Rev 1 to Mor,Operating Data Rept for June 1992 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H276
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/30/1992
From: Cavanaugh G
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160309
Download: ML20034H276 (1)


Text

.

OPERATING DATA REPORT.

DOCKET NO.

_50-285 UNIT FORT CALHOUN STATION DATE JULY 08,1992 COMPLETED BY G.

R.

CAVANAUGH OPERATING STATUS TELEPHONE (402) 636-2474

1. Unit Name:

FORT CALHOUN STATION 2.

Reporting Period:

JUNE 1992 NOTES

3. Licensed Thermal Power (MWt): 1500 4.

Nameplate Rating (Gross MWe):

502

5. Design Elec. Rating (Net MWe):

478

6. Max. Dep. Capacity (Gross MWe):

502

7. Max. Dep. Capacity (Net MWe):

478 8.

If changes occur in Capacity Ratings (3 through 7) since last report, give reasons:

NA 9.

Power Level to which restricted, if any (Net MWe): NA l

t

10. Reasons for restrictions, if any:

NA THIS MONTH YR-TO-DATE CUMULATIVE

.11. Hours in Reporting Period...........

720.0 4367.0 164497.0

12. Number of Hours Reactor was Critical 697.3 2168.2 126986.9
13. Reactor Reserve Shutdown Hours......

.0

.0 1309.5

14. Hours Generator On-line.............

689.7 2104.9 125482.0

15. Unit Reserve Shutdown Hours.........

.0

.0

.0

16. Gross Thermal Energy Generated (MWH) 999520.3 2750171.9 164373807.6_/
17. Gross Elec. Energy Generated (MWH)..

334823.0 919089.0 54095215.2

18. Net Elec. Energy Generated (MWH)....

~ 318788.0 871756.9 51605508.3

19. Unit Service Factor.................

95.8 48.2 76.3

20. Unit Availability Factor............

95.8 48.2 76.3

21. Unit Capacity Factor (using MDC Net) 92.6 41.8 68.2
22. Unit Capacity Factor (using DER Net) 92.6 41.8 66.4
23. Unit Forced Outage Rate.............

4.2 2.3 3.9

24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

JpRT CALHOUN STATION IS CURRENTLY IN SHUTDOWN DUE TO A PROBLEM WITH A SAFETY RELIEF VALVE.

t

25. If shut down at end of report period, estimated date of startup: 07/29/92
26. Units in test status (prior to comm. oper.):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION i

9303160309 930312 PDR ADOCK 05000285 Revision 1 PDR R