ML20034H282

From kanterella
Jump to navigation Jump to search
Rev 1 to Mor,Operating Data Rept for Dec 1992 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H282
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/31/1992
From: Edwards M
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160324
Download: ML20034H282 (1)


Text

i ATTACHMENT.I

~

OPERATING DATA REPORT l

DOCKET NO.

50-285 i

UNIT FORT CALHOUN STATION DATE JANUARY 13,1993 COMPLETED BY M.

L.

EDWARDS OPERATING STATUS TELEPHONE (402) 636-2451-

l. ~ Unit Name:

FORT CALHOUN STATION

2. Reporting Period:

DECEMBER 1992 NOTES

]

3. Licensed Thermal Power (MWt): 1500 4.

Nameplate Rating (Gross MWe):

502 i

5.

Design Elec. Rating (Net MWe):

4 78-

6. Max. Dep. Capacity (Gross MWe):

502 Dep. Capacity (Net MWe):

478

7. Max.

8.

If changes occur in Capacity Ratings (3 through 7) since last report, give reasons N/A i

'9.

Power Level to which restricted, if any (Net MWe): N/A

10. Reasons for restrictions, if any:

N/A l

1 THIS MONTH YR-TO-DATE CUMULATIVE l

q

11. Hours in Reporting Period...........

744.0 8784.0 168914.0'

12. Number of Hours Reactor was Critical 744.0 5791.6 130610.3 i

! 11 3. Reactor Reserve Shutdown Hours......

.0

.0 1309.5

14. Hours Generator On-line.............

744.0 5686.1 129063.2 l 15. Unit Reserve Shutdown Hours.........

.0

.0

.0

16. Gross Thermal Energy Generated (MWH) 1112266.1 7941840.3 169565476.0 /
17. Gross Elec. Energy Generated (MWH)..

378153.0 2664674.0 55840800.2

18. Net Elec. Energy Generated (MWH)....

361792.0 2537135.5

~53270886.9

19. Unit Service Factor.................

100.0 64.7 76.4 1 20. Unit Availability Factor............

100.0 64.7 76.4 l 21. Unit Capacity Factor (using MDC Net) 101.7 60.4 68.5 I

i 22. Unit Capacity Factor (using DER Net) 101.7 60.4 66.7

23. Unit Forced Outage Rate.............

.0 13.5 4.4

24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

l NONE

25. If shut down at end of report period, estimated date of startup:
26. Units in test status =(prior to comm. oper.):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 9303160324 930312 ADOCK05000g85 Revision'1 L

DR January 29, 1993