ML20040A139

From kanterella
Jump to navigation Jump to search
Informs That Attempts Are Being Made to Hold 760312 Meeting at Which B&W Licensing Organization Will Present Info Re Vendor Nuclear Organization & Responsibilities & Licensing Section Organization & Responsibilities.Comments Requested
ML20040A139
Person / Time
Site: 05000561
Issue date: 03/03/1976
From: Cox T
Office of Nuclear Reactor Regulation
To: Check P, Deliso V, Sihweil I
NRC
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8201200397
Download: ML20040A139 (1)


Text

'

4 -M f

j 'N 3

Yh j

'4 UNITED STATES

("~

+4 NUCLEAR REGULATORY COMMISSION t

o WASWNGTON, D. C. 20b55 O

~!

/

MAR 3 1976 T0 Those Listed Below THRU: John F. Stolz, Chief, Light Water Reactors Branch No. 1 Q B&W MEETING I am trying to set up a meeting on March 12,~1976 at which the B&W licensing organization will direct a presentation to the NRC concerning:

1.

B&W Nuclear Organizatien and Responsibilitics 2.

Licensing Section organization and Responsibilities 1

1 3.

BSAR-205 NSSS Design Description l

The presentation is intended to familiarize NRC staff with the B&W organization, including key engineering and licensing personnel, as well as to provide a design overview of the basic B&W product--the 205 fuel assembly NSSS. The BSAR-205 standard reactor system has just

'7]

been docketed for PDA review, and five other 205 F.A. systems have either been through or are in the CP review process. These are:

Bellefont, WNP-1/4 (WPPSS), Greenwood, Pebble Springs, and Greene County applications. At'least two other applications are expected to reference the BSAR-205 NSSS within a year.

Please indicate your interest (or disinterest) in attending such a h[

presentation (1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) by returning a copy of this memo to me, with your comments, by Friday, March 5, 1976. Mail stop is Room 242.

}Yy

%~-

4]

h

.f 7

( //@.

0'M Thomas Cox, Project Manager

\\/mgg hC5e Light Water Reactors Branch No. 1 g

g Division of Project Management R. Heineman S. Varga 7D. Vassallo R. Maccary D. Skovholt R. Boyd D. Ross R. Denise

/ W. Haass R. Tedesco M. DeYoung o B. Grices oJ. Knight W P. Collins V. Stello S. Pawlicki C. Heltemes V K. Coller 7 1. Sihweil R. Houston VD. Eisenhut v4. Check T. Speis a R. Purple T. Novak V R. Clark D. Ziemann 3

Z. Rosztoczy

/J. Stolz G. Lear

)

V. Benaroya F K. Kniel*f 4*

CR. Reid M

G. Lainas.

O. Parr L. Shao O T. Ippolito W. Butler R. Baer A. Schwencer 8201200397 810403 PDR FOIA

~

~~

~

MADDEN 80-515 PDR f

E

.