ML20034H282
| ML20034H282 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 12/31/1992 |
| From: | Edwards M OMAHA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20034H263 | List:
|
| References | |
| NUDOCS 9303160324 | |
| Download: ML20034H282 (1) | |
Text
i ATTACHMENT.I
~
OPERATING DATA REPORT l
DOCKET NO.
50-285 i
UNIT FORT CALHOUN STATION DATE JANUARY 13,1993 COMPLETED BY M.
L.
EDWARDS OPERATING STATUS TELEPHONE (402) 636-2451-
- l. ~ Unit Name:
FORT CALHOUN STATION
- 2. Reporting Period:
DECEMBER 1992 NOTES
]
- 3. Licensed Thermal Power (MWt): 1500 4.
Nameplate Rating (Gross MWe):
502 i
5.
Design Elec. Rating (Net MWe):
4 78-
- 6. Max. Dep. Capacity (Gross MWe):
502 Dep. Capacity (Net MWe):
478
- 7. Max.
8.
If changes occur in Capacity Ratings (3 through 7) since last report, give reasons N/A i
'9.
Power Level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A l
1 THIS MONTH YR-TO-DATE CUMULATIVE l
q
- 11. Hours in Reporting Period...........
744.0 8784.0 168914.0'
- 12. Number of Hours Reactor was Critical 744.0 5791.6 130610.3 i
! 11 3. Reactor Reserve Shutdown Hours......
.0
.0 1309.5
- 14. Hours Generator On-line.............
744.0 5686.1 129063.2 l 15. Unit Reserve Shutdown Hours.........
.0
.0
.0
- 16. Gross Thermal Energy Generated (MWH) 1112266.1 7941840.3 169565476.0 /
- 17. Gross Elec. Energy Generated (MWH)..
378153.0 2664674.0 55840800.2
- 18. Net Elec. Energy Generated (MWH)....
361792.0 2537135.5
~53270886.9
- 19. Unit Service Factor.................
100.0 64.7 76.4 1 20. Unit Availability Factor............
100.0 64.7 76.4 l 21. Unit Capacity Factor (using MDC Net) 101.7 60.4 68.5 I
i 22. Unit Capacity Factor (using DER Net) 101.7 60.4 66.7
- 23. Unit Forced Outage Rate.............
.0 13.5 4.4
- 24. Shutdowns scheduled over next 6 months (type, date, and duration of each):
l NONE
- 25. If shut down at end of report period, estimated date of startup:
- 26. Units in test status =(prior to comm. oper.):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 9303160324 930312 ADOCK05000g85 Revision'1 L
DR January 29, 1993