ML20034H270

From kanterella
Jump to navigation Jump to search
Rev 1 to Mor,Operating Data Rept for Jan 1992 for FCS, Correcting monthly,year-to-date & Cumulative Data for Item 6 (Gross Thermal Energy Generated)
ML20034H270
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/31/1992
From: Edwards M
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20034H263 List:
References
NUDOCS 9303160302
Download: ML20034H270 (1)


Text

- _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _

OPERATING DATA REPORT I

DOCKET NO.

50-285 UNIT

ort Calhoun Station DATE
eb*uary 11. 1992 COMPLETED BYl1.

_. Edwards TELEPHONE (402)636-2451 OPERATING STATUS 1.

Unit Name: Fort Calhoun Station Notes 2.

Reporting Period: January 1992 3.

Licensed Thermal Power (MWt):

1500 4.

Nameplate Rating (Gross MWe):

502 5.

Design Electrical Rating (Net MWe):

478 6.

Maximum Dependable Capacity (Gross MWe):

502 i

1 7.

Maximum Dependable Capacity (Net MWe):

478 l

l 8.

If changes occur in Capacity Ratings (Item Number 3 Through 7) Since Last Report, i

Give Reasons:

i N/A l

9.

Power Level to Which Restricted, If Any (Net MWe):

N/A l

10.

Reasons for Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative 11.

Hours in Reporting Period 744.0 744 0 160.874.0 1

12.

Number of Hours Reactor Was Critical 744.0 744.0 125.562.7 13.

Reactor Reserve Shutdown Hours 0.0 0.0 1.309.5 14.

Hours Generator On-Line 744.0 744.0 124.121.1 15.

Unit Reserve Shutdown Hours 00 0.0 0.0 1

l 16.

Gross Thermal Energy Generated (MWH) 958.189.0 958.189.0 162.581.824.7 /

Gross Electrical Energy Generated (MWH 323.236.0 323.236.0 53.499.362.2 Net Electrical Energy Generated (MWH) )

)

11.

306.776.6 306.776.6 51.040.528.0 18.

19.

Unit Service Factor

00.0 100.0

-77.2 20.

Unit Availability Factor L00.0 100.0 77.2 21.

Unit Capacity Factor (Using MDC Net) 86.3 86.3 69.1 22.

Unit Capacity Factor (Using DER Net) 86.3 86.3 67.2 23.

Unit Forced Outage Rate 0.0 0.0 3.9 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling outaae beaat, in February 1.1992.and will last approximately three months.

25.

If Shut Down at End of Report Period, Estimated Date of Startup: N/A 26.

Units In Test Status (Prior to Commercial Operation): Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION Revision 1 January 29, 1993 9303160302 93<K312 DR ADOCK 050 5

p

_am.

.m me mm.