LER 90-015-00:on 900415,ESF Signal Actuation for Containment Ventilation Isolation Occurred.Caused by Procedural Inadequacy.Setpoint Setting Modified & Detector Time Constant Extended from 20 to 40 s.W/900515 Ltr
ML20043A471
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/15/1990
From: Miller L, Pollack M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-90-015, LER-90-15, NUDOCS 9005220110
Download: ML20043A471 (6)


Text

'

O PSEG Public Shrvice Electric and Gas Company P.O. Box 236 Hancocks Br dge, New Jersey 08038 Salem Generating Stat' ion I

May 15, 1990 U. S. Nuclear Regulatory Commission Document' Control Desk Washington, DC 20555

Dear. Sir:

4 1 SALEM GENERATING STATION ,

LICENSE NO. DPR-75 DOCKET NO. 50-311 ,

UNIT NO. 2 .

LICENSEE EVENT REPORT 90-015-00

I

.1 This Licensee Event Report is being' submitted pursuant to the i requirements of the Code of Federal Regulations 10CFR'.

50.73(a)(2)(iv). This-report is required within-thirty (30) days of. discovery.

Sincerely yours, L. K. Miller i,

General Manager -

,7 Salem Operations

.MJP:pc r Distribution

'I

, m.

t $.

9oos2g((Q$$$$o$1i PDR PDC

5. /

_ @, /, ,j The Energy People 41 j

' 95-2186(5M)12 88

]

i

F 1 I

=ac e sm ut aucu Aa neevtAtoav - '

Ap.9tovt0 one aso. sim.es)

LICENSEE EVENT REPORT (LER) """""'** l I

. A. <,tv n. .oune.u .. - >

ta1== nan =ratina Station-Unit 2 tittl 646 0l5l0l0l0l2lii1 1 l0Fl 015 BSF Signal Actuations Containment Ventilation Isolation eveert oAtt

  • un wunmen a mepoat oAte sti otwan eAcismee wevotvto ei teDNTM DAY YtAR VIAR 0,

, M n'4 $$ WomtM Day vsAR '* C. Liv, esan.as DOCatt seveestate 0151010101 I l

~ ~

O! 4 1 !5 9 0 9l 0 0 l 1l 5 0l 0 0l5 1l5 9h 0l$gol0 0g l l i

, , , , , , tuit assomt e eventreo evneuant to twa neovinementte oe se con I ren e = w a er sne sm w nu ponen

'""' 6 se anni se esow 'x so.tswmHw ts.timi m asswnno se sswm so.tswmM ts.ttw

'E' 01 OJO

~

m answmm seawm es.tswones

~

ofwea iss-n, = Aa ,

p(p M 4EsteH1HW) es.tNeHtHa es.tstelWHvWHA)

& 1. f 'p

-wa nw se 4EommM

~"Sua se.thsH3HW -

="w="--

es.tstelWHs) t9Ctesse8 CONTACT P0m tMie t4R f1ti NAnet ttttPMoest NvMDem ARI A C004

.M._J. Pollack - I.ER Coordinator 61019 31319 l- l 21012 l 2 ,

ConsPttvt Ott' ttNE POA SACH Consp08stNt P AltVR4 DeschieGD IN tMe ROPOAv fist

^

CAUe4 SYSitM COMPONENT f "f0 PM 4 CAU$t SYttEM C0teP0hthe

[ "f0

\

l l I i 1 l l l l 1 l l #NNd

,. I l l l 1 l l l l l l l l l M@ m sMm

) __ _ eu umt= vat . 0at sweevio e .. ,,,,,,, uC=va3 oAv v Aa

~

~'"} Tes rorv.o.~ , avecreo svownson oArto *$70%"

Aan =Act ,o~, .. . . . ,.. , . .,. . ,v,

} no

..., n ei l l l On 4/15/90 at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />, the 2R12A (Containment Radioactive Noble Gas l Monitor) Radiation Monitoring System (RMS) channel alarmed. This resulted in an Engineered Safety Feature (ESP) signal actuation for Containment Purge / Pressure-Vacuum Relief System (CP/P-VRS) isolation.

After resetting the alarm, fifty-six (56) minutes later, the 2R12A channel alarmed again, resulting in another CP/P-VRS isolation signal.

