SEy 0 7 W 6 MEMORANDUM FOR: Robert L. Tedesco, Assistant Director for Plant Systems, DSS FROM:
Thomas A. Ippolito, Chief, Electrical, Instrumentation and Control Systems Branch, DSS
SUBJECT:
SCHEDULE O!ANGE IN BSAR-205 Q2 REVIEW i
EICSB will not be able to meet current Blue Book Schedule for Q2 milestone (9/12/76). Estimated completion date is 9/30/76 Bases 1.
Present schedule was tight but accepted by EICSB on the basis of a -
genuine desire to not impact BSAR schedule.
2.
Electrical reviewer's other major project, Fermi 2, was applicant-delayed such that previously approved annual leave was cancelled by electrical reviewer in the hope that the SER milestone date could be met (8/12/76). Due to certain perturbations within and beyond control of EICSB this project is still consuming reviewer's time.
3.
TAR 3358 was reschedule.d months ago to 8/31/76 in order to fit reviewers then existing schedule.. Reviewer has devoted time in August to complete this task. Milestonc date has been met.
4.
Electrical reviewer has also had to devote time during August to the Shearon Harris project. Priority work - not scheduled.
5.
Electrical reviewer has also been assigned during August to be the Branch's cognizant engineer on Power System Grid Stability and to work with D0R on this subject. Assignment was made based on reviewer's expertise and has consumed reviewer's time. Priority work - not scheduled.
{ {cF n
4 hThomasA.Ippolito, Chief
()
Electrical, Instrumentation and Control Systems Branch Division of Systems Safety Contact R. Fitzpatrick Ext. 27276 8201110864 810403 PDR FOIA MADDEN 80-515 PDR
SU C2 P.obert L. Tedesco 2
cc:
R. lieineman F. Schroeder O. Parr T. Cox D. Tondi J. Panzarella R. Fitzpatrick J. Glynn
/
l l
1 i
- - - - - ~
_____