Equipment Environ Qualification Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info
ML20040E964
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/21/1981
From:
FRANKLIN INSTITUTE
To:
Shared Package
ML20040E949 List:
References
RFI-C5257-526, RFI-C5257-526-0, NUDOCS 8202080139
Download: ML20040E964 (7)


Text

.

REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT ENVIROtMENTAL QUALIFICATION (EEQ)

REVIEW OF LICENSEES' RESOLUTION OF OUTSTANDING ISSUES FROM NRC EQUIPMENT ENVIROINENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT Tennessee Valley Authority Sequoyah Unit 2 NRC Docket No. 50-328 December 21, 1981 4

. 00 Franklin Research Center A Division of The Franidin Institute The Benstrun Frankhn Parkway PNta. Pa. 19103 (21S)448-1000 8202080139 820125 PDR ADOCK 05000327 P

PDR

RFI-C5257-526 BACKGROUND l

Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors. FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to stfety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant.

This request for additional information (RFI) is the result of an evaluation of the information provided by letters dated September 25, 1981

[1].*

FRC previously requested 'IMI Action Plan information by a telephone memorandum dated October 7, 1981 [2].

l A.

FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE 'IO THE NRC EEQ SER Information Requested Date Received by FRC**

1.

In reference to the Licensee's 90-day response [1] to the NRC SER [3], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceeds a.

Westinghouse Test Report NS-TMA-1950 b.

Westinghouse Test Report NS-TMA-2120 c.

Foxboro Test Report T2-1075 d.

Estimation of Service Life of EA-170-XX302 Limit Switches, November 9.,

1979

  • Numbers in brackets refer to citations found in the list of references.
    • This column will be completed by FRC as the requested information is received. U00 Franklin Research Center A owi n or n. r, men m

RFI-C5257-526 Date Received by FRC**

e.

Letter R. M. Kantner (Namco Controls), to L. Stef anek (TVA), " Switches for Use in Nuclear Power Plants," Feb. 23, 1981 f.

Namco Controls Test Report OTR-107 g.

Test Plan for No. LP10767-2, Rev. 3, for Namco Controls EA-170-XX-302, November 2, 1979 h.

Acme-Cleveland Test Report QTR-105,

" Qualification of EA180 Series Limit Switches for Use in Nuclear Power Plants," August 28, 1980 i.

Namco Report, " Estimation of Qualified Life of EA-740 Series Nuclear Switch,"

Feb. 27, 1980 Rev.

j. Letter ITT Barton to F. W. Chandler (EEB 801204034) k.

Valcor Qualification Report No.

MR70900-301-1 1.

A & M's Report No. 201-39500 m.

Rockbestos Report, " Qualification of Firewall SR, Class IE Cables,"

June 7, 1978 n.

Anaconda Continental Report No. 79117 o.

Wyle Laboratory Test Report 43854-3, April 26, 1978 p.

ESSt.X Project Report No. PE-53, May 7, 1980 and Report, June 1979 q.

Isomedix Test Report 375-02 dated March 1975 for ITT Suprenant r.

Okonite Test Report, " Qualification of OKOZEL Insulated Wire and Cable for Nuclear Plant Service," No.

K-0-1, September 1, 1979 nklin Research Center A Dnesson of The Frerwen trusquee

RFI-C5257-526 Date Received by FRC**

s.

Okonite " Engineering Report No. 344, Rev.

1, Main Steam Line Break Qualification Test on OKOZEL Insulation," April 16, 1981 t.

Westinghouse Test Report PEN-RLK-3-26-73 u.

Triax Test Report of Incident Testing of Triax Penetration v.

Brand-Rex Long Term Thermal Aging -

Arrhenius Plot, May 30, 1978 w.

Icomedix Qualification Test for Eaton Corporation, Samuel Moore Operations, January 1980 (MSLB) x.

Letter - General Electric Company to H. J. Green of TVA dated January 31, 1978,

" Test Data for Terminal Blocks, Catalog No. CR-151B" y.

Letter - Westinghouse Company to F. W.

Chandler of TVA dated Ma ch 9, 1978,

" Data for Terminal Block - Westinghouse Style No. 80530" z.

Report - BWR Owner's Group Report 081-A-01 dated September 23, 1980, supplied test data for terminal block, General Electric Company Type No. EB-25 2.

The normal and accident environment profiles for inside containment (temperature and pressure vs. time and humidity) were missing from Reference 1.

FRC requests this information.

B.

FRC REVIEW OF INSTALLED TMI ACTION PLAN ITEMS Information Requested Date Received by FRC**

1.

Reference 1 does not provide adequate detail with respect to identification of TMI Action Plan equipment installed as of 1/1/81.

(FRC has not received any response to the previous request for information concerning TMI Action Plan items [2].)

nklin Research Center A Onne.on of The Frankhn knague

RFI-CS257-526 i

Date Received by FRC**

i a.

Identification of all M I Action Plan equipment installed as of 1/1/81 is requested.

b.

Identification of TMI Action Plan equipment installed with implementation dates after 1/1/81 is requested.

c.

The correlation of these equipment items with the specific sections of NUREG-0737

[4] presented below (as applicable) is requested.

IIEl.2, IIE4.2, IIE3.1, IIG1, IIF2, IID3, IIK3.12 (Wx), IIK3. 9 (Wx), IIB 3, IIE4.1.

(The correlation is needed to ensure that all items are included in the 4

review, e.g.,

if a transmitter is identified as a WI Action Plan item, i

are the cable and terminal blocks associated with the device also identified?]

d.

For all installed 'IMI Action Plan equipment identified, a System Component Evaluation Worksheet (SCEW) (in i

accordance with 79-OlB format) is requested.

The approximate installation date for the e.

