Letter Sequence Request |
|---|
|
Results
Other: 05000266/LER-1979-010-01, /01T-0 on 790620:plant Safeguards Actuation Circuitry Review Indicated Need for Circuitry Changes.Caused by Changes in IEEE Std Since Plant Design.Mods to Four Applicable Safeguard Circuits Will Be Performed, ML19210C482, ML19242D259, ML19253A712, ML19253B006, ML19257A367, ML19257B511, ML19289C679, ML19310A971, ML19323H481, ML19345H544, ML20010E141, ML20027A527, ML20038C635, ML20039A258, ML20040F029, ML20065R665
|
MONTHYEARML20027A5271978-11-28028 November 1978 Discusses Possible Dangers of LOCA in Containment Purging During Normal Plant Oper.Requests Either Commitment to Limit Purging or Justification for Continuing.W/Encl ANO 7812080207 Project stage: Other ML19289C6791979-01-16016 January 1979 Responds to Re Purging During Normal Operation. Need for Purging Has Been Limited,But It Is Essential That Capability of in-containment Activities at Power Be Maintained Project stage: Other 05000266/LER-1979-010-01, /01T-0 on 790620:plant Safeguards Actuation Circuitry Review Indicated Need for Circuitry Changes.Caused by Changes in IEEE Std Since Plant Design.Mods to Four Applicable Safeguard Circuits Will Be Performed1979-07-0303 July 1979 /01T-0 on 790620:plant Safeguards Actuation Circuitry Review Indicated Need for Circuitry Changes.Caused by Changes in IEEE Std Since Plant Design.Mods to Four Applicable Safeguard Circuits Will Be Performed Project stage: Other ML19253A7121979-08-0808 August 1979 Confirms Action Taken as Result of 790803 Telcon Re Util Request to Leave Containment Purge Values Closed Above Cold Shutdown Condition.Proposal Acceptable on one-time Basis Project stage: Other ML19242D2591979-08-10010 August 1979 Appreciates Prompt Approval of Request to Purge Containment. Approval Reduced Personnel Inconvenience & man-rem Exposure. Will Pursue Review of Containment Purge Sys Project stage: Other ML19253B0061979-09-0606 September 1979 Discusses Containment Purge Valve Operations.Notifies of Potential Mods to Ensure That Valves Will Close Against Containment Pressure Transients.Consultants Will Conduct Studies & Analyses of Potential Mods Project stage: Other ML19323H4811979-09-30030 September 1979 Technical Evaluation of Electrical Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Point Beach Nuclear Power Station,Units 1 & 2 Project stage: Other ML19210C4821979-11-0101 November 1979 Responds to Re Guidelines for Operability of Containment Purging & Venting Valves During Normal Operations.Evaluation Will Consider Consultant Studies of Potential Mods to Valves Project stage: Other ML19257A3671979-11-19019 November 1979 Forwards Interim Position on Containment Purging & Venting During Normal Operation Pending Resolution of Isolation Valve Operability.Commitment to Comply W/Encl Position Should Be Submitted within 45 Days Project stage: Other ML19310A9711979-12-27027 December 1979 Requests Preliminary Evaluation of Licensee Response to NRC 791023 Interim Position for Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability, Generic Item B-24.Evaluation Form Encl Project stage: Other ML19257B5111980-01-0909 January 1980 Provides Commitments Sought in NRC .Forwards to Bechtel Re Purge Valve Capability Verification.Nrc Guidelines Will Be Considered During Evaluation of Mods for Improved Purge Valve Reliability Project stage: Other ML19257C8081980-01-11011 January 1980 Forwards Safety Evaluation to Be Substituted for Encl in Ltr Per Agreement Reached at 791213 Meeting Re Containment Purge Project stage: Approval ML19257C8101980-01-11011 January 1980 Safety Evaluation Approving Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation,Except Radiation Monitors Used to Initiate Containment Purge Isolation Project stage: Approval ML19323H4781980-05-22022 May 1980 Forwards Safety Evaluation Supporting Design Aspects of Containment Purge Valve Isolation Override & Other Engineered Safety Feature Actuation Signals Except Radiation Monitors Which Initiate