ML20046A163

From kanterella
Jump to navigation Jump to search
Forwards Amend 30 to Proprietary Foldout Drawings to GE ABWR Ssar,Chapter 7, Instrumentation & Control Sys, Revising Section 7.2,7.3 & 7.7
ML20046A163
Person / Time
Site: 05200001
Issue date: 07/08/1993
From: Robare D
GENERAL ELECTRIC CO.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML19310D528 List:
References
MFN-110-93, NUDOCS 9307270041
Download: ML20046A163 (1)


Text

)

GENuclear Energy Gecem!Decinc Comyn 175 Cunner Awwe, $an Jo:e CA 951?S July 8,1993 MFN No.110-93 Docket No. STN 52-001 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Richard Borchardt, Acting Director Standardization Project Directorate

Subject:

Submittal of Amendment 30, Proprietary 11x17 Foldout Drawings, to GE's ABWR SSAR

Reference:

Submittal of Amendment 30 to GE's ABWR SSAR, MFN 107-93, dated July 8,1993 Enclosed are thirty-four copies of selected sections of Chapter 7,1nstrumentation and ContmlSystems, of the Standard Safety Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR).

Revisions for 11x17 foldout drawings are being submitted for the following sections: 7.2,7.3,7.7 and they are identified on the attached Page Change Instruction (s).

Changes to the sections contain information that is designated as General Electric Company proprietary information. These pages are primarily corrections or additions to earlier proprietary submittals and the proprietary affidavits under which they were originally issued are applicable to these pages.

Sincerely, Q.CM D. J. Robare, Acting Manager Safety & Licensing MC-444, (408)925-6948 cc: R. C. Berglund (GE)

T. E. Murley (NRC)

D. M. Crutchfield (NRC)

D. J. McGoff (DOE)

F. J. Miraglia, Jr. (NRC)

C. Poslusny, Jr.

K. E. Stahlkopf (NRC) p (EPRI) , o N. D. Fletcher (DOE) f F. A. Ross (DOE) , 0 2700 ",.o #m L TRRK 9M1 9307270041 930709 PDR ADOCK 05200001 Q b

A PDR gf c