ML20039F235

From kanterella
Jump to navigation Jump to search
Forwards Response to Round One Question 033.20 Re Compliance W/Reg Guide 1.75.Evaluation Requested by Jul 1976
ML20039F235
Person / Time
Site: 05000561
Issue date: 06/17/1976
From: Macmillan J, Macmillian J
BABCOCK & WILCOX CO.
To: Boyd R
Office of Nuclear Reactor Regulation
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555, RTR-REGGD-01.075, RTR-REGGD-1.075 6332, NUDOCS 8201120245
Download: ML20039F235 (2)


Text

-

. -. ~

Babcock &Wilcox

g.,c n,, son c, cop P.O. Box 1260, Lynchburg, Va. 245C5 Telephone: (804) 384-5111 Docket STN 50-561 June 18, 1976 i Nw gi' A

Director of Nuclear Reactor Regulation Q,D ATTN:

Mr. Roger S. Boyd, Director g

'v Division of Project Management p\\Og\\hg # h

~

U.S. Nuclear Regulatory Commission 9-g Washington, D.C.

20555

-i

Subject:

B-SAR-205

@y Response to Round One Question 033.20 cJ p

Dear Mr. Boyd:

The Babcock & Wilcox Company herewith transmits 40 copies of our response to B-SAR Round One Question 033.20, including 3 signed originals in accordance with 10 CFR 50.30.

(

In keeping with agreements reached during informal meetings with Mr. T. H. Cox on Anril 28 and June 9, 1976, we are transmitting the attached at this time to obtain the benefits of a possible early review by the NRC Staff.

It is our intent to also laclude the attached response as part of forthcoming Amendment 2 to B-SAR-205, which is scheduled for submittal on July 19, 1976.

The B&W position in the matter of compliance with Regulatory Guide 1.75 is con-tained in the January 23 B&W 1etter as referenced in Question 033.20 and has been supple =ented in developing the attached response. We would be appreciative of any effort by yourself or Mr. Cox to assist us in obtaining an expedited review, and a Staff letter of evaluation, on our position.

In order to permit finalizing design of our safety systems, and to meet certain licensing needs (such as single failure analysis of protective systems), we would appreciate receiving the Staff's letter of evaluation by the end of July 1976.

If there are any questions concerning the attached response or if additional information is desired, please contact Mr. C. S. (Steve) Banvarth in our Licensing Section at 804-384-5111 - Ext. 2702.

Very truly yours, k

\\

,w'.

V cv JHM/JJH/mjc Joh H. MacMillan Attachment Vice resident cc: w/ Attachment Nuclear Power Generation Division T. H. Cox - NRC Washington R. B. Borsum - B&W Washington U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement - Region IV I

611 Ryan Plaza Drive, Suite 1000 Ar]ington, Texas 76012 6332 SM112O245 810403 h Babcock & Mcox Ccmpany / Established 1867 P Dit FOIA NADDEN80-515 PDR

' ' ' EtTRC ecnu 195 u.s. NUCLE AR REcVLATORY COMMISSION DOCXET NUMIED u- *

~

50-561 NRC OlSTRIBUTION rOn PART 50 DOCKET MATERIA'L TO:

FROM:

DATE OF OOCUMENT 4,

Babcock & kilcox 6/18/76

. Roger S. Boyd Lynchburg, Virginia o47, ngeg,yg o l

Mr. John H. MacMillan 6/23/76 l$LE TTE R R,NOTO RIZ E D PROP WPUT FORM NUMDER OF COPIES RECEIVED MoRiO'NAL fifuNcLAssiriEo Three signed OcCry 37 CC enet reevd.

OEsCRIPTION ENCLOSU R E Ltr. (notorized 6/21/76) re meetings with Mr. T. H. Cox on April 28/76 & June 9/76 trans the following:

Furnishing response to B-SAR Round One Auesti<

, 033.20 in accordance with 10 CFR'50.30

~

.,4 ot (2-P)

(28-P)

PLANT NAME:

BSAR SAFETY FOR ACTION /INFORMATION ENVTRO 6/23/76 RJL

_.., [(

'9 SIGNED AD:

DeYounst (LB )

ASSIGNED ADt 1NCH CHIEF:

Um (LW)

BRANCH c"Tr?t A.,OJECT MANAGER:

Cr_m 1 PROJECT !*ANAGER!

,_j LIC. ASST.:

Rushbrook(LTR)

LIC. ASST.!

INTERNAL DISTRIBUTION

~

XREG FILE SYSTEMS SAFETY l PTANT SYSTEMS SITE SAFETY &

X NRC PDR HEINEMAN

>C) Trnesco

/Mh.)

Y I&E

/2.)

SCHROEDER X.BENAROYA ENVIRO ANALYSIS DENTON & MUT T FR iSU D --

~

M TAINAS COSSICK & STAFF ENGINEERING M

IPPOLITO ENVIRO TECH _

_. M MIPC (ug. )

MACCARRY KIRKUOOD FRNRT I

CASE K KNIGHT BALLARD

._I HANAUER X SIi".JEIL OPERATING REACTORS SPANCT.FR HARLESS Y pal?LICKI STELLO I

l RTw mvru l

PROJECT MANAGEMENT REACTOR SAFETY.

OP2 RATING TECH.

X CAF'MTLT.

l

~

BOYD X

ROSS

[/.~9f. )

EISENHUT STEPP l

X P. COT. LINS X

NOVAK SHAO MUT UAN

) HOUSTON X ROSZTOCZY BAER PETERSON M

CHECK BtTELER SITE ANALYSIS PEUTZ' CRIMES M

Volf"rR

[/.~Zh.

[kTEMES AT & I K BUNCH SKOVHOLT SALTZMAN M

.I.

COT f.TNS I

RUTBERC M

PRFCr4 l

_L EXTERN AL DISTRIOUTION CONTROL NUMBER l

z'DR :

NAT L\\B:

BROOKHAVEN N&T IAB

_ g TIC:

REG. VIE ULRIKSON(ORNL) 25 NSICt l^ PDR

[M1

ASLB, CONSULTANTS fACRSl;bCYS AHkMHSl5ENT
  • fusjd4&p; I

N c FoHu not (2 7ei i