Containment Purge Isolation Project stage: Approval ML19345H5441981-05-0707 May 1981 Documents Basis for Containment Isolation Pressure Setpoint Reported in Item II.E.4.2 of NUREG-0737 Response Per NRC 810414 Telcon.Present 5 Psig Setpoint Considered Realistic & Appropriate Project stage: Other ML20008F4471981-07-21021 July 1981 IE Info Notice 81-21, Potential Loss of Direct Access to Ultimate Heat Sink. Provides Addl Info to IE Bulletin 81-03 Project stage: Request ML20038C6351981-07-31031 July 1981 Srp,Revision 2 to Section 6.2.4, Containment Isolation Sys Project stage: Other ML20010E1411981-08-28028 August 1981 Proposed Tech Spec Revision Pages 15.3.6-2,15.3.6-3, 15.4.4-12,15.4.4-15 & 15.4.4-15a Re Testing of Containment Purge Supply & Exhaust Sys Isolation Valves Project stage: Other ML20010E1361981-08-28028 August 1981 Application for Amend to Licenses DPR-24 & DPR-27 Submitted as Tech Spec Change Request 68 to Incorporate Addl Restrictions Re Use & Testing of Containment Purge Supply & Exhaust Sys Isolation Valves,Per NRC Request Project stage: Request ML20033C0321981-11-23023 November 1981 Second Discovery Progress Rept for Period Ending 811122,per ASLB 811113 Memorandum Order.Licensee 811027 Responses to Wi Environ Decade 811023 Interrogatories Are Not Fully Responsive.Certificate of Svc Encl.Related Correspondence Project stage: Request ML20039B0181981-11-24024 November 1981 Requests That Util Remit Class III Fee for Unit 1 & Class I Fee for Unit 2 to Cover Review of 810828 Application for Tech Spec Changes Re Containment Purge Valve Operability Project stage: Approval ML20033A9071981-11-24024 November 1981 Advises of Significant Error in 811117 Telcon Transcript Project stage: Request ML20039A2581981-12-0707 December 1981 Requests That NRC Reconsider Requirement of Class III Approval Fee During Final Review Re Tech Spec Change Request 68.Changes to Tech Specs Result of NRC Request.No Approval Fee for Amend Review Necessary Project stage: Other ML20040F0291982-01-28028 January 1982 Proposed Tech Spec 15.3.6 Re Containment Purge Supply & Exhaust Valves Project stage: Other ML20040F0221982-01-28028 January 1982 Application for Amend to Licenses DPR-24 & DPR-27,consisting of Tech Spec Change Request 68 Re Containment Purge Valve Operability Project stage: Request ML20065R6651982-10-22022 October 1982 Provides Results of Confirmatory Analysis Demonstrating That Unacceptable Radioactive Release from Containment Would Not Take Place as Result of Small Break LOCA in Which Operator Action Required.Radioactive Release Negligible Project stage: Other 1980-01-11
[Table View] |
Text
l DISTRIRUTION:
RGBachmann CBarth SATreby MKarman DMB PDR/LPDR iloverter 24, 1931 S/E C/0/S ELD FF (2)
Chron Peter B. Liloch, Chairuan Dr. Hugh C. Paxton Adainistrative Judge Administrative duc.ga Ator:ic Safety and Licensing Bcard 1229 - 41st Street U.S. fluclear Regulatory Comission Los Alanos, !!cw tiexico 87544 1cshington, DC 20555 Dr. Jerry R. Kline
-g Adainistrative Judge Q\\
/
AtorMc Safety and Licensing Board
<cy e
s U.S. iiuclear Regulatory Conaission j/
fff'gh\\
h IICV2 7198% Q-)
g i!ashington, DC 20565 y
In the t!atter of p
y,,, y,.
Wisconsin ticctric Poser Cor.pany
,Q csum D
(Point beach t.uclear Plant, Units 1 and 2)
'A
'4/
uccket ilos. 50-266 and 50-301
& /j (a
Dear Administrative Jud*es:
j The Staff has discovered a significent error la the transcript of the on-the-record telephone conference held on !iov::cher 17,1W1.
On page 791, lines 22 and 23 the statenent should read "Jur conclusion also is that it should be withheld" instead of "Our conciusion also is that it should not be withheld."
Also, all references in that transcript to ilr. Edward Shoenaker of the Staff should be changed to lir. Edward Shouaker.
Sincerely, Richard G. Bachnann Counsel for !!RC Staff cc:
Service List 0112300147 811124 PDR ADOCK 05000
,,,T /]
CFFCCE >
h-
$URNAMEp 11./747B1..
.117 781..
omy unc ronu ais cio.acj uncu c24a OFFICIAL RECORD COPY usa m nei-m 9a
- -