Text

-

J .

REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT ENVIRO 1NENTAL QUALIFICATION (EEQ)

REVIEW OF LICENSEES' RESOLUTION OF OUTSTANDING ISSUES FROM NRC EQUIPMENT ENVIRONMENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND 'IMI ACTION PLAN INSTALLED EQUIPMENT Tennessee Valley Authority Sequoyah Unit 1 NRC Docket No. 50-327 December 21, 1981 NRC TAC No. 42535 l

l l

I dl

. . Franklin Research Center A Division of The Franklin Institute

, The Ber9amn Frankhn Parkway, Ptula . Pa 19103 (215)448 1000 8202080131 820125 PDR ADOCK 05000327 l p PDR

RFI-C5257-519 BACKGROUND Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors. FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant.

This request for additional information (RFI) is the result of an evaluation of the information provided by letters dated November 1981 [1] and September 25, 1981 [2].* FRC previously requested 'IMI Action Plan information by a telephone memorandum dated October 7, 1981.

A. FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE 'IO THE NRC EEQ SER Information Requested Date Received by FRC**

1. In reference to the Licensee's 90-day response [2] to the NRC SER [4], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceeds
a. Westinghouse Test Report NS-TMA-1950
b. Westinghouse Test Report NS 'IMA-2120
c. Foxboro Test Report T2-1075
d. Estimation of Service Life of EA-170-XX302 Limit Switches, November 9, 1979
  • Numbers in brackets refer to citations found in the list of references.
    • This column will be completed by FRC as the requested information is received.

nklin Research Center A DMmon of The Frarweninsuue

K-i ,. .

RF1-C5257-519

)

I Date Received by FRC**

e. Letter R. M. Kantner (Namco Controls) , to L. Stef anek (TVA) , " Switches for Use in Nuclear Power Plants," Feb. 23, 1981
f. Namco Controls Test Report QTR-107 P
g. Test' Plan for No. LP10767-2, Rev. 3, for Namco Controls EA-170-XX-302, November 2, 1979
h. Acme-Cleveland Test Report QTR-105,

" Qualification of EA180 Series Limit i

Switches for Use in Nuclear Power Plants," August 28, 1980

i. Namco Report, " Estimation of Qualified Life of EA-740 Series Nuclear Switch,"

Feb. 27, 1980 Rev.

j. Letter ITT Barton to F. W. Chandler (EEB 801204034)
k. Valcor Qualification Report No.

MR70900-301-1

1. A & M's Report No. 201-39500
m. Rockbestos Report, " Qualification of Firewall SR, Class IE Cables,"

June 7, 1978

n. Anaconda Continental Report No. 79117
o. Wyle Laboratory Test Report 43854-3, April 26, 1978
p. ESSEX Project Report No. PE-53, May 7, 1980 and Report, June 1979
q. Isomedix Test Report 375-02 dated March 1975 for ITT Suprenant
r. Okonite Test Report, " Qualification of OKOZEL Insulated Wire and Cable for Nuclear Plant Service," No. K-0-1, September 1, 1979 nklin Research Center A Dween of The Frensen insasiuse I . ., -

s .

RFI-C5257-519 Date Received by FRC**

s. Okonite " Engineering Report No. 344, Rev.

1, Main Steam Line Break Qualification Test on OKOZEL Insulation," April 16, 1981

t. Westinghouse Test Report PEN-RLK-3-26-73
u. Triax Test Report of Incicent Testing of Triax Penetration
v. Brand-Rex Long Term Thermal Aging -

Arrhenius Plot, May 30, 1978

w. Isomedix Qualification Test for Eaton Corporation, Samuel Moo e Operations, January 1980 (MSLB)
x. Letter - General Electric Company to H. J. Green of TVA dated January 31, 1978,

" Test bata for Terminal Blocks, Catalog No. CR-151B"

y. Letter - Wentinghouse Company to F. W.

