ML20034H268

From kanterella
Jump to navigation Jump to search
Rev 1 to Mor,Operating Data Rept for Nov 1991 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H268
Person / Time
Site: Fort Calhoun 
Issue date: 11/30/1991
From: Edwards M
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160299
Download: ML20034H268 (1)


Text

.

OPERATING DATA REPORT DOCKET NO.

50-285 UNIT

~ ort Calhoun Station DATE Jecember 9. 1991 COMPLETED BY 4. L. Edwards TELEPHONE (402)636-2451 OPERATING STATUS 1.

Unit Name: Fort Calhoun Station Notes 2.

Reporting Period:. November 1991 3.

Licensed Thermal Power (MWt):

1500 4.

Nameplate Rating (Gross MWe):

502 5.

Design Electrical Rating (Net MWe):

478 6.

Maximum Dependable Capacity (Gross MWe):

502 7.

Maximum Dependable Capacity (Net MWe):

478 8.

If changes occur in Capacity Ratings (Item Number 3 Through 7) Since Last Report, Give Reasons:

N/A Power Level to Which Restricted, If Any /A(Net MWe):

N/A 9.

Reasons for Restrictions, If Any:

N 10.

This Month Yr-to-Date Cumulative 11.

Hours in Reporting Period 720.0 8.016.0

59.386.0 12.

Number of Hours Reactor Was Critical 720.0 7.286.0 24.074.7 13.

Reactor Reserve Shutdown Hours 0.0 0.0 1.309.5 14.

Hours Generator On-Line 720.0 7.203.2 122.633.1 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 1.076.235.2 /

9.228.594.4 /

160.512 083.7 /

17.

Gross Electrical Energy Generated (MWH) 366.750.0 3.047.480.0 52.797.6062 18.

Net Electrical Energy Generated (MWH) 350.526.0 2.887.287.2 50.372.063.5 19.

Unit Service Factor 100.0 89.9 76.9 20.

Unit Availability Factor 100.0 89.9 76.9 21.

Unit Capacity Factor (Using MDC Net) 101.8 75 4 68 4 75..%

66.9 22.

Unit Capacity Factor (Using DER Net) 101.8 23.

Unit Forced Outage Rate 0.0 10.1 3.9 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)ly three 24.

Refuelina outaae scheduled to beain February 1.1992 and last approximate months.

25.

If Shut Down at End of Report Period, Estimated Date of Startup: N/A 26.

Units In Test Status (Prior to Commercial Operation): Forcast Achieved INITIAL CRITICALITY 1

I INITIAL ELECTRICITY N/A COMMERCIAL OPERATION i

Revision 1 January 29, 1993 9303160299 930312 DR ADOCK 0500 5

>