The root cause of the detector response, which resulted in ESF actuation signals, has been attributed to procedural inadequacy. The Tech. Specs. require the 2R12A channel setpoint be set at i 2 times '

background (when in Mode 6). The setpoint adjustment procedure did not I.

address periodic background increases due to detecter response or changing radiological conditions in Containment. Since the initial 2R12A ESF actuation signals, an additional signal occurred on April 17, 1990 at 0458 hours0.0053 days <br />0.127 hours <br />7.572751e-4 weeks <br />1.74269e-4 months <br />. Also, due to detector response to fluctuating

! background conditions, two (2) 2R11A (Containment Radioactive Particulate Monitor) CP/P-VRS isolation signals occurred. The first occurred on April 15, 1990 at 2259 hours0.0261 days <br />0.628 hours <br />0.00374 weeks <br />8.595495e-4 months <br /> and the second occurred on April 20, 1990 at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br />. Review of the 2R12A and 2R11A setting'of the alarm setpoints has been completed. The setpoint is now defined using-the average background radiation levels from the past two (2) -

Unit 2 refueling outages. The appropriate procedural modifications have been completed. Also, the detector time constant has been extended from 20 to 40 seconds. This will " smooth" out the count rate

.cince a larger population of data will be averaged,

g. g, . -

1 I

LICENSEE EVENT. REPORT (LER) TEXT CONTINUATION-8 lem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 50,00311= 90-015-00 2 of 5 P_LANT AND SYSTEN IDENTIFICATIONE Nestinghouse - Pressurized Water Reactor Energy. Industry Identification System (EIIS) codes.are identified in the text as lxx)

IDENTIFICATION OF OCCURRENCE:

-Engineered Safety Feature = Actuation: Containment Purge / Pressure-Vacuum Relief System isolation signals due to detector response on the 2R12A and 2R11A channels 9

Event;Date: 4/15/90, 4/17/90, and 4/20/90 Report Date': 5/15/90 This-report was initiated by Incident Report Nos.90-256, 90-260,90-265, and 90-272.

CONDITIONS PRIOR TO OCCURRENCE:_

Node 6 (Refueling)' - 5t h Refueling Outage; Mode 6 had been entered at 0045 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> on April 15, 1990 DESCRIPTION OF OCCURRENCE:

'On April 15, 1990 at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />, the 2R12A (Containment Radioactive Noble Gas Monitor) Radiation Monitoring System (RMS) (ILI channel alarmed. This resulted in an Engineered Safety Feature (ESF) signal actuation for Containment Purge / Pressure-Vacuum' Relief System (CP/P-VRS) (BFI isolation. 'The channel war not declared inoperable since the cause of the ala,a was due to a~ low setting of its setpoint combined with fluctuating background levels. Fifty-six-(56) minutes later, the 2R12A channel alarmed again, resulting in another CP/P-VRS l isolation signal. Subsequently, the 2R12A channel was declared inoperable and Technical Specification Table-3.3-6 Action 26 was entered. Action 26 was exited'at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br /> on April 18, 1990 upon completion of resetting the alarm setpoint'(as per procedure >

2IC-4.4004, " Channel Setpoint Adjustment for Containment Background Compentation 2R11A, 2R12A"). The setpoint was adjusted on April 15, 1990;:however, the Action Statement-was not exited until it was determined that the channel was functioning correctly bascd upon an extended period of observation.

At the time of the 2R12A actuations, the reactor vessel head was not fully tensioned.- However, no abnormal increases in activity were identified by the various Containment area radiation monitors.

Technical Specification Table 3.3-6 Action 26 states.

"With the number of OPERABLE channels less than required by the Minimum Channels OPERABLE requirements, initiate the-preplanned i

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION

~ '

SOlem Generating Station DOCKET NUMBER LER NUMBER PAGE Mnil_2 50293_11 90-015-00 3 of 5 t

DESCRIPTION _OF OCCURREN_qE: (cont'dl alternate method of monitoring the appropriate parameter (s),

within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:

1) either restore the inoperable Channel (s) to OPERABLE status within 7 days of the event, or e
2) . prepare and submit a Special Report to the Commission pursuant to' Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the  ;

inoperability and the plans and schedule for restoring the system to OPERABLE status."

The Nuclear Regulatory Commission was notified of the actuation of the CP/P-VRS isolation signal in accordance with Code of Federal Regulations 10CF3 50.72 (b) (2) (ii) .

