Part 21 Rept Re K-400 Circuit Breaker Failed to Meet Certain Rating Requirements Based on ANSI C37.16.Licensees Scheduled Tests on Modified Arc Chutes in Several Different Modes at KEMA-Powertest Lab in Chalfont,Pa
ML20035E486
Person / Time
Site: Millstone, Monticello, Davis Besse, Peach Bottom, Nine Mile Point, Palisades, Perry, Fermi, Harris, Saint Lucie, Grand Gulf, Arkansas Nuclear, Susquehanna, Prairie Island, Columbia, Seabrook, Brunswick, Limerick, Turkey Point, River Bend, Vermont Yankee, Duane Arnold, South Texas, Cook, Rancho Seco, Zimmer, Fort Saint Vrain, 05000468, Shoreham, Trojan, 05000512, 05000469  NextEra Energy icon.png
Issue date: 04/07/1993
From: Jackson A, Reffert B
ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-93 NUDOCS 9304160080
Download: ML20035E486 (9)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ -

ABB

~

ASEA BROWN BOVERI 4/7/93 Document Control Desk US Nuclear Regulatory Commission Washington,D. C. 20555 Gentlemen, ABB Power Distribution Circuit Breaker Division has determined in recent testing that the K-4000 Circuit Breaker has failed to meet certain rating requirements based on ANSI C37.16. The attached Record of Evaluation for 10CFR Part 21, provided to the NRC January 15,1993, details specific performance values with referencu :a C37.50.

For any K-400 circuit breaker in nuclear applications, ABB Circuit Breaker Division recommends the following course of action:

1. Customer application engir.eering should review the application of any K-4000 circuit breaker.
2. If the available fault current is less than 65kA no action is required.
3. If the available fault current is greater than 65kA and the system configuration is one listed in item #3 of the attached Part 21 evaluation, the customer should contact ABB Circuit Breaker Division. Contact is Mr. John Saleeby, telephone 803-665-4144 x373 in the Marketing Department.

Sincerely, f

Aubrey Jackson Quality Assurance Manager Al Bill Reffen General Manager cc:

Nuclear Distribution List Wendell Jones, ABB CBD Florence, SC

/ hI

[P ADOCK-O SO ABB Power. Distribution

/

1

.,.e pm ABB Power T & D Company Teteranone Teefac Swnchgear Systems Dnnsion 407 323-8220 407 322-8934 -

201 Hickrren Drive Sanford. FL327718201

~

A 3R BD f%B959 ASEA BROWN BOVERI RECORD OF EVALUATION FOR CFR21 Product: ABB K-4000 Circuit Breaker

1) Description of Deficiency ABB type K-4000 circuit breaker does not meet all requirements of rating based on ANSI C37.16, Table 1, as tested per C37.50, Table 3, tests 4, 5, and 6.

Tests 4 and 5 show satisfactory performance at 65kA and test 6 shows satisfactory performance at 8EkA.

2) Location /Date Testing was performed at the KEMA-Powertest laboratory in Chalfont, PA in November,1992. Manufacturing is in the ABB Power Distribution Circuit Breaker Division plant in Florence, SC.
3) Analysis of Safety Imolication i

in applications where rated maximum voltage may appear across a single circuit breaker pole, the arc may not be extinguished as the circuit breeker is opening.

Some examples of applications wherein this may occur are as follows:

a) Un-grounded delta source with two unintentional grounds; one on the source side of a breaker pole and one on the load side of a different pole j

(Figure 1).

I b) Corner-grounded delta source with an unintentional ground on the load side of the pole of either un-grounded phase (Figure 2).

1 ABB POWER DISTRIBUTION Circuit Breaker DMaion -

TELEFAX 1-06 & MECHANICSVILLE HIGHWAY.

(803)667-5109 P.O. BOX 100524 (803)8644520 FLORENCE. S.C. 29501 0524 UJiA.

y r

--~2m t

i i

l A st RD 1% BRED

r. E. BAOWN BOVE W t

4 l

.l i

I

'a.

f i

l

-m x--

i

. m. s._

4 r

l Figure 1 Figure 2 q

i 2

j c) Un-grounded Y source with two unintentional grounds; one on the source l

side of a breaker pole and one on the load side of a different pole (Figure 3).

