ML20040A064
| ML20040A064 | |
| Person / Time | |
|---|---|
| Site: | 05000561 |
| Issue date: | 08/09/1976 |
| From: | Boyd R Office of Nuclear Reactor Regulation |
| To: | Suhrke K BABCOCK & WILCOX CO. |
| Shared Package | |
| ML111090060 | List:
|
| References | |
| FOIA-80-515, FOIA-80-555 NUDOCS 8201200293 | |
| Download: ML20040A064 (4) | |
Text
__
Cd UNIT o STAT 3s
- -~.,
NUC. EAR REGULATcRY cO?.lf. 153!CN
(,,.
WASHINGTON, 3. O. 00353 j
o_. A / 5
- j M;G 9 1976 Docket No. STN 50-561 Babcock & Wilcox Company ATTN: Mr. Kennetii E. Suhrke Manager, Licensing Nuclear Power Generation P. O. Box 1260 Lynchburg, Virginia 24505 Gentlemen:
The Nuclear Regulatory Conunission recently forwarded a letter to your company concerning procedural changes in the initial treatment of an application for a construction pennit or facility operating license and amendments thereto. These changes were adopted by NRC
__ _.and_ incorporated as amendments to Parts 2, 50, and 51 of 10 CFR, which became effective May 17, 1976.
Paragraph 50.30(c)(1)(i) of 10 CFR Part 50 requires that an applicant submit to the staff, 40 copies of the Safety Analysis Report and any amendments thereto and retain 30 copies for direct distribution to appropriate Federal, State and local officials in accordance with written instructions of the staff.
An initial submission of 40 copies of the SAR is adequate for staff review since it is practicable to break a set of each SAR into sections so that more than one staff member may work concurrently with a single SAR.
It is not feasible, however, to divide an amendment to the SAR so that it may be reviewed concurrently by more than one staff member. In many instances, therefore, the staff must reproduce additional copies of the amendments.
To ensure prompt review of amendments to the SAR by our staff, the NRC has amended paragraph 50.30(c)(1)(i) of 10 CFR Part 50, increasing the required number of copies of amendments to the SAR from 40 to 60 copies. Your company should continue to retain 30 copies for distribution in accordance with our written instructions.
8201200293 810403 PDR FOIA MADDEN 80-515 PDR
o Babcock & Wilcox Company Amended paragrafi 50.30(c)(1)(1) was published in the Federal Register on Thursday, July 29, 1976 and was effective upon publication. A copy of the Federal Register Notice is enclosed for your information and use.
Also enclosed are two revised service lists to update the service lists that were originally transmitted to your company with our May 1976 letter.
Sincerely, Roger S.
yd, Direct Division of Project Management Office of Nuclear Reactor Regulation
Enclosures:
1.
Federal Register Notice (41 FR 31521) 2.
Revised Distribution List for Safety Analysis Reports and Amendments 3.
Revised Distribution List for Environmental Report, Amendments, and Supplements cc: see next page i
4 W:,. 3 s
GS gg s Babcock & Wilcox Company cc: Washington Public Power Supply System ATTN:
Mr. J. J. Stein Managing Director P. O. Box 968 3000 George Washington Way Richland, Washington 99352 Mr. Robert Borsum Bethesda Representative Babcock & Wilcox Nuclear Power Generation Division Suite 5515, 7735 Old Georgetown Road Bethesda, Maryland 20014
- 8. G. Shultz, Project Engineer Stone & Webster Engineering Corp.
P. O. Box 2325 Boston, Massachusetts 02107 Mr. A. H. Monteith Ohio Edison Company i
47 North Main Street Akron, Ohio. 44308 Mr. W. E. Kessler Commonwealth Associates, Inc.
209 East Washington Jackson, Michigan 49201 Robert J. Kafin, Esq.
115 Maple Street Glen Falls, New York 12801 4
4 8
a.
FEDERE, STATE #TD LOCAL CFFICIAIS FCR APPLICATICN, SAR RID AMENDMENTS TERETO t
ESAR-205 SEND 3 CCPIES OF AMENDMENTS TO:
Dr. Neill Thomasson (AW h59)
(Federal Government - U. S.
Chief, Energy Systems Analysis Branch Environmental Protection Agency)
Cffice of Radiation Prcgrams Environmental Protection Agency h01 M Street, S.W.
Washington, D.C.
20k60 t
l i
l l
t i
t f
f
,j-t I
t l
--