Other: 05000266/LER-1979-010-01, /01T-0 on 790620:plant Safeguards Actuation Circuitry Review Indicated Need for Circuitry Changes.Caused by Changes in IEEE Std Since Plant Design.Mods to Four Applicable Safeguard Circuits Will Be Performed, ML19210C482, ML19242D259, ML19253A712, ML19253B006, ML19257A367, ML19257B511, ML19289C679, ML19310A971, ML19323H481, ML19345H544, ML20010E141, ML20027A527, ML20038C635, ML20039A258, ML20040F029, ML20065R665
|
MONTHYEARML20027A5271978-11-28028 November 1978 Discusses Possible Dangers of LOCA in Containment Purging During Normal Plant Oper.Requests Either Commitment to Limit Purging or Justification for Continuing.W/Encl ANO 7812080207 Project stage: Other ML19289C6791979-01-16016 January 1979 Responds to Re Purging During Normal Operation. Need for Purging Has Been Limited,But It Is Essential That Capability of in-containment Activities at Power Be Maintained Project stage: Other 05000266/LER-1979-010-01, /01T-0 on 790620:plant Safeguards Actuation Circuitry Review Indicated Need for Circuitry Changes.Caused by Changes in IEEE Std Since Plant Design.Mods to Four Applicable Safeguard Circuits Will Be Performed1979-07-0303 July 1979 /01T-0 on 790620:plant Safeguards Actuation Circuitry Review Indicated Need for Circuitry Changes.Caused by Changes in IEEE Std Since Plant Design.Mods to Four Applicable Safeguard Circuits Will Be Performed Project stage: Other ML19253A7121979-08-0808 August 1979 Confirms Action Taken as Result of 790803 Telcon Re Util Request to Leave Containment Purge Values Closed Above Cold Shutdown Condition.Proposal Acceptable on one-time Basis Project stage: Other ML19242D2591979-08-10010 August 1979 Appreciates Prompt Approval of Request to Purge Containment. Approval Reduced Personnel Inconvenience & man-rem Exposure. Will Pursue Review of Containment Purge Sys Project stage: Other ML19253B0061979-09-0606 September 1979 Discusses Containment Purge Valve Operations.Notifies of Potential Mods to Ensure That Valves Will Close Against Containment Pressure Transients.Consultants Will Conduct Studies & Analyses of Potential Mods Project stage: Other ML19323H4811979-09-30030 September 1979 Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Point Beach Nuclear Power Station,Units 1 & 2 Project stage: Other ML19210C4821979-11-0101 November 1979 Responds to Re Guidelines for Operability of Containment Purging & Venting Valves During Normal Operations.Evaluation Will Consider Consultant Studies of Potential Mods to Valves Project stage: Other ML19257A3671979-11-19019 November 1979 Forwards Interim Position on Containment Purging & Venting During Normal Operation Pending Resolution of Isolation Valve Operability.Commitment to Comply W/Encl Position Should Be Submitted within 45 Days Project stage: Other ML19310A9711979-12-27027 December 1979 Requests Preliminary Evaluation of Licensee Response to NRC 791023 Interim Position for Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability, Generic Item B-24.Evaluation Form Encl Project stage: Other ML19257B5111980-01-0909 January 1980 Provides Commitments Sought in NRC .Forwards to Bechtel Re Purge Valve Capability Verification.Nrc Guidelines Will Be Considered During Evaluation of Mods for Improved Purge Valve Reliability Project stage: Other ML19257C8081980-01-11011 January 1980 Forwards Safety Evaluation to Be Substituted for Encl in Ltr Per Agreement Reached at 791213 Meeting Re Containment Purge Project stage: Approval ML19257C8101980-01-11011 January 1980 Safety Evaluation Approving Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation,Except Radiation Monitors Used to Initiate Containment Purge Isolation Project stage: Approval ML19323H4781980-05-22022 May 1980 Forwards