Text

_.

OPERATING DATA-REPORT DOCKET NO.

5_0-285 UNIT FORT CALHOUN STATION DATE MAY.

11,1992 COMPLETED BY G.

R.

CAVANAUGH OPERATING STATUS TELEPHONE (402)636-2474

l. Unit Name:

FORT CALHOUN STATION

2. Reporting Period:

APRIL 1992

' NOTES

3. Licensed Thermal Power (MWt): 1500 4
4. Nameplate Rating (Gross MWe):

502

5. Design Elec. Rating (Net MWe):

478

6. Max. Dep. Capacity (Gross MWe):

502

7. Max. Dep. Capacity (Net MWe):

478 8.

If changes occur in Capacity Ratings (3 through 7) since last report, give reasons:

9. Power Level to which restricted, if any (Net MWe):
10. Reasons for restrictions, if any:

THIS MONTH YR-TO-DATE CUMULATIVE

11. Hours in Reporting Period..........

719.0 2903.0 163033.0

12. Number of Hours Reactor was Critical

.0 751.0 125569.7

~13. Reactor Reserve Shutdown Hours......

.0

.0 1309.5

14. Hours Generator On-line.............

.0 746.0 124123.1

15. Unit Reserve Shutdown Hours.........

.0

.0

.0

16. Gross Thermal Energy Generated (MWH)

.0 958856.1 162582491.8;/

17. Gross Elec. Energy Generated (MWH)..

.0 323236.0 53499362.2

18. Net Elec. Energy Generated (MWH)....

.0 306776.6 51040528.0

19. Unit Service Factor.................

.0 25.7 76.1

20. Unit Availability Factor............

.0 25 ?T 76.1

21. Unit Capacity Factor (using MDC Net)

.0 22.l' 68.1

22. Unit Capacity Factor (using DER Net)

.0 22.1 66.3

23. Unit Forced Outage Rate.............

.0

.0 3.9

]

24. Shutdowns scheduled over next 6 months (type, date, and duration of each):

THE THIRTEENTH REFUELING OUTAGE CONCLUDED AND THE PLANT WENT ON-LINE HAY 3, 1992.

NO OUTAGES ARE SCHEDULED OVER THE NEXT SIX MONTES.

J

25. If shut down at end of report period, estimated date'of startup: 05/03/92
26. Units in test status (prior to comm. oper.):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A l

COMMERCIAL OPERATION 9303160307 930312 PDR ADOCK 05000285 Revision 1 R

PDR Januaqr 29, 1993 1

1

-.