TMI Action Plan equipment items is I

requested.so that the appropriate i

qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.

l 2.

The qualification documents, e.g.,

the actual test reports and associated correspondence l

cited as evidence of qualification listed on the SCEW sheets, for all identified TMI Action Plan equipment are requested.

[The identification of those reports considered to be proprie.tary is requested so that proper control of documents can be maintained.]

_nklin Resea_rch._ Center l

..y n-, i,---,.

f

,m

-c, t. -, -.

RFI-C5257-526 Date Received by FRC**

3.

Where the Licensee has a standard Owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested ir, order to incorporate it into the review.

C.

INSTRUCTIONS FOR TRANSMITTING INEORMATION REQUESTED 1.

The schedule for completion of the FRC assignment requires that the Licensee provide the requested information within 3 weeks of the date of the RFI.

2.

The Licensee may transmit the requested information as follows:

o complete package directly to the NRC project manager or copy of cover letter to NRC project manager and complete package to FRC.

FRC mailing address is as follows:

Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 Ubranklin Research Center A DMoon of The Frween heseuse

s.

RFI-C5257-526 REFERENCES 1.

L. M. Mills Letter to E. Adensam (NRC)

Subject:

Gequoyah Nuclear Plant Response to NRC Safety Evaluation for the Environmental Qualification of Safety-Related Electrical Equipment Tennessee Valley Authority, 25-Sep-81 2.

Telephone Memorandum C. J. Crane, R. Garrison, and D. Schmitz (FRC) Conversation with H.

Walker (NRR/EQB), R. Reeves, J. Willis, R.

Rogers, J. Edwards, and S.

4 Stout (TVA)

Subject:

Request for Information, EEQ Review of TMI Action Plan Items, Sequoyah Units 1 and 2 and Browns Ferry Units 1, 2, and 3 07-Oct-81 3.

Office of Nuclear Reactor Regulation Safety Evaluation Report for Sequoyah Units 1 and 2 Environmental Qualification of Safety-Related Electrical Equipment NRC, 1981 4.

NUREG-0737

" Clarification of TMI Action Plan Requirements" NRC, November 1980 i

l l

l N ranklin Research Center A Dhamon of The Frankhn insetAe

we P

P

%v v

t.

g DISTRIBUTION:

Docket No. 50-328 J2 2 51382 LB #4 r/f DEisenhut Docket Nos: 50-327 EAdensam bec: TERA and 50-328 CStahle NRC PDR muncan Local PDR SHanauer TIC RTedesco NSIC RVollmer ACRS (16)

Mr. H. G. Parris TMurley Manager of Power RMattson Tennessee Valley Authority RHartfield, MPA 500A Chestnut Street. Tower II DELD Chattanooga, Tennessee 37401 OIE (3)

Dear Mr. Parris:

Subject:

Equipment Environmental Qualification Enclosed is a request for additional information on environmental qualification of equipment for the Sequoyah Units 1 & 2.

This review was carried out by the Franklin Research Center in accordance with the NRC approved scope of assignment.

You are requested to submit your responses by February 19, 1982, to the Franklin Research Center and a copy of the cover letter to the NRC project manager as noted in the enclosure.

The reporting and/or recordkeeping requireiaents containcd in this letter affect fewer than ten respondents; therefore, 0.MB clearance is not required under P.L.96-511.

Sincerely.

Original signed by Robert p Jedesco P,obert L. Tedesco, Assistant Director for Licensing Division of Licensing

Enclosure:

As stated cc:

See next page

c. #' #/

3 OFFSCe >.bb

...Yb.0

@..k.b

.Y........

. =. - * "

sunme >

le/hmc... Mnnn n n,...,...Euo nm _.

sco -._

..udia..........11.2.\\in..........u. eon.......1M12........

om>

unc ronu ais oo-son nacu oua OFFICIAL RECORD COPY usam mi-==

w-4 -

f' UNITED STATES y

g NUCLEAR REGULATORY COMMISSION 3

j WASHINGTON. D. C. 20656 JAN 2 51982 Docket Nos: 50-327 and 50-328 Mr. H. G. Parris Manager of Power Tennessee Valley Authority 500A Chestnut Street, Tower II Chattanooga, Tennessee 37401

Dear Mr. Parris:

Subject:

Equipment Environmental Qualification Enclosed is a request for additional information on environmental qualification of equipment for the Sequoyah Units 1 & 2.

This review was carried out by the Franklin Research Center in accordance with the NRC approved scope of assignment.

You are requested to submit your responses by February 19, 1982, to the Franklin Research Center and a copy of the cover letter to the NRC project manager as noted in the enclosure.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, i

M Robert L. Tedesco, Assistant Director for Licensing Division of Licensing

Enclosure:

As stated I

j cc:

l See next page

SEQUDYAH Mr. H. G. Parris Manager of Power Tennessee Valley Authority 500A Chestnut Street, Tower 11 Chattanooga, Tennessee 37401 cc: Herbert S. Sanger, Jr., Esq.

General Counsel Tennessee Valley Authority 400 Commerce Avenue E 11B 33 Knoxville, Tennessee 37902 Mr. H. N. Culver Tennessee Valley Authority 400 Connerce Avenue, 249A HBB Knoxville, Tennessee 37902 Mr. Bob Faas Westinghouse Electric Corp.

P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Mark Burzynski Tennessee Valley Authority 400 Chestnut Street, Tower II Chattanooga, Tennessee 37401 Mr. J. F. Cox Tennessee Valley Authority 400 Commerce Avenue, W10C131C Knoxville, Tennessee 37902 Resident Inspector /Sequoyah NPS c/o U.S. Nuclear Regulatory Commission 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 James P. O'Reilly, Regional Administrator U.S. Nuclear Regulatory Connission, Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 L