APPARENT CAUSE OF_OQCURRENCE:

The root cause of the detector cesponse, which resulted in ESF actuation signals, has been attributed to procedural-inadequacy. The Technical Specifications require the 2R12A channel setpoint be set at i 2 times background (when in Mode 6). Procedure 2IC-4.4.004, '

" Channel Setpoint Adjustment for Containment Background Ccmpensation 2R11A, 2R12A", required the recording of background readings over a ten (10) minute period. This requirement did not address, periodic increases due to detector response or changing radiological conditions in Containment. '

The 2R12A channel background had been varying between 40 and.80 counts per minute (cpm). At this low background, it is not uncommon for detector response signals to exceed the nominally set setpoint of 120 cpm. Also, during the course of a refueling outage various plant- ,

activities will cause increases in Containment' background radiation levels (e.g., reactor vessel head removal, Steam Generator mancay removal, and other various work activities). <

Due to detector response and the. changing plantuconditions additional CP/P-VRS actuations occurred despite frequent periodic review of background levels by Maintenance-I&C personnel. In addition to the April 15, 1990 2R12A actuation signals,'one occurred on April 17, 1990 at 0458 hours0.0053 days <br />0.127 hours <br />7.572751e-4 weeks <br />1.74269e-4 months <br />, Also, due to detector response to fluctuating background conditions, two (2) 2R11A (Containment Radioactive-Particulate Monitor) CP/P-VRS isolation signals occurred. The first actuation occurred on April 15,-1990 at 2259 houro and the second-occurred on April 20, 1990 at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br />. The 2R11A RMS channel background had been varying between 1000 and 1600 cpm. Its alarm petpoint in Mode'6 is also 1 2 times background.

After each ESF signal actuation the NRC was notified in~accordance with. Code of Federal Regulations 10CFR 50.72 (b) (2) (ii) . None of these additional actuations occurred during Containment purge or prescure-vacuum.rolief activities. The associated-valves remained in ,

their closed position.

i

, LICENSEE EVENT REPORT (LER) TEXT CONTINUATION SblemGeneratingStation DOCKET NUMBER LER NUMBER PAGE Unit 2 _ 5000311 90-011-00 4 of 5 MIALYSIS OF OCCURRENCE:

The 2R12A RMS channel monitor's the radioactive noble gas content of the Containment atmosphere. An alarm signal will cause the automatic isolation of the CP/P-VR System. The channel is used in Modes 1 l through 5 in the identification of Reactor Coolant System (ABl l leakage.in conjunction with the containment sump level monitoring I system, the containment fan cooler condensate flow rate monitors, and the containment radioactive particulate (2R11A) radiation monitoring system. In Mode 6, the 2R11A and 2R12A radiation monitors are used as indication of a fuel handling accident to provide early isolation ,

of the Containment in the event of an accident.

Air samples are pulled from the containment atmosphere through a

( filter paper which continuously moves past the 2R11A detector. The l air sample then passes through a charcoal cartridge (monitored by the l

2R12B monitor) and is then mixed into a fixed shielded volume where it is viewed by the 2R12A monitor. The air sample is then returned to the Containment.

Several area radiation monitors, are used to corroboraie-the 2R11A I and 2R12A channels indications. The corroborating aren radiation monitors do not have isolation capabilities; they only have alarm capability. None of these channels indicated any abnormal activity during this event.

The 2R41C Plant Vent Radioactive Noble Gas monitor is the Technical Specification accepted alternate method-of monitoring Containment activity. It corroborates the 2R12A channel indications when CP/P-VR '

valves are open. This monitor also has the capability of automatic isolation of the CP/P-VR System (as well as closure of the WG41 valve, " Gas Decay Tank Vent Control Valve"). It remained operable during the course of this event and did not indicate any abnormal Plant Vent activity.

The ESF actuations addressed by this LER were the result of the inappropriate setting of the 2R12A and 2R11A channels' alarm setpoints. They were not the result of abnormal Containuent activity as indicated by the corroborating RMS channels. Therefore, the events discussed in this LER did not affect the health or safety of the public. However, due to the automatic actuation of an ESF system, this event is reportable in accordance with Code of Federal Regulations 10CFR 50.73 (a) (2) (iv) .

CORRECTIVE ACTION:

Review of the 2R12A and 2R11A setting of the alarm setpoints has been completed. The setpoint is now defined using the average background radiation levels, in Containment, from the past two (2) Unit 2 refueling outages. The setpoint for the 2R12A channel is now 240 cpm and 6000 cpm for the'2R11A channel. The appropriate procedural modifications have been completed.

., LICENSEE EVENT REPORT-(LER) TEXT CONTINUATION

'~ Salem Generating Station. DOCKET NUMBER LER NUMBER PAGE  !

Unit 2 5000311 90-015-00 5:of 5 CORRECTIVE _hCTION: (cont'dl.

In addition to modification of the setpoint setting, the' detector .;

time constant has been extended.from.20 to 40 seconds.- This will  !

" smooth" out the count rate since a' larger population of. data will be  ;

averaged.