Rev 1 to Mor,Operating Data Rept for Mar 1992 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H272
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/31/1992
From: Edwards M
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160305
Download: ML20034H272 (1)


Text

_

OPERATING DATA REPORT DOCKET NO.

50-285 UNIT FORT CALHOUN STATION DATE APRIL 08_,1992 COMPLETED BY M.

L.

EDWARDS OPERATING STATUS TELEPHONE (402) 636-2451

's

1. Unit Name:

FORT CALHOUN STATION 2.

Reporting Period:

MARCH 1992 NOTES I

3. Licensed Thermal Power (MWt): 1500 4.

Nameplate Rating (Gross MWe):

50T 5.

Design Elec. Rating (Net MWe):

478~

6. Max. Dep. Capacity (Gross MWe):

50_2

'. Max. Dep. Capacity (Net MWe):

478

/

8.

If changes 7ccur in Capacity Ratings (3 through 7) since last report, give reasons:

N/A

9. Power Level to which restricted, if any (Net MWe): N/A
10. Reasons for restrictions, if any:

N/A THIS MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period...........

744.0 2184.0 162314.0

12. Mumber of Hours Reactor was Critical

.0 751.0 125569.7 4

13. Reactor Reserve Shutdown Hours......

.0

.0 1309.5

14. Hours Generator On-line.............

.0 746.0 124123.1

15. Unit Reserve Shutdown Hours.........

.0

.0-

.0

'16. Gross Thermal Energy Generated (MWH)

.0 958856.1 162582491.8 /

17. Gross Elec. Energy Generated (MWH)..

. 0' 323236.0

_53499362.2

18. Net Elec. Energy Generated (MWH)....

.0 306776.6 51040528.0

19. Unit Service Factor.................

.0 34.2 76.5

20. Unit Availability Factor............

.0 34.2 76.5

21. Unit Capacity Factor (using MDC Net)

.0 29.4 68.4

22. Unit Capacity Factor (using DER Net)

.0 29.4 66.6-

23. Unit Forced Outage Rate.............

.0

.0 3.9 j

24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

THE_ PLANT IS CURRENTLY SHUTDOWN FOR THE 13TH REFUELING OUTAGE.

T.HE OUT-AGE IS SCHEDULED TO BE COMPLEIED ON APRIL 26, 1992.

25. If shut down at end of report period, estimated date of startup: 04/26/92
26. Units in test status (prior to comm. oper.):

Forecast Achieved

]

INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION 9303160305 930312

{DR ADOCK 05000285 Revision 1-