ML20040A255
| ML20040A255 | |
| Person / Time | |
|---|---|
| Site: | 05000561 |
| Issue date: | 08/05/1977 |
| From: | Cox T Office of Nuclear Reactor Regulation |
| To: | Parr O Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML111090060 | List:
|
| References | |
| FOIA-80-515, FOIA-80-555 NUDOCS 8201200625 | |
| Download: ML20040A255 (3) | |
Text
'
i
'4 UNITED STATES g-
- g NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D. C. 20055 k
\\,,,,,*
AUG 0 51977 Docket No. STN 50-561 MEMORANDUM FOR:
- 0. D. Parr, Chief, Light Water Reactors Branch No. 3, DPM FROM:
T. Cox, Project Manager, Light Water Reactors Branch No. 3, DPM 1
SUBJECT:
ACRS FULL COMMITTEE MEETING ON BSAR-205 TIME & DATE:
8:45 AM Thursday, August 11, 1977 LOCATION:
Room 1046,1717 H Street, N. W.
l Washington, D. C.
PURPOSE:
To conduct the ACRS Full Committee review of the application by_
Babcock & Wilcox for a Preliminary _ _ _
Design Approval for the BSAR-205
-(')
standard nuclear steam supply system. A tentative detailed agenda is attached.
PARTICIPANTS:
NRC Staff
- 0. Parr, T. Cox, R. Fitzpatrick, G. Mazetis, T. Novak B&W J. Taylor, J. Happell, J. Hamilton, R. Brockman, G. Brazill, D. Roy, E. Swanson, E. Hooker, G. Kulynych ACRS l
Full Committee Al l
Uhv.
Thomas H. Cox, Project Manager l
Light Water Reactors Branch No. 3 Division of Project Management
Enclosure:
i Tentative Detailed Schedule i
i 8201200625 810403 PDR FOIA MADDEN 80-515 PDR
.y s,
e
\\
TENTATIVC DCIAILED SCIlEDULE k
POR ACBS lE/IEW OF B&W STANDARD PIANT (BSAR-205) 208th ACPS MECTItG AUGUST 11, 1977 M SHItb % 9, D.C.
~
8:45 a.m.
I.
Subcomittee Report, Executive Session, (OPD1) 9:15 a.m.
II.
Meeting w *th Applicant and NBC Staff (OPD1)
Introductory,, non-technical remarks' A.
r by Applicanc 1.
Scope of BSAR-205 design 2.
a) Similar designs reviewed by ACP3 b) List of Applicants referencing BSAR-205 B.
Staff Report 1.
Scope of Review 2.
Outstanding Issues
.$. Review work outstanding including Topical
( )h Reports - indicating what needs doing prior to PDA 4.
Other ryltters of special interest to ACPS revica 5.
Applicant's Response C.
Technical Presentation by Applicant 1.
Differences between BSAR-203 and carlier B&W designs as regards:
a) Fuel (Mark C design) and Reactor b) Reactor Coolant and Steam Supply Systems c) Decay IIcat Removal System d) Engineered Safety Features c) Protection 6ystems 2.
Industrial Security (CLOSED) 3.
Additional items - (at ACRS option) a) SG tube cracking b) Start-up procedure with nitrogen bubble in pressurizer 1
- - - -. ~..
--n.
W
~~
TENTATIVE DETAILED SOIEDUIE
(._)
BSAR-205 Page 2 c.
Means and need for removal of non-condensibles froth coolant to establish natural convection cooling following a small break d.
Means and need for measuring liquid levels in reactor e.
AsynUntric Fotces on Reactor Pressure Vessel f.
Reliability of scram 'Orcake.r trip system; diversity of actuation system to remove power from control rods 12:45 p.m.
III. Committee Caucus (Executive Session, OP.EN) 1:00 p.m.
IV.
Concluding Remarks 1:15 p.in.
LUtr.!i 4
e i
/
4 9
I
?
i 1
^*e* *maMM+
+
.aeummed> e me- =, - ee,.
7p.p..,
,,,p
.,4-y.-