OPERATING DATA REPORT DOCKET NO.
50-285 UNIT FORT CALHOUN STATION DATE APRIL 08_,1992 COMPLETED BY M.
L.
EDWARDS OPERATING STATUS TELEPHONE (402) 636-2451
's
- 1. Unit Name:
FORT CALHOUN STATION 2.
Reporting Period:
MARCH 1992 NOTES I
- 3. Licensed Thermal Power (MWt): 1500 4.
Nameplate Rating (Gross MWe):
50T 5.
Design Elec. Rating (Net MWe):
478~
- 6. Max. Dep. Capacity (Gross MWe):
50_2
'. Max. Dep. Capacity (Net MWe):
478
/
8.
If changes 7ccur in Capacity Ratings (3 through 7) since last report, give reasons:
N/A
- 9. Power Level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A THIS MONTH YR-TO-DATE CUMULATIVE
- 11. Hours in Reporting Period...........
744.0 2184.0 162314.0
- 12. Mumber of Hours Reactor was Critical
.0 751.0 125569.7 4
- 13. Reactor Reserve Shutdown Hours......
.0
.0 1309.5
- 14. Hours Generator On-line.............
.0 746.0 124123.1
- 15. Unit Reserve Shutdown Hours.........
.0
.0-
.0
'16. Gross Thermal Energy Generated (MWH)
.0 958856.1 162582491.8 /
- 17. Gross Elec. Energy Generated (MWH)..
. 0' 323236.0
_53499362.2
- 18. Net Elec. Energy Generated (MWH)....
.0 306776.6 51040528.0
- 19. Unit Service Factor.................
.0 34.2 76.5
- 20. Unit Availability Factor............
.0 34.2 76.5
- 21. Unit Capacity Factor (using MDC Net)
.0 29.4 68.4
- 22. Unit Capacity Factor (using DER Net)
.0 29.4 66.6-
- 23. Unit Forced Outage Rate.............
.0
.0 3.9 j
- 24. Shutdowns scheduled over next 6 months (type, date, and duration of each):
THE_ PLANT IS CURRENTLY SHUTDOWN FOR THE 13TH REFUELING OUTAGE.
T.HE OUT-AGE IS SCHEDULED TO BE COMPLEIED ON APRIL 26, 1992.
- 25. If shut down at end of report period, estimated date of startup: 04/26/92
- 26. Units in test status (prior to comm. oper.):
Forecast Achieved
]
INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 9303160305 930312
{DR ADOCK 05000285 Revision 1-
.i PDR January 29,'1993L i
i