]

d) Single phase source with intentional or unintentional ground on source side l

of one breaker pole and unintentional ground on load side of the other i

breaker pole (Figure 4).

l l

i j

j4 r

i 4

t

__...,._.4 g

4..

Figure 3 Figure 1 j

l t__.__-

_.2.

i

4) Steps to be Considered in tne Evaluation and Personnel Assioned a) Analysis: Analysis consists of examination of arc chutes and contact.

i structures returned from the KEMA-Powertest laboratory following

-I 1

unsuccessful tests. Known principles of arc interruption and engineering j

judgment are being combined to improve the performance sufficiently to l

rneet the ANSI ratings.

b) Calculations: N/A c) -Tests: ~ Full range of interrupting tests listed in 1) above will be made after

~

A !D RD 1%D959

- x:, u.: a w arc chute modifications have been made.

d) Trip to Jo.

N/A because no failures of the nature being reported herein have beet

. municated.

e) RGA: None required at this time.

f) inspection Factory / Field: Application hould be examined when the K-4000 circuit breaker is used in the field. If any of the applications described in section 3) above exist, modifications should be made in accorcance with ABB findings.

Personnel Assigned:

Gregory Grote - Product Development Engineer Kevin Warne - Designer Robert McMaster - Consultant

5) Documents or Drawinas Requirina Chance Only change now contemplated is to replace a total of (5) five arc chute parts with parts described in (5) five new drawings.
6) Reference Documents American National Standards Institute standards as follows: ANSI C37.13, ANSI C37.16, ANSI C37.50
7) Corrective Action ABB has scheduled tests on the modified arc chutes in several different modes at the KEMA-Powertest laboratory in Chalfont, PA. Tests will be conducted in early February,1993.
8) Action to Prevent Recurrence Put successfully tested new design into production via standard er.gineering release system for revised parts and assemblies.
9) Conclusions a) If a particular application does not allow the conditions described in section3) above, there is no safety hazard.

i

[

~ - - -.L -

,O, i

E A B AO'.'* N E C. E;-

i b) Regardless of the transformer cor ctions in a particular application, a three f

phase transformer rated at 25'

' < A or less with 480 Volts secondary will i

i not produce the t fety hazard. This is because the available current will not l

exceed the c " tent for v/hich we have succecsiu! tests per section 1) above.

i

%e foll%.ng calculebons supports this conclusion:

kVA = 2500 Assumed transformer impedance (Z) = 5.75%

i Secondary Voltage = 480 VAC Assume 100% motor load contributing 4x transformer full load current to the j

magnitude of available current Full load transformer current, let = (kVA x 1000) / (E x 3%)

= 3007 Amperes Available current from transformer, IAT * !FL / Per unit Z

= 3007 /.0575 = 52,300 Amperes i

Motor contribution current, Mc = 4 x let

= 12,028 Amperes Total available current ly = IAT + Mc

= 64,350 Amperes i

(The above conservatively assumes an unlimited primary capacity )

)

f

.hb YW W. P. Gibson Vice President, General Manager h

e-.

Bill Bodk j

Engineering Man er

/

\\senp611 Jon Quality As rance Manager

,*AB3 Cansde

  • Arizon2 Public Sar. Co.
  • Arizenn Nucionr

'M.

Storritt, Mgr.

W. E.

Ida Pcwer Project Engineering Mail Station 4072 A. E. Ettinger, Mgr.

2401 Dixie Road Nuclear Pwr. Project Purchasing & Contracts Mississauga, Ontario P.O. Box 52034 Mail Station 6975 L47 2A3 Phoenix, AZ 85072 P.O. Box 52034 Phoenix, AZ 85072

. Arizona Public Service

. Baltimore Gas & Elec.

. Carolina Pwr. & Light Supervisor DCC W. J. Lippold, Mgr.