Chandler of TVA dated March 9, 1978,

" Data for Terminal Block - Westinghouse Style No. 80530"

2. Report - BWR Owner's Group Report 081-A-01 dated September 23, 1980, supplied test data for terminal block, General Electric Company Type No. EB-25
2. The normal and accident environment profiles for inside containment (temperature and pressure vs. time and humidity) were missing from References 1 and 2. FRC requests this information.

B. FRC REVIEW OF INSTALLED 'IMI ACTION PLAN ITEMS Information Requested Date Received by FRC**

1. Reference 1 does not provide adequate detail with respect to identification of TMI Action Plan equipment installed as of 1/1/81. (FRC has not received any response to the previous request for information concerning TMI Action Plan items [3).)

nklin Research Center A Duseon of The Franien insuue

s .

, RFI-C5257-519

( Date Received by FRC**

f

a. Identification of all TMI Action Plan equipment installed as of 1/1/81 is requested.
b. Identification of TMI Action Plan 2

equipment installed with implementation dates after 1/1/81 is requested.

c. The correlation of these equipment items with the specific sections of NUREG-0737

[5] presented below (as applicable) is requested.

IIE1.2, IIE4.2, IIE3.1, IIG1, IIF2, IID3, IIK3.12 (Wx) , IIK3. 9 (Wx) , IIB 3, IIE4.1.

[The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a TMI Action Plan item, are the cable and terminal blocks associated with the device also identified?]

d. Fbr all installed TMI Action Plan equipment identified, a System Component Evaluation Worksheet (SCEW) (in accordance with 79-01B format) is requested.
e. The approximate installation date for the TMI Action Plan equipment items is requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ '

evaluation.

2. The qualification documents, e.g. , the actual test reports and associated correspondence

,,, cited as evidence of qualification listed on the SCEW sheets, for all identified TMI Action Plan equipment are requested. [The' identification of those reports considered to be proprietary is requested so that proper control of cocuments can be maintained.)

nklin Research Center A Duseon of The FredenInseouse i

.. , ._ . _ _ _ .. -_______.__~

RFI-C5257-519 Date Received by FRC**

3. Where the Licensee has a standard Owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the review.

C. INSTRUCTIONS FOR TRANSMITTING INFORMATION REQUESTED

1. The schedule for completion of the FRC' assignment requires that the Licensee provide the requested information within 3 weeks of the date of the RFI.
2. The Licensee may transmit the requested information as follows:

o complete package directly to the NRC project manager or

'f(copyofcoverlettertoNRCprojectmanagerandcompletepackagetoFRC.

FRC mailing address is as follows:

Mr. Cyril J. Crane .

Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 r

nklin Research Center A Dusion af The Franhan kuutute

RFI-CS257-519 REFERENCES

1. Electrical Equipment Environmental Qualification Report for Sequoyah Nuclear Plant - Unit 1 Tennessee Valley Authority, 00-Nov-80 Proprietary
2. L. M. Mills Letter to E. Adensam (NRC)

Subject:

Sequoyah Nuclear Plant Response to NRC Safety Evaluation for the Environmental Qualification of Safety-Related Electrical Equipment Tennessee Valley Authority, 25-Sep-81

3. Telephone Memorandum C. J. Crane, R. Garrison, and D. Schmitz (FRC) Conversation with H.

Walker (NRh/EQB) , R. Reeves, J. Willis, R. Rogers, J. Edwards, and S.

Stout (TVA)

Subject:

Request for Information, EEQ Review of TMI Action Plan Items, Sequoyah Units 1 and 2 and Browns Ferry Units 1, 2 and 3 07-Oct-81

4. Office of Nuclear Reactor Regulation Safety Evaluation Report for Sequoyah Units 1 and 2 Environmental Qualification of Safety-Related Electrical Equipment NRC, 1981
5. NUREG-0737

" Clarification of TMI Action Plan Requirements" NRC, November 1980 nklin Research Center A Dhanson of The Frankkainsotwe