Forwards Additions & Changes to SER
ML20039H132
Person / Time
Site: 05000561
Issue date: 02/24/1977
From: Vollmer R
Office of Nuclear Reactor Regulation
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8201190610
Download: ML20039H132 (2)


Text

_ _ _

,y,.

3 ;'

FEB 2 4 1977 Docket No.: STH 50-561 I

MEH0PANDUM FOR: Domenic B. Vassallo, Assistant Director for Light Water Reactors DPM FR0H:

Richard H. Vollmer, Assistant Director for Site Analysis, DSE

SUBJECT:

CHANGE IH ACCIDENT ANALYSIS BRANCH SER INPUT ON B-SAR-205 PLANT HAME: Babcock and Wilcox Standard huclear Steam Supply System LICENSING STAGE: PDA DOCKET NUMBER: STsi 50-561 MILESTONE NUMBER:

24-31 RESPONSIBLE BRAdCH: LWR 63; T. Cox, LPM REQUESTED COMPLETION DATE: N/A REVIEW STATUS: AAB SER Input Complete l

AAB has reviewed Amendment Nos. 8, 9, and 10 to the B-SAR-205 application.

....i Based on this review some additions and changes to the SER have been made.

i Please incorporate tne atte.hed material into tne SER.

}v. Mf l

chard H. Vollmer, Assistant Director for Site Analysis l

Division of Site Safety and h

Environmental Analysis i

Enclosure:

Ctanges to B-SAR-205 SER cc:

S. Hanauer Distribution l

H. Denton Central File D. Huller NRR Reading F. Miraglia AAB Reading it J. Miller DSE Reading g

R. Vollmer AAB File i

W. Mcdonald (w/oencl.)

J.Panzarella(w/oencl.)

[i D. Bunch G. Chipman x

l K. Murphy AAB:DSE E

B:DSE AD A: S I

oresce >

l KHu pman ench RH o mer 1

21 7 2

_ /J7/77 2/>t/77 2/ut/77 ggg1gogno~81 bibs ~'"

~ ~ ~' ~ '.~ ~ ~ " ": ~ ~

MADDEN 80-515 PDR

/

r AAB UPOATE OF THE B-SAR-205 SER February 18, 1977 Add the following section:

15.X.5 Rupture of Process Equipment I

Accidents involving process equipment such as the deborating demineralizer and degasifier and the RC bleed holdup tank have been postulated to determine potential off-site doses. These calculations are used in conjunction with the guidelines of f

Regulatory Guides 1.26 and 1.29 to determine the appropriate quality group classification.

l B & W has specified the radiction source terms resulting from l

the postulated failure of tnese components. B & W has indicated that the applicant's SAR will confirm the quality group classi-fication based on these source terms and on actual site meteorology.

An interface requirement nas been established. We concur with this approach in satisfying the guidelines in Regulatory Guides 1.26 and 1.29.

L Make the following changes:

1 1.

Table 15-1, Rod Ejection - Case 2.

Change the 2-hour dose to the thyroid from 81 to 78 rem.

2.

Table 15-3, Case 2 replace the assumptions with the following:

a.

36 percent fuel with clad failures after accident.

b.

Release of total gap activity in failed fuel, c.

Pressure equalization between primary and secondary reached in sixty minutes.

l l

d.

Cooling rate 75' per hour.

  • --e.,

_._,wy m'

M