Safety Evaluation Supporting Design Aspects of Containment Purge Valve Isolation Override & Other Engineered Safety Feature Actuation Signals Except Radiation Monitors Which Initiate Containment Purge Isolation Project stage: Approval ML19345H5441981-05-0707 May 1981 Documents Basis for Containment Isolation Pressure Setpoint Reported in Item II.E.4.2 of NUREG-0737 Response Per NRC 810414 Telcon.Present 5 Psig Setpoint Considered Realistic & Appropriate Project stage: Other ML20008F4471981-07-21021 July 1981 IE Info Notice 81-21, Potential Loss of Direct Access to Ultimate Heat Sink. Provides Addl Info to IE Bulletin 81-03 Project stage: Request ML20038C6351981-07-31031 July 1981 Srp,Revision 2 to Section 6.2.4, Containment Isolation Sys Project stage: Other ML20010E1411981-08-28028 August 1981 Proposed Tech Spec Revision Pages 15.3.6-2,15.3.6-3, 15.4.4-12,15.4.4-15 & 15.4.4-15a Re Testing of Containment Purge Supply & Exhaust Sys Isolation Valves Project stage: Other ML20010E1361981-08-28028 August 1981 Application for Amend to Licenses DPR-24 & DPR-27 Submitted as Tech Spec Change Request 68 to Incorporate Addl Restrictions Re Use & Testing of Containment Purge Supply & Exhaust Sys Isolation Valves,Per NRC Request Project stage: Request ML20033C0321981-11-23023 November 1981 Second Discovery Progress Rept for Period Ending 811122,per ASLB 811113 Memorandum Order.Licensee 811027 Responses to Wi Environ Decade 811023 Interrogatories Are Not Fully Responsive.Certificate of Svc Encl.Related Correspondence Project stage: Request ML20039B0181981-11-24024 November 1981 Requests That Util Remit Class III Fee for Unit 1 & Class I Fee for Unit 2 to Cover Review of 810828 Application for Tech Spec Changes Re Containment Purge Valve Operability Project stage: Approval ML20033A9071981-11-24024 November 1981 Advises of Significant Error in 811117 Telcon Transcript Project stage: Request ML20039A2581981-12-0707 December 1981 Requests That NRC Reconsider Requirement of Class III Approval Fee During Final Review Re Tech Spec Change Request 68.Changes to Tech Specs Result of NRC Request.No Approval Fee for Amend Review Necessary Project stage: Other ML20040F0291982-01-28028 January 1982 Proposed Tech Spec 15.3.6 Re Containment Purge Supply & Exhaust Valves Project stage: Other ML20040F0221982-01-28028 January 1982 Application for Amend to Licenses DPR-24 & DPR-27,consisting of Tech Spec Change Request 68 Re Containment Purge Valve Operability Project stage: Request ML20065R6651982-10-22022 October 1982 Provides Results of Confirmatory Analysis Demonstrating That Unacceptable Radioactive Release from Containment Would Not Take Place as Result of Small Break LOCA in Which Operator Action Required.Radioactive Release Negligible Project stage: Other 1980-01-11
[Table View] |
Text
_ _ _ _ _ _ _
r
%flSCOMSin }5f6M:ll' C eowm COMPAM l
231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 January 28, 1982
~
Mr.
H.
R.
Denton, Director N
D Office of Nuclear Reactor Regulation U.
S.
NUCLEAR REGULATORY COMMISSION sy Washington, D. C.
20555
[7
<0 0
1 Attention:
Mr.
R. A. Clark, Chief
- t,ij
.saz=~ $
\\
33
,y -
Operating Reactors, Branch 3 4
Of. #, ". R c'\\ c'l ei T N
Gentlemen:
O 6
j/';s s
k DOCKET NOS. 50-266 AND 50-301 MODIFICATION TO TECHNICAL SPECIFICATION CHANGE REQUEST NO. 68 CONTAINMENT PURGE VALVE OPERABILITY POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 On August 28, 1981, Wisconsin Electric Power Company submitted a license amendment request dealing with the operation and~ surveillance testing of the containment purge supply and exhaust isolation valves at our Point Beach Nuclear Plant, Units 1 and 2.
This submittal was in response to the Commission's letter of July 21, 1981.
