
NUCLEAR REGULATORY COMMISSION o
h WASHINGTON, D. C. 20655
\\...../
FEB 2 0 1981 i
t i
Docket Nos.:
50-329/330 OM, OL APPLICANT: Consumers Power Company FACILITY:
Midland Plant, Units 1 & 2
SUBJECT:
SUMMARY
OF JANUARY 27, 1981 VISIT TO OBSERVE CRACKS IN CONCRETE RING FOUNDATION OF B0 RATED WATER STORAGE TANKS On January 27, 1981 Messrs. Joseph Kane of the NRC and John P. Matra, Jr. of the Naval Surface Weapons Center (NRC consultant) visited the Midland site to observe cracks which have occurred in the concrete ring foundation for the Borated Water Storage Tank. The tanks have been constructed and filled as a full scale test intended to justify that the underlying soils are suitable for support of the tanks (see response to NRC question 6. Revision 3 to Amendment 72, September 13,1979). These cracks do not include those observed in the foundation prior to tank construction (question 14, same amendment).
The cracks in the ring foundation for Unit 1 borated water tank were visible because an inspection pit had been excavated to the top of the ring wall footing along the southern periphery.
A plastic sheeting for protection against the cold winds had been erected adjacent to Unit 2 borated water tank but the excavation to inspect for cracks in'the ring foundation below plant grade had not yet started.
Mr. Kane was accompanied by Messrs. R, Wheeler nd D. Miller of Consumers a
i Power Co. on his visit.
Following the field inspection brief discussions were held between Messrs. Cooke, Wheeler and Kane which included a telephone call contact with Mr. Thiruvengadam of Consumers Power Company concerning information to be included in the anticipated report in response to 10 CFR 50.55(e) action.
F is the trip report of Mr. Matra.
Y,.9 9 I-L Darl S. Hood, Project Manager 1
Licensing Branch No. 3 Division of Licensing
Enclosure:
Matra Trir Rep c
cc w/ enc 1:
ext page.
i i
i
.5 8103opoO7cf i
Mr. J. W. Cock Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq.
Mr. Don van Farowe, Chief Ronald G. Zamarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 1 First National Plaza Chicago, Illinois 60603 William J. Scanlon, Esq.
James E. Brunner, Esq.
2034 Pauline Boulevard Consumers Power Company Ann Arbor, Michigan 48103 212 West Michigan Avenue Jackson, Michigan 49201 U. S. Nuclear Regulatory Cannission Resident Inspectors Office Myron M. Cherry, Esq.
Route 7 1 IBM Plaza Midland, Michigan 48640 t
j Chicago, Illinois 60611 I
Ms. Mary Sinclair Ms. Barbara Stamiris 5711 Summerset Drive 5795 N. River Midland, Michigan 48640 Freeland, Michigan 48623 l
Frank J. Kelley, Esq.
Ms. Sharon K. Warren Attorney General 636 Hillcrest State of Michigan Environmental Midland, Michigan 48640 l
Protection Division 720 Law Building Lansing, Michigan 48913 Mr. Wendell Marshall Route 10 Midland, Michigan 48640 t
Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108 5
(
l t
h l
7
-. ~.
i i
L,
?
1 li cc: Commander, Naval Surface Weapons Center j
ATTN:
P. C. Huang G-402 White Oak Silver Spring, Maryland 20910 i
Mr. L. J. Auge, Manager
~
Facility Design Engineering i
Energy Technology Engineering Center
}
P. O. Box 1449 j
Canoga Park, California 91304 Mr. William Lawhead U. S. Corps of Engineers HCEED - T 7th Floor l
477 f!ichigan Avenue l
Detroit, Michigan 48226 Ct.arles Dechhoefer, Esq.
I Atomic Safety I-Licensing Board
{
U. S. Nuclear Regulatory Commissic, Washington, C. C.
20555 l
Mr. Gustave A. Linenberor:r i
Atcmic Safety & Licensirg Eoard
[
U. S. Nuclear Regulatory Conmissicn Pashington, D. C.
20S55 l
'Dr. Frederick P. Cowan Apt. B-125 l
6125 N. Verde Trail j
Poce Raton, Florida 33433 i
e 4
i i
4 l
NSWC:G402:JPM:emb 2 February 1981 MEMORANDUM From: John P. Matra, Jr. (G402)
To:
Frank Rinaldi (SEB)
Via:
G402 Subj: Trip Report - Site investigation of cracks observed in the foundation of the borated water tanks at Midland Plants Units 1 and 2 Ref:
(a) Docket Nos. 50-329/330 OM, OL 1.
