Rev 1 to Mor,Operating Data Rept for Feb 1992 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H271
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/29/1992
From: Cavanaugh G
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160303
Download: ML20034H271 (1)


Text

-

1 OPERATING DATA REPORT DOCKET NO.

50-285 UNIT FORT CALHOUN STATION DATE MX5DH 11,1992 COMPLETED BY G.

R.

CAVANAUGH OPERATING STATUS TELEPHONE 462-636-2474 i

1. Unit Name:

FORT CALHOUN STATION

2. Reporting Peri 3d:

FEBRUARY 1992 NOTES l

3. Licensed Thermal Power (MWt): 1500 4.

Nameplate Rating (Gross MWe):

502

5. Design Elec. Rating (Net MWe):

478

6. Max. Dep. Capacity (Gross MWe):

502

7. Max. Dep. Capacity (Net MWe):

478 8.

If changes occur in Capacity Ratings (3 through 7) since last report, give reasons:

N/A N

9.

Power Level to which restricted, if any (Net MWe): N/A

10. Reasons for restrictions, if any:

N/A THIS MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period...........

696.0 1440.0 161570.0

12. Number of Hours Reactor was Critical 7~. D 751.0 125569.7
13. Reactor Reserve Shutdown Hours......

.0

.0 1309.5~

14. Hours Generator On-line.............

2.0 746.0 124123.1

15. Unit Reserve Shutdown Hours.........

.0

.0

.0

16. Gross Thermal Energy Generated (MWH) 667TT 958856.1 162582491.8 /

I 17.-Gross Elec. Energy Generated (MWH)..

.0 323236TD-53499362.2

18. Net Elec. Energy Generated (MWH)....

.0 306776.6 51040528.0

19. Unit Service Factor.................

.3 5178 76.8

20. Unit Availability Factor............

.3 51.8 76.8

21. Unit Capacity Factor (using MDC Net)

.0 44.6 68.8

22. Unit Capacity Factor (using DER Net)

.0 44.6 66.9

23. Unit Forced Outage Rate.............

.0

.0 3.9-

24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

THE PLANT IS CURRENTLY SHUTDOWN FOR THE 13TH REFUELING OUTAGE.

THE OUT-AGE IS CURRENTLY SCHEDULED TO BE COMPLETED 4/_27/92.

25. If shut down at end of report period, estimated date of startup: 04/27/92
26. Units in test status (prior to comm. oper.):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY-N/A COMMERCIAL OPERATION 9303160303 930312 PDR ADOCK 05000285 Revision 1 R

PDR Januaor 29, 1993 J