Mgr.-Nuclear Licensing Mail Station 6755 Nuclear Eng. Services P.O. Box 1551 P.O. Box 52034 B. G. & E.

Bldg.

Raleigh, NC 27602 Phoenix, AZ 85072 P.O. Box 1475 Baltimore, MD 21203

. Carolina Pwr. & Light

. Carolina Pwr. & Light

. Cincinnati Gas & Elec.

Dept. Manager Dept. Manager A. P.

Haskell, Mgr.

Harris Nuclear Project Brunswick Nuclear Proj.

General Eng. Dept.

l Box 165 Box 10429 Zimmer

['

N3w Hill, NC 27562 Southport, NC 28461 P.O.

Box 960 Cincinnati, OH 45201 g s

  • Uleveland 2iec. Illum.

. Commonwealth Edison Co.

Consumers Power Co.

E.

E. Riley C. Reed, V.P., Nuclear

" ic;nc ir; !" a;;ter Director Nuclear QA P.O. Box 767 Palisades Nuclear Plant Porry Nuclear Plant Chicago, IL 60690 N

i 10 Center Road 5=ek=aa - WT 'a'al Parry, OH 44081 1

  • Datroit Edison Co.

Duke Power Company

. Duke Power Company R.

Bryer, 110 TAC W. T. Robertson R.L. Gill, Ngr.

Farmi 2 Energy Center President Nuclear Licensing 6400 N. Dixie Hwy.

Mill-Power Supply Co.

Mill-Power Supply Co.

Nawport, MI 48166 P.O. Box 32307 P40. Box 32307 Charlotte, NC 28232 Charlotte, NC 28232

  • Duquesne Light Co.

Duquesne Light Co.

Laguna Verde R. J. Swiderski H. M. Siegel M. Brooks P.O. Box 4 P.O. Box 4 Duite 240 Shippingport, PA Shippingport, PA 2400 Veterans Blvd.

15077 15077 Kenner, LA 70062

  • Entergy Operations

. Entergy Operations

.Entergy Operations Manager, Industry Supervisor Engineering C.

W.

Angle Ev3nts Analysis Databases Grand Gulf Arkansas Nuclear One Arkansan Nuclear One P.O. Box 429 Station Route 3, Box 137G Port Gibson, MS 39150 Route 3, Box 137G Russellville, LA 72801 Russellville, LA 72801

((

]

.Florido Power Corp.

.Florld3 Pwr. & Light

. Florida Pwr

& Light I

'Mgr. of Nuclear ManSgar of QA Sito Purchasing Supv.

Eng. Ass,urance C21 Services St. Lucie Nuclear Plant i

P.O. Box 14042 P.O. Box 14000 P.O. Box 12000 St. Petersburg, FL West Palm Beach, FL Jensen Beach, FL 34958 33733 33408 l

. Florida Pwr. & Light Georgia Power Company

Len Gucwa G. Bockhold, Jr.

Turkey Point Nuclear Nuclear Operations Dept.

Project V.P.

& Gen. Mg2 1

Plant Procurement Review Sec.

Nuclear Operations P.O. Box 3088 P.O. Box 4545 Route 2, Box 299A Florida City, FL 33034 Atlanta, GA 30302 Waynesboro, GA 30830 i

l GPU Nuclear Corporation

. Gulf States Utilities

. Stone & Webster Engrg.

J. L. Fullivan 4BF N Director D. Larry, Project Hgr.

Director of Licensing Nulcear Plant Engrg.

Riverbend Station j

Ono Upper Pond Road Riverbend Nuclear Sta.

Highway 61 Persippany, NJ 07054 P.O. Box 220 St. Francisville, LA St. Francisville, LA 70775 l

70775

%wo %. Cn s2 M A H Illinois Power Compnay

. Indiana & Michigan Elec.

AEP Service Company F. Spangenberg W. G. Smith, Plant Supt.

M. P. Alexich.

i (V920) Mgr. of Licensing D.C. Cook Plant VP Nuclear Operations P.O. Box 678 P.O. Box 458 One Riverside Plaza Clinton, IL 61727 Bridgeman, MI'49106 P.O. Box 16631 Columbus, OH 43216

. American Elec. Pwr. Ser.

