ML20040A286
| ML20040A286 | |
| Person / Time | |
|---|---|
| Site: | 05000561 |
| Issue date: | 09/09/1977 |
| From: | Cox T Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML111090060 | List:
|
| References | |
| FOIA-80-515, FOIA-80-555 NUDOCS 8201200704 | |
| Download: ML20040A286 (4) | |
Text
..
[" " %
UMTED STATES NUCLEAR REGULATORY COMMISSION 3*.
i h
j WASHINGTON, D. C. 20065 s
j f
%**.../
SEP 0 91977 Docket No. STN 50-561 VENDOR:
Babcock & Wilcox Company (B&W)
SUBJECT:
SUMMARY
OF ACRS FULL COMMITTEE MEETING - BSAR-205 On August 11, 1977, the Advisory Comittee on Reactor Safeguards (ACRS) met in Washington, D.C. to conduct a full comittee review of tha application by B&W for a Preliminary Design Approval for the BSAR-205 standard nuclear steam supply system. The ACRS meeting was conducted by Mr. M. Bender, Chainnan.
After introductory remarks by B&W and a status sumary by the staff Project Manager, B&W representatives made a series of technical presentations in accordance with a detailed meeting agenda. The agenda is included in this sumary as an enclosure. A complete transcript of the meeting is available for examination and copying in the NRC Public Document Room at 1717 H Street, Washington, D.C.
T At the close of the meeting, Mr. Bender polled the Comittee and
(/
indicated that the ACRS would write a favorable letter of recomendation to the Chairman of the NRC.
kl Grafir.
Thomas H. Cox, Project Manager Light Water Reactors Branch No. 3 Division of Project Management
Enclosure:
Tentative Detailed Schedule cc w/ enclosure:
See next page i
}
~
MADDEN 80-515 PDR
. - - - -. ~ - -
Babcock & Wilcox Company SEP 0 91977
,)
ATIN: Mr. James H. Taylor
((
Manager of Licensing Nuclear Power Generation Division P. O. Box 1260 Lynchburg, Virginia 24505 cc: Washington Public Power Supply System ATIN: Mr. N. O. Strand Managing Director (Acting)
P. O. Box 968 3000 George Washington Way Richland, Washington 99352 Mr. Robert Borsum Bethesda Representative Babcock & Wilcox Nuclear Power Generation Division Suite 5515, 7735 Old Georgetown Road i
Bethesda, Maryland 20014 B. G. Shultz Project Engineer Stone & Webster Digineering Corporation
/
\\
P. O. Box 2325
(!
Boston, Massachusetts 02107 Mr. W. E. Kessler Coninonwealth Associates, Inc.
209 East Washington Jackson, Michigan 49201 Robert J. Kafin, Esq.
115 Maple Street Glen Falls, New York 12801 Mr. B. M. Miller Chio Edison Company 76 South Main Street Akron, Ohio 44308 e
4 i
~m...-
--w,
.<w w-,-
. ~..
..~
.--_r, g.
, g.n.
,,m.,,g%
w,;
m s
v e-r
d
~
ENCLOSURE
'T TCNTATIVC DCIAILED SCI!EDULC FOR ACBS IC/IEW OF B&W STANDARD
~
PLN4T (BSAR-205) 208th ACRS MEETING AUGUST 11, 1977 WASHItCION, D.C.
8:45 a.m.
I.
Subcomittee Report, Executive Session,,OPEN) 9:15 a.m.
II.
Meeting w;th Applicant and NBC Staff (OPEN)
A.
Introductory,, non-technical remarks by Applican.
1.
Scope of BSAR-205 design 2.
a) Similar designs reviewed by ACP3 b) L'st of Applicants referencing BSAR-205 B.
Staff Reoort 1.
Scope of Review 2.
Outstanding Issues J.
Review work outstanding including Topical k_}
Reports - indicating what needs doing I
prior to PDA 4.
Other matters of special interest to ACES revica 5.
Applicant's Response C.
'Ibchnical_ Presentation by Applicant i
i 1.
Differences between BSAR-203 and carlict BEW designs as regards:
a) Fuel (Mark C design) and Reactor l
b) Reactor Coolant and Steam Supply Systems 3
c) Decay lleat Removal System d) Engineered Safety Features e) Protection Systems t
2.
Industrial Security (CLOSED),
i l
3.
Additional items - (at ACRS option) a) SG tube cracking b) Start-up procedure with nitrogen bubble i
in pressurizer I
l
..w,-g.
~...,.,
. c.___.._.._ _. _.
ENTATIVE DETAILED SCHEDULE BSAR-205
(._ )
Page 2 c.
Means and need for removal of non-condensibles froni coolant to establish natural convection cooling following l
a small break d.
Means and need for measuring liquid levels in reactor Asynnetric Fotces on Reactor Pressure e.
Vessel f.
Reliability of scram 'Jteakcr trip system; diversity of actuation system to remove power from control t x!4 12:45 p.m.
III. Committee Caucus (Executive Session, OP.EN) 1:00 p.m.
IV.
Concluding Remarks 1:15 p.'m.
LUlK.fi
_/-
9 4'
i I
a 1
I I
.r+-*m--
I 1
,,. - - - -