Rev 1 to Mor,Operating Data Rept for Jan 1993 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H283
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/31/1993
From: Edwards M
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160325
Download: ML20034H283 (1)


Text

__

l ATTACHMENT I OPERATING DATA REPORT DOCKET NO.

_50-285 UNIT FORT CALHOUN STATION DATE FEBRUARY _ 08,1993 COMPLETED BY M.

L.

EDWARDS OPERATING STATUS TELEPHONE (402) ~636-2451

.l. Unit Name:

FORT CALHOUN STATION

-2.

Reporting Period:

JANUARY 1993 NOTES

3. Licensed Thermal Power (MWt): 1500
4. Nameplate Rating (Gross MWe):

502

5. Design Elec. Rating (Net MWe):

47][

6. Max. Dep. Capacity (Gross MWe):

502

7. Max. Dep. Capacity (Net MWe):

478_

8.

If changes occur in Capacity Ratings (3 through 7) since last report, give' reasons:

N/A

9. Power Level to which restricted, if any (Net MWe): N/A

-10. Reasons for restrictions, if any:

N/A

^

THIS MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period...........

744,0 744.0 169658.0 12.-Number of Hours Reactor was Critical 744.0 744.0

~~

1309.5 131354.3

13. Reactor Reserve Shutdown Hours......

.0

.0

14. Hours Generator On-line.............

744.0 744.0 129807.2

15. Unit Reserve Shutdown Hours.........

.0

.0

.0

16. Gross Thermal Energy Generated (MWH) 1112001.8 1112001.8 170677477.8_/
17. Gross Elec. Energy Generated (MWH)..

378130.0 378130.0 56218930.2

18. Net Elec. Energy Generated (MWH)....

361238.7 361238.7 53632125.6

19. Unit Service Factor.................

100.0 100.0 76.5

20. Unit Availability Factor............

100.0 100.0 76.5

21. Unit Capacity Factor (using MDC Net) 101.6 101.6-68.7
22. Unit Capacity Factor (using DER Net) 101.6 101.6 66.9
23. Unit Forced Outage Rate.............

.0

.0 4.3

24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

ON MAY 2, 1993; THE PLANT IS SCHEDULED TO BE PLACED IN HOT-SHUTDOWN FOR AN 8 DAY MID-CYCLE HAINTENANCE OUTAGE.

25. If shut down at end.of report period, estimated date of startup:

t

26. Units in test status (prior to comm. oper.):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 9303160325 930312 PDR ADOCK 05000285 R

PDR Revision 1 January 29,'1993 i

.