ML20039E153

From kanterella
Jump to navigation Jump to search
Requests That Review Branches Review Previously Submitted SER Input & B-SAR-205 Amends Through Amend 9,then Either Submit Revised SER Input or Notify That No Changes Are Necessary
ML20039E153
Person / Time
Site: 05000561
Issue date: 02/02/1977
From: Cox T
Office of Nuclear Reactor Regulation
To: Collins P, Heltemes C, Houston W
NRC
Shared Package
ML111090060 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8201060588
Download: ML20039E153 (2)


Text

.

{

M S

UNITED ST/ ' ES I

by

,k NUCLEAR REGULATOlf / cC.W.11sslON h

f',.

,C i

WASHINGTON. D 'J. 20555 o, % Tlif.y ' f

.a j FEB 0 21917 Docket! No.'STN 5.0-561 MEMORANDUM FOR: Addressees on BSAR-205 Distri.bution List (Enclosure)

~

~

l n /l

' THRU:

0. D. Parr, Chief, Light Water Reactors Branch No. 3, DPM FROM:

T. H. Cox, Project Manager, Light Water Reactors Branch No. J. 0"M l

SUBJECT:

BSAR-205 SER DRAF'T IfPUT l

j The Report to the ACRS on the BSAR-205 application is tentatively scheduled for issue' on 5/16/77, which is approximately.two and one-half months later than the date on which most branch SE,R input dates were set. At this

[l writing, SER input has not yet been received. from the following branches":

j Containment Systems i

Electrical Instrumentation Analysis Branch (Thermal-Hydraulics)

Reactor. Systems Some review branches have submitte'd SER draft input based on review through BSAR Amendment 6.

C&W submitted Amendment 7 on 12/17/76,

. Amendment 8 on 01/24/77 and Amendment 9 is due on 02/04/77.

Because of the planned delay in preparation of the Report to the ACRS, we feel it necessary for the Report, when issued, to be current through Amendment 9.

Accordingly, I am requesting that you review previously submitted SER draft input.and BSAR Amendments through number 9, and then either submit an amended SER input, or notify the LPM that no change is necessary.

Most changes in the amendments are in response to staff' questions and positions.

Some are initiated by B&W. All changes are identified in_

the B&W transmittal. letter accompanying each amendment.

Please~ inform me by 02/11 concerning your ability to respond to. this f

request by 03/08/77.

A. v /'

~

T. H. Cox, Project Manager Light Water Reactors Branch No. 3 Division of Project Management

Enclosure:

As Stated cc:

0. D. Parr T. H. Cox 8201060588 810403' PDR FOIA MADDEN 80-515 PDR

,f I sc L.~

ENCLOSUR_E J

~! -

BSAR-205 DISTRIBUTION LIST

+

1

.I

- P. Collins 4

+

W. Houston

~

C. Hel temes -

1. Sihweil I.

~

S. Pawlicki T. Novak

- Z. Rosztoczy 4

P. Check ~

V. Benaroya

~

G. Lainas 1

T. Ippolito R. Kirkwood l"

l D. Tibbitts D. Bunch i

t J. Collins F. Rosa i

W. Kreger R. Bosnak

.'Chakoff l

[

J. Costello l

S. Chan l

t C. Sellers t

G. Georgier G. Mazetis W. Jensen G. Kelly M. Tokar W. Brooks L. Riani T. Greene-l R. Fitzpatric.k-i K. Murphy

+

J. Minns l

T. Murphy J. Kovacs

]

l E

5 t

l i

e.

s

' r 4

n Y

I t

g

~

P

+

+

e,

-, +, -

.n..

r-.

-e.