Rev 1 to Mor,Operating Data Rept for Dec 1991 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H269
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/31/1991
From: Cavanaugh G
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160300
Download: ML20034H269 (1)


Text

'

OPERATING DATA REPORT DOCKET NO.

50-285 UNIT Fort Calhoun Station i

DATE January 13. 1992 l

COMPLETED BY G. R. Cavanauch j

TELEPHONE (4021636-2474 l

f OPERATING STATUS 1.

Unit Name: Fort Calhoun Station Notes 2.

Reporting Period: December 1991 3.

Licensed Thermal Power (MWt):

1500 Nameplate Rating Gross MWe):

502 Design Electrical (Rating (Net MWe):

4.

478 5.

6.

Maximum Dependable Capacity (Gross MWe):

502 478 l

Maximum Dependable Capacity (Net MWe)(: Item Number 3 Through 7) Since Last Report, 7.

If changes occur in Capacity Ratings 8.

Give Reasons:

NA 9.

Power Level to Which Restricted, If Any (Net MWe):

NA 10.

Reasons for Restrictions, If Any:

NA This Month Yr-to-Date Cumulative 11.

Hours in Reporting Period 744.0 8.760.0 L60,130.0 12.

Number of Hours Reactor Was Critical 744.0 8.030.0 L24.818.7 13.

Reactor Reserve Shutdown Hours 0.0 0.0 1.309.5 i

14.

Hours Generator On-Line 744.0 7.947.2 123.377.1 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 1.111.552.0 10.340.146.4 /

161.623.635.7 /

17.

Gross Electrical Energy Generated (MWH) 378.520.0 3.426.000.0 53.176.126.2 18.

Net Electrical Energy Generated (MWH) 361.687.9 3.248,975.1 50.733,751.4 19.

Unit Service Factor 100.0 90.7 77.0 20.

Unit Availability Factor 100.0 90.7 77.0 21.

Unit Capacity Factor (Using MDC Net) 101.7 77.6 69.0 22.

Unit Capacity Factor (Using DER Net) 101.7 77.6 67.1 23.

Unit Forced Outage Rate 0.0 9.3 3.9 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelina outaae scheduled for February 1,1992 and will last approximately three months.

25.

If Shut Down at End of Report Period, Estimated Date of Startup: NA l

26.

Units In Test Status (Prior to Commercial Operation): Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A h-COMMERCIAL OPERATION Revision 1 January 29, 1993

sa 22888! 3%88@

R

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -