ML20044B207
From kanterella
Jump to navigation
Jump to search
ML20044B207 | |
Person / Time | |
---|---|
Site: | Rancho Seco |
Issue date: | 07/31/1990 |
From: | SACRAMENTO MUNICIPAL UTILITY DISTRICT |
To: | |
Shared Package | |
ML20044B205 | List: |
References | |
DECOMIR-90-0194, DECOMIR-90-194, NUDOCS 9007180107 | |
Download: ML20044B207 (56) | |
Similar Documents at Rancho Seco | |
---|---|
Category:DECOMMISSIONING PLANS
MONTHYEARML20138L1231996-11-13013 November 1996
[Table view]Smud Rancho Seco Incremental Decommissioning Action Plan, Rev 0,961113 ML20035C1151993-03-12012 March 1993 Draft Suppl to Initial Study & Negative Declaration:Rancho Seco Nuclear Generating Station Decommissioning Plan ML20044B2071990-07-31031 July 1990 Rev 0 to Plan for Ultimate Disposition of Ranch Seco Nuclear Generating Station 1996-11-13 Category:TEXT-SAFETY REPORT MONTHYEARML20211H7921999-08-13013 August 1999
[Table view]Safety Evaluation Supporting Amend 126 to License DPR-54 ML20195D1901999-05-0606 May 1999 Annual Rept ML20195H8571998-12-31031 December 1998 1998 Annual Rept for Smud. with ML20155D4801998-10-27027 October 1998 Amend 3 to Rancho Seco DSAR, Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode ML20248C4301998-05-0606 May 1998 Annual Rept, Covering Period 970507-980506 ML20249A7831997-12-31031 December 1997 1997 Smud Annual Rept ML20198G8271997-08-22022 August 1997 Safety Evaluation Supporting Amend 125 to License DPR-54 ML20217D3271997-07-30030 July 1997 Update of 1995 Decommissioning Evaluation for Rancho Seco Nuclear Generating Station ML20140A6371997-05-0606 May 1997 Annual Rept, Covering Period 960507-970506 ML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20137W8151997-03-20020 March 1997 Amend 1 to Post Shutdown Decommissioning Activities Rept ML20141J2711996-12-31031 December 1996 Smud 1996 Annual Rept ML20138L1231996-11-13013 November 1996 Smud Rancho Seco Incremental Decommissioning Action Plan, Rev 0,961113 ML20129E7151996-10-14014 October 1996 Defueled SAR for Rancho Seco ML20029D3561994-03-31031 March 1994 Update of 1991 Decommissioning Cost for Rancho Seco Nuclear Generating Station ML20059H6821994-01-17017 January 1994 Revised Rancho Seco Quality Manual ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20045H1071993-07-0909 July 1993 Part 21 Rept (Amend 2 to Enterprise Rept 159) Re Potential Defect in Power Cylinder Liner,Clarifying Recommended Corrective Action Delineated in .Replacement of Loose Fit Liners Will Eliminate Need for Further Insps ML20045B9051993-06-16016 June 1993 Safety Evaluation Re Order Approving Decommissioning Plan & Authorizing Decommissioning of Rsngs,Unit 1,SMUD.Concludes That Reasonable Assurance That Health & Safety of Public Will Not Be Endangered by Decommissioning Option,Provided ML20036C0081993-05-28028 May 1993 Informs Commission of Status of Open Issues & Progress of Specified Facilities Toward Decommissioning ML20059K1981993-05-0606 May 1993 Annual Rept, Covering Period from 920501- 930506,consisting of Shutdown Statistics,Narrative Summary of Shutdown Experience & Tabulations of Facility Changes, Tests & Experiments,Per 10CFR50.59(b) ML20035E4861993-04-0707 April 1993 Part 21 Rept Re K-400 Circuit Breaker Failed to Meet Certain Rating Requirements Based on ANSI C37.16.Licensees Scheduled Tests on Modified Arc Chutes in Several Different Modes at KEMA-Powertest Lab in Chalfont,Pa ML20035C1151993-03-12012 March 1993 Draft Suppl to Initial Study & Negative Declaration:Rancho Seco Nuclear Generating Station Decommissioning Plan ML20034F7031993-02-25025 February 1993 Amend 1 to Enterprise Rept 162 Re Defect on Starting Air Distributor Housing Assembly,As Followup to 930115 Final Rept.Addl Listed Part Numbers Discovered Which Are Higher Level Assemblies of Housing ML20128C9641993-02-0202 February 1993 Informs