ML20039H228
Text
.
s @ c'cu f,
_fg UNITED STATES NUCLEAR REGULATORY COMMISSION y Yg v.
g j
ADVISORY COMMITTEE ON REACTOR SAFEGUARDS g*
WASHINGTON, D. C. 20555 August 1,1977 Lastence P. Crocker Technical Assistant to the Director Division of Project Management ACBS -208th MEETIt,U, SCHEDULE FOR REVIEN OF BSAR-205, AUGUST 11, 1977_
The Advisory Cc=nittee on Reactor Safeguards will continue its: review of the application of the Babcock & Wilcox Company (B&W) for. Preliminary D^ sign Apptr*tal for its BSAR-205 standard nuclear steam supply system (NSSS) at the 203rh ACRS Meeting on August 11, 1977 in Room 1046, 1717 H Street, N.W., Washington, D.C.
A Tentative Detailed Schedule for the meeting is attached.
Would you please inforn all NEC Staff organizations expet led to participate in the meeting, as well as other participants (including the Applicant and any consultants), of our need for 30 paper copies of all slides, trans-parencies, visual aids, and handouts used to support presentations to the Subcommittee.
If there are any questions concerning any of the above planning details, please contact me on 634-1413.
Q. O ',s.. S
<h v-Raggaald Muller Senior Staff Engineer ATTACENEfff Tentative Detailed Schedule for Review of BSAR-205 cc:
E.G. Case E.P. Epler S. Ditto S. Levine R.S. Boyd H.E. Voress E. Volgenau R.C. DeYoupg M.U. Libarkin R.B. Minoque T.H. Cox /
J.C. McKinley R.J. Mattson D.F. Ross J.H. Arnold I. Catton 4.H. Hanauer H.S. Isbin T. Theofanous O.D. Parr J.C. Ebersole W.C. Lipinski R.F. Fraley H. Etherington 8201190744 810403 PDR FOIA MADDEN 80-515 PDR
TENTATIVE DETAILED SCIIEDULE FOR ACRS REVIEW OF B&W STANDAliD PIMT (BSAR-205) 208th ACES MEETItG AUGUST 11, 1977 WASHItGION, D.C.
8:45 a.m.
I.
Subcomittee Report, Executive Session, (OPEN) 9:15 a.m.
II.
Meeting Eth Applicant and NRC Staff (OPEN)
A.
Introductory, non-technical remarks by Applican 1.
Scope of BSAR-205 design 2.
a) Sifailr* designs reviewed by ACP'i.
b) List of Applicants referencing BSAR-205 B.
Staff Recort 1.
Scope of Review 2.
Outstanding Issues
.5. Review work outstanding including Topical Reports - indicating what needs doing prior to PDA 4.
Other qatters of special interest to ACPS revic#
5.
Applicant's Response Technical Presentation by Applicant C.
1.
Differences betweeti BSAR-205 and carlier B&W designs as regards:
a) Fuel (Mark C design) and Reactor b) Reactor Coolant and Steam Supply Systers c) Decay lleat Renoval System d) Engineered Safety Features e) Protection systems 2.
Industrial Security (CLOSED) 3.
Additional items - (at ACBS option) a) SG tube cracking b) Start-up procedare with nitrogen bubble in pressurizer
.-v,.
y
au. -
TDITATIVE DETAILED SCIEDUIE BSAR-205 Page 2 c.
Means and need for renoval of non-condensibles fron coolant to establish natural convection cooling following a small bieak d.
Means and need for neasuring liquid levels in reactor e.
Asyninetric Fotces on React.or Pressure Vessel f.
Reliability of scrc= breaker trip system; diversity of actuation system to remove power from control rods 12:45 p.m.
III. Committee Caucus (Executive Session, OBE:1) 1:00 p.m.
IV.
Concluding Remarks 1:15 p.in.
LUIL 1
e f
.w..
Af Attachmeat 3 u m sa n avas IsuCLEAR RieubATORY CCHastasM3N easutastoa.s. a. seoss 301-492-7000 racrix La suavict asocrs-
'T
//77 am:
BHA / -//4/%7/
tarsam To:
I Po13f47773 TELacort Isaan: _
1 mrtmune:
S m.
r J74t vzuncanas namn _ Pod Tid 57 / /
ac. e rasts s7 rus umDertos suzn j
V/].L%Krtr&its I
am s em S bk-sassact FacH:
3cw92-ano mar u it aman m e i
~
sztacon sman_
301 4 92-7617 m v1C AF!taunC 301 4 92-7371 vsuficAnos maan crnCE 7501E ~2724 3 suit car
/ LT BUIl#Inc _
F 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 4 hour Overnight l
class OF SD VICE:
l X
Insediate i
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> W3:1AL u f!1DCHONS:
I 0bw On ~
Tr snsuitted / Time-Snt*
Ra est ved /Ttse-Dete e
i
,3 5 f
t
~
i-
.('d a l'.*.~...
.('d 0 D 13 -
1
_ _ _