. Iowa Elec. Light & Pwr.

. Iowa Elec. Light & Pwr J. R. Anderson Mgr., Nuclear Licensing Dept. Commitment and i

Ccgnizant Engineer Duane Arnold Energy Ctr.

Control, 14th Floor Ona Riverside Plaza P.O.

351 Duane Arnold Energy Ct2 l Columbus, OH 43215 Cedar Rapids, IA 52400 P.O.

351 i

Cedar Rapids, IA 52400 j

.Long Island Lighting

. Niagara Mohawk Pwr.

. Niagara Mohawk Pwr.

J. A. Notaro, Mgr. QA C. V. Mangan, V.P.

S. W.

Wilczek, Mgr.

Shoreham Nuclear Nuclear Engineering Nuclear Technology Power Plant Nine Mile Point 2 301 Plainfield Road P.O. Box 618 300' Erie Blvd., West Syracuse, NY 13212 W: ding River, NY 11792 Syracuse, NY 13202

. Northeast Utilities

. Northeast Utilities

. Northeast Utilities R. P.

Werner, V.P.

Supv. Procurement QA E. J. Mroczka, V.P.

Cngrg. & Construct.

Connecticut Yankee Nuclear Operations Millstone 3 P.O. Dox 270 P.O. Box 270 P.O.

Box 270 Hartford, CT 06141 Hartford, CT 06141 Hartford, CT 06141

4

. North 2rn States Power

. North 3rn Statoo Pcwer

. PA Power & Light W

Sh0nlo, Plant Mgr.

E. Catzl, Plant Mgr.

T. Tier MDnticello Plant Prairie Island Plant Susquehanna Old' Highway 152 R. R. 2 P.O. Box 467 Monticello, MN 55362 Welch, MN 55089 Berwick, PA 18603 Philadelphia Elec. Co.

l

. Philadelphia Elec. Co.

. Philadelphia Elec. Co.

P. K. Pavlides, Dir.

R. H. Moore, M.C. S7-3 Plant Manager Q. A. Eng. & Res.

Dir. O.A. Elec. Prod.

Peach Botton Atcric M.C. S23-2 2301 Market Street Power Station 2301 Market Street Philadelphia, PA 19101 R. D. 1. Box 208 1'

Philadelphia, PA 19101 Delta, PA 17314 i

  • Philadelphia Elec. Co.

Portland Gen. Elec.-Co.

.Public Ser. of Coloradc G. M. Leitch, Plant Mgr.

A. N. Roller-L. Bray,- Mgr.

{

Limerick Nuclear Plant Eng.

Fuel & Licensing Cvargreen-& Sanatoga Roads Trojan Nuclear Pwr. Plant Ft. St. Vrain P.O. Box A 121 SW Solomon St., SB-1 2420 W. 26th Avenue Sanatoga, PA 19464 Portland, OR 97204 Denver, CO 80211 i

f

)

=Public ser. of Indiana

.Public Ser..of New Yankee' Atomic Elec.

Quality Assurance Hampshire, Seabrook Vendor QA

[

j Marble Hill Nuclear B.

B. Beckley P.O. Box 8000 j

1000 Elm Street Bolton, MA 01740 i

i [ Generating Station

{

P.O. Box 190 Manchester, NH 03105 l

j Now Washington, IN 47162 5-

  • UnitcJ Eng. & Construct.

b[PublicSer.ofNew PSE4G Nuclear Dept.

~

a j.

Dr. A. M. Ebne r Hampshire, Yankee Div.

D. A. Perkins, Mgr.

Project Manager G. 5. Thomas Procurement QA i

P.O. Box 8223 Technical Support Dept.

Mail Code N-14 i

Philadelphia, PA 19101 P.O. Box 300 P.O. Box 236 i

Seabrook, NH 03874 Hancocks Bridge. NJ 08030 j

1

  • SMUD/ Rancho Seco

.SMUD/ Rancho Seco

  • So. Carolina E & G j

G. Coward, Plant Mgr.

8. Crunk, Licensing Mgr.

A. R. Koon, Mgr.

Nuclear Generating Sta.