Commission of Status of Open Issues & Progress of Specified Facilities Toward Decommissioning ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20036C0601992-12-31031 December 1992 1992 Annual Rept for Smud ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML13316A1381992-11-25025 November 1992 Part 21 Rept Re Potential Problem W/Cylinder Heads Cast Prior to 840801 in Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Caused by Inadequate Casting Wall Thickness at Tapped Hole.Oil Analysis Should Be Performed Monthly ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20126E6771992-08-0303 August 1992 Rev 7 to Rancho Seco Quality Manual ML13316A0841992-01-15015 January 1992 Part 21 Rept 159 Re Potential Defect in Power Cylinder Liner in Diesel Engine of DSR-48 & DSRV-16-4 Standby Diesel Generator Sys.Investigation Continuing & Expected to Be Complete on 920301 ML13316A0791991-06-19019 June 1991 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generator Sys Involving Intake & Exhaust Power Valve Springs Mfg by Associated Spring.Recommends That Springs Be Inspected on Periodic Basis ML20029A7511991-02-28028 February 1991 Suppl to Special Rept 90-13:on 901224,25,29 & 910113,listed Meteorological Instrumentation Inoperable for More than 7 Days.Work Request Initiated & Instrumentation Channels Declared Operable on 910116 ML20029B6721991-02-22022 February 1991 Safety Evaluation Supporting Proposed Rev to Emergency Plan & Granting Exemption from 10CFR50-54(q) Requirements NL-90-451, Monthly Operating Rept for Oct 1990 for Rancho Seco Nuclear Generating Station1990-10-31031 October 1990 Monthly Operating Rept for Oct 1990 for Rancho Seco Nuclear Generating Station ML17348B5061990-10-0909 October 1990 Part 21 Rept Re Zener Diode VR2 on Power Supply Board 9 1682 00 106 Possibly Being Installed Backwards ML20059G9621990-09-10010 September 1990 Safety Evaluation Supporting Amend 115 to License DPR-54 NL-90-443, Monthly Operating Rept for Aug 1990 for Rancho Seco1990-08-31031 August 1990 Monthly Operating Rept for Aug 1990 for Rancho Seco ML20217A5711990-08-28028 August 1990 Final Engineering Rept,Assessment of Spent Fuel Pool Liner Leakage ML20044B2071990-07-31031 July 1990 Rev 0 to Plan for Ultimate Disposition of Ranch Seco Nuclear Generating Station NL-90-439, Monthly Operating Rept for Jul 1990 for Rancho Seco Nuclear Generating Station1990-07-31031 July 1990 Monthly Operating Rept for Jul 1990 for Rancho Seco Nuclear Generating Station 05000312/LER-1990-002, :on 900614,Step 6.9.3.1 of Liquid Waste Discharge Permit Checked R-15017A as Inoperable & Two Independent Samples Not Performed.Caused by Personnel Error. Caution Will Be Added to Step 6.9.21990-07-20020 July 1990
ML13316A0631990-07-19019 July 1990 Part 21 Rept Re Potential Problem W/Starting Air Admission Valve in Starting Air Sys.Caused by Air Start Piston Sticking in Air Start Valve Cap.Recommendations for Corrective Actions Forthcoming ML20055F8591990-07-16016 July 1990 Special Rept 90-11:on 900613,06,25,18,21 & 28,fire Barriers Breached More than 7 Days & Not Made Operable in 14 Days. Corrective Actions:Operability of Fire Detectors Verified on One Side of Breached Barriers NL-90-423, Monthly Operating Rept for June 1990 for Rancho Seco Nuclear Generating Station1990-06-30030 June 1990 Monthly Operating Rept for June 1990 for Rancho Seco Nuclear Generating Station ML20043H8661990-06-12012 June 1990 Special Rept 90-10 Re Fire Barriers in Auxiliary & Turbine Bldgs Which Became Inoperable & Not Returned to Svc within 7 Days as Required by Tech Spec 3.14.6.2.Operability of Fire Detectors Verified & Hourly Fire Watches Established NL-90-355, Monthly Operating Rept for May 1990 for Rancho Seco Nuclear Plant1990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Rancho Seco Nuclear Plant 1999-08-13 |