On January 27, 1981, the undersigned met with Mr. Tom C. Cooke of Consumer Power Company to discuss and observe the cracks in the concrete ring foundation of the borated water tanks. At this meeting, Mr. Cooke re-lated the following to me:
a.
The long term settlement predication for the borated water tank structure was calculated by Bechtel.
b.
In this analysis, the soil properties under the borated water tark foundation were represented by simplified springs.
c.
The tanks were loaded and the settlements were recorded. These recorded settlement values vastly differed from those originally predicted by Bechtel.
d.
Bechtel did a new analysis in which 3-D elastic brick elements were used to represent the soil. A combined live, dead and water load was used in the analysis. A stress of 1.50 times the ultimate capacity of the concrete ring foundation was found. The analysis also predicted the structure settlements which agreed closely with the test results. A high moment was also noted at the ring foundation near the valve pit.
e.
Mr. T. Thiruvengadaki also told Cooke that the old calculation was in error because it did not incorporate the stiffness variation and differential settlement between the valve pit and ring foundation.
2.
In a visual inspection of the borated water storage tank structures, the following was noted:
a.
Cracks (Max:c.060 inches) in the concrete ring foundation on both sides of the valve pit.
(See Figure 1-A&B).
b.
Gaps approximate 1.v 1/4 inch wide were observed between bottom face of nut and top of base plate of brackets.
The location of these bolts were found in the areas of the valve pit and 180 from it.
The bolts at 90 and 270 from the valve pit seemed to be tight.
j i
I l
i
c.
A large pit was dug out along the tank foundation and the pit was full of water. Cooke indicated that the pit elevation is below the water line in the reservoir and the water in the pit was being pumped out.
=
?
JOHN P. MATRA, on.
Copy to:
F. Schatser (SEB/NRR) 3 D. Hood (DOL) t i
i 4
t 5
i l
I l
I k
i
,--,,--.--,_a
,--,.,a
,-we--
4.
fWF'l(
/
/
7
) 6tifLL t{ $!A'fr !d4!<'.
I f
e f ' offfb $&O q
a I
/
r IN 8,~770 +f T
Pu/rf l
+
n h
V 't?Q llb e
~
a l M P C f 6 /)/! I s' D
___nG (3os, rs L
I' d
i VCublt-/9 t
h i
l g=;L- _
\\f E t<)
t] - A k.ll-/
u l;
dl i
p f,. f - g 60 C/11 C.D GJATFe S T o c ri f,2 Tdr'C k
}$h D ' Vi* w t*
l I
l e
l
, /:>rs??/ vJ c f 8.e. TS s'
is.,17 t' 6,; p l-p s y,
.* 'j;r i
- --L x
u,,,-,,= c, ~
z Ie>
cs > cp rt Pius s
s 700') DA T h t) g_
\\
/
/
~
i i
I k
i
\\
~~*"*em OUl*fi f ( h fy{y p
an===**
b O. o.*f /. r
- Cr {<,* 7,* %
lAt i1l' blie '.;
(,//J*F (L
\\
'~
sQ gj 7*
~ *mm. &
/
- n-YIe w I
- I 'o u ',
bs w, e og,,,, g u,,atre 57si.<,e b Sy,
- p. 3
MEETit!G SUMMRY DiSTRIBUTIO!
Docket file G. Lea r tlRC POR V. tioonan Local PDR S. Pawlicki TIC /t: SIC / Tera V. llenaraya flRR Reading Z. Rosztoczy LBil 3 Reading W. Ifaass
- 11. Denton D. Iluller E. Case R. Ballard D. Eisenhut W. Regan R. Purple D. Ross D. J. Youngblood P. Check A. Schwencer R. Satterfield F. Miraglia
- 0. Parr J. Miller F. Rosa G. Lainas W. Butler R. Vollmer W. Kreger J. P. Knight R. Ilouston R. Bosnak T. Murphy F. Schauer L. Rubenstein R. E. Jackson T. Speis Project Manager D. Hood to W. Johnston N
g Attorney, OELD J. Stolz O
J. Lee S. Ilanauer
/fl' [,g ole (3)
W. Cammill 2-l'r ACRS (16)
'81788
'8I T. Murley Z
4i, A"'/g /
R. Tedesco F. Schroeder
-t
\\A D. Skovholt s
N. Ern.t Q
g NRC Particinants:
R. I:acr
't /g:
C. lierl iiger D
J. Kane K. Kniel G. Knighton A. lhadani D. Tondi J. Kramer D. '.%sallo P. Collins D. Ziemann bcc: