Rev 1 to Mor,Operating Data Rept for May 1992 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H275
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/31/1992
From: Edwards M
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160308
Download: ML20034H275 (1)


Text

-

OPERATING DATA REPORT DOCKET NO.

50-285

~~65T tKCHOUN STATION F

~

UNIT DATE JUNE' 03,1992 COMPLETED BY M.

L.

EDWARDS OPERATING STATUS TELEPHONE (402) 636-2451

l. Unit Name:

FORT CALHOUN STATION

2. Reporting Period:

MAY 1992 NOTES

3. Licensed Thermal Power (MWt): 1500
4. Nameplate Rating (Gross MWe):

502 s

5. Design Elec. Rating (Net MWe):

478

6. Max. Dep. Capacity (Gross MWe):

50[

7. Max. Dep. Capacity (Net MWe):

478 8.

If changes occur in Capacity Ratings (3 through 7) since last report, give reasons:

N/A 9.

Power Level to which restricted, if any (Net MWe): N/A

10. Reasons for restrictions, if any:

N/A THIS MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period...........

744.0 3647.0 163777.0

12. Number of Hours Reactor was Critical 719.9 1470.9 126289.6 13 :. Reactor Reserve Shutdown Hours......

.0

.0 1309.5-

14. Hours Generator On-line.............

669.2 1415.2 124792.3 15 ~. Unit Reserve Shutdown Hours.........

.0

.0

.0

16. Gross Thermal Energy Generated (MWH) 791795.5 1750651.6 163374287.3 /

3

17. Gross Elec. Energy Generated (MWH)..

261030.0 584266.0 53760392.2

18. Net Elec. Energy Generated (MWH)....

246192.3 552968.9_

51286720.3

19. Unit Service Factor.................

89.9 38.8 746.2

20. Unit Availability Factor............

89.9 38.8 76.2

21. Unit Capacity Factor (using MDC Net) 69.2 31.7 68.1
22. Unit Capacity Factor (using DER Net) 69.2 31.7 66.3
23. Unit Forced Outage Rate.............

2.9 1.4 3.9

24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

NONE i

25. If shut down at end of report period, estimated date of.startup:

i

26. Units in test status (prior to comm. oper.):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION i

9303160308 930312 PDR. ADOCK 05000295 Revision 1 R

PDR January 29, 1993'