By letter dated November 23, 1981, the NRC staff requested that we modify this amendment request to include the following additional commitments:
1.
The NRC has requested that in addition to maintaining these valves closed, except for the cold shut-down or refueling modes, we specify the valves to be locked closed.
We have, accordingly, modified the proposed Specification 15.3.6.c to require the valves to be locked closed except when in the cold shut-down or refueling modes.
The locking devices will be applied to the valve operator control switches in the control room and will prevent power from being supplied to the valve operator by physically restricting operation of the valve control switches.
2.
The NRC has requested that we verify that the containment purge supply and exhaust isolation valves are locked closed at least once every 31 days.
This requirement
$)3Y /
8202080216 820128 PDR ADOCK 05000266 P
PDR
y.('
m a *
,3 l, 3
_(
i\\
i s
- MrFH.?R.JDhnto'n-
'_. }
' January \\28$1982-has 'been.-includedhin Table' '15.' 4.1-2.
Thisiverification.
i
~
-k.w ll be1 accomplished'by: observation;of.the~ valve position r_,
indication' lights..
A's - these : lights -a're ' actuated > by-
~
limit:switchesEdirectly.off'the valve. operators,'this
' observation willeprovide a'. positive'.verificati6nsof the o
(l'%"..
..,..?' {.
[
valve; position.- ' '~
~~-
4 A
f
, i L3".
TheNRChas" requested.thatth'e' Technical.Specfih$t ns?
include' a commitmenti,.to., replace,the valve -seals'of "th' '
c
-'1 purge supply. and exhaust isola tion valves at regular, m
7 - $;
iin'tervals'in'a'ccordance with the manufactu'rer's rEcom-k i C \\;fM ')I ~
.cmendations..;Thev'alve.'sealm'anufacturer,forthesdalsused(*%(
at the Poi'n'tJBeach: Nuclear; Plant-has spdcifiedTno specifid I
'?
' interval;for' periodic seal replacement. ITherdfone,iwe -i '. V -
have. proposed no specification for replacement.'at regular
[(4}t N
7 intervals.'
SealsLare'to be replaced:when excessiv,e.v m
~
. degradation. of.the : seala ' Ins been identifiedPp'Wlo e
f
}' A
[
,,Q :
previously. committed, infourJAugust 28 letter, t month-interval for demonstrating the; leak. tight. integrity-
.,of the containment. purge, supply and exhaust 1valvesC qTh'is proposed SpecificationilSi4.4.-X includes the commitment" c
toicompare~the leaka.ge. rate <for;the purge supply"and:
exhaust valves :to previoacly" measured-leakage rati'es, to-N
'^
_ detect, excessive valve,degredation.- IIn over~ ten ~ years'
.of-operation,~~we~have obseived:no seal degradat' ion-in:
c-these 9alves..
The.additionalTechnica1 Specification $ commitments'
~
~
discussed above-hl ave been included?onLthe.propo' sed Technicalp
" Specification.pages enclosed with this letter..cThesspecific:
-changes proposed.on each.page-have been. identified byfa doublel N
~
margin"bar..The': single margin;bar identifies-those/changesi proposed!with.our.. August 28 letter.
In" acc'ordance with Commission regulhtions, we enclose there'with'three signedJoriginals. Land' forty' copies of this modifi--
'1 2
J#
Jcati^on-to our Technical-Specification Change Request lNo..68.
~
- Please contact us-if you have.any addition'al' questions regarding'-
f this licerise ' amendment. appl'ication., '
' l
~
s N"
~
Very truly;y.ou s,',
?
.*. y j
~
8b'O Q c
~
- AssistantVicbPresident-1 r
C. c W.
Fay En~ closures'
- Copydto' NRbjResidenti Inspector
~
Slubs ribed and sworn to before me-u
- :this ggW Eda'y of~ January 1982.
i bp%. $4 g En y 0.!@ ;
. c3 Notary.@blic, State - of. Wisconsin,
~,
My Commission 1expiresD,b Jd/,M 1 -
r-I
,o
,s v
r_
mm e
d j
.