Nuclear Generating Sta.

Nuclear Licensing 1

14440 Twin cities Road 14440 Twin Cities Road P.O. Box 88/613 Harald, CA 95638 Herald, CA 95638 Jenkinsville, SC 29065 v'<80. Calif. Edison Co.

  • Bechtel Energy Corp.

. Houston Light. & Pwr.

R. M. Rosenblum A. Natiuk, Eng. Mgr.

E.

Dotson, Eng. Mgr.

Mgr. of QA South Texas Project South Texas Project P.O. Box 700 P.O. Box 2166 P.O. Box 1103 Ro0emead, CA 91770 Houston, TX 77001 Houston, TX 77251

Tonnaccao Valloy Auth.

.Tann3cceo Valloy Auth.

. SPD. ?echnologios J. Silvario Dir. Of Purchasing W.

8. Rcughley 130 Keystone Drive Div. of Purchasing Dept.

Chief Elec. Engineer Montgomeryville, Pa 1000 Commerce Union W8C 126 C-K

~

18936 Bank Building 400 W.

Summit 11111 7th & Chestnut Streets Knoxville, TN 37902 Chattanooga, TN 37401 Texas Util. Generating Co.

. Texas Util. Gen. Co.

.Tannessee Valley Auth.

F.

Campbell W.

G. Counsil Site Quality Cont. Mgr.

Lookout Place SS 116D Exec. V.P. Nuclear QA Dept.

Chsttanooga, TN 37401 Engrg. 4 Operations P.O.

Box 1002 400 N. Olive St., LB 81 Glen Rose, TX 76043 Dallas, Tx 75201 Virginia Elec. & Pwr. Co.

. Wisconsin Elec. Pwr, Cc !

  • Toledo Edison Co.

Mgr. Nuclear Licensing M. L. Bowling, Mgr.

A. 2. Puszatai, Project D. Besse Nuclear Plant Nuclear Licensing Spec.-Audits & Surveys 300 Madison Avenue P.O. Box 26666 P.O. Box 2046 Toledo, OH 43652 Richmond, VA 23261 Milwaukee, WI 53201 i

ABB Power T & D Cn, GRAND' GULF NUCLEAR STATION

.W32hington Public Pwr.

Supply System Kingston Chi M. J. MEISNER A. Hausler, Mgr.

Kuosheng Nuclear Plant DIR. NUCLEAR SAFETY AND l

Corp. Nuclear Safety Suite 400 REGULATORY AFFAIRS l

l 3000 Geo. Washington Way 1850 Mt. Diablo Blvd.

P.O. BOX 756 l

Richland, WA 99352 Walnut Creek, CA 94596 PORT GIBSON, MS 39150 NORTHEASR UTILITIES SER. CO.

NORTHEAST UTILITIES SER. CO.

SCRTHEAST UTILITIES SER. CC RICHARD P. WERNER, VP ED J. MROCZKA, VP SUPERVISOR PROCURE. QA ENGRG. & CONST.

NUCLEAR OPERATIONS CONNECTICUT YANKEE P.O. BOX 270 P.O. BOX 270 P.O. BOX 270 i

HARTFORD, CT 06141 HARTFORD, CT 06141 HARTFORD, CT 06141 i

CONSUMERS POWER CO.

VIRGINIA POWER OPERATING EXPERIENCE COORD.

PALISADES NUCLEAR PLANT INSBRUCK TECH. CENTER 15W VT YANKEE NUCLEAR PWR CORP. I 27780 BLUE STAR HWY.

G. C. CLARK P.O. BOX 157 I

COVERT, MI 49043 5000 DOMINION BLVD.

VERNON, VT 05354 J. D. ALDERINK GLEN ALLEN, VA 23060 DUKE POWER.CO.

SAFETY ASSURANCE MGR.

MORRIS SAMPLE (EC05N)

P.O. BOX 1006 CHARLOTTE, NC 28201 l

l I