Ack Receipt of 810908 Rept Re safety-grade Anticipatory Reactor Sys.Requests That Addl Info Per Encl List Be Forwarded within 14 Days
ML20032A650
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/21/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To: Crouse R
TOLEDO EDISON CO.
References
TASK-2.K.2.10, TASK-TM TAC-45184, TAC-45188, NUDOCS 8110300541
Download: ML20032A650 (5)


Text

_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

wr a

h, OCTOBER 21 z.31 8

g DISTRIBUTION:

ORB #4 Rdg Gray File Docket File DEisenhut NRC PDR JStolz L PDR RIngram TERA DGarner NSIC H0rnstein Docket Ho. 50-346 EBlackwood OELD AE0D IE-3 lir. Richard P. Crouse ACRS-10 Vice President, Nuclear Toledo Edison Company Edison Plaza - Stop 712 300 Madison Avenue Toledo, Ohio 43652

Dear !!r. Crouse:

In our review of your September.8,1981, submittal regarding the safety grade Anticipatory Reactor Trip System for Davis-Desse, we have_'.dentified the need for further infomation. This information is identified in,the enclosure. We are working toward a closeout of this issue by the end of November and there-

  1. ore request that responses be forwarded to _us,eithin 14 days of receipt of t.his letter.

If there are any difficulties meuing this request date, please contact your Project Manager.

Sincerely,

' O RI G u a h u x c u r.D s i JOHNF. STOL;"

John F. Stolz, Chief Operating < Reactors Branch #4 Division of Licensing

Enclosure:

Request for Additional Information cc w/ enclosure:

p%

See next page o

/

f 0 'k u e i. h '-

E OCT2 71981m-9

. = w :)

\\;e;O>

4 U

3 '/

lbh*R888 Mis 85L, PDR o,,,e,,

..c.aaae.zau..

b a

,o _.,

..}..

.01.......]S& l.03.....

.......... ~.. ~..

... ~...... ~ ~

. ~..... - -.. -

... ~........ -

oney OFFICIAL REfCORD COPY umm iai-m*o une renu am nom 3 uncu om

s..

Toledo Edison Company ecw/ enclosure (s):

Mr. Donald H. Hauser, Esq.

U.S. Nuclear Reg *ulatory Commission The Cleveland tie.ctric Resident Inspector's Office Illuminating Company 5503 N. State Route 2 P. O. Box 5000 Oak Harbor. Ohio 43449 Clevelar.d. Ohio 44101 Mrs. Julia Baldwin, Librarian Gerald Charnoff, Esq.

Government Documents Co,11ection Shaw, Pittman, Potts William Carlson Library and Trowbridge University of Toledo 1800 M Street, N.W.

2801 W. Bancroft Avenue Washington, D. C.

20036 Toledo, Ohio 43606 Leslie Henry, Esq.

' : Fuller, Seney, Henry and Hodge 300 Madison Avenue Toledo, Ohio 43604 Regional Radiation Representative EPA Region V fir. Robert B. Boi Lum

/

230 South Dearborn Street Babcock & Wilcox Chicago, Illinois 60604 Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road

,Bethesda, Maryland 20014 Ohio Department of Health ATTil:

Radiological Health Program Director P. O. Box 118

' President, Board of County Colurchus, Ohio 43216 l

Commissioners of Ottawa County Port Clinton, Ohio 43452 Attorney Gene'ral Department of A^torney General 30 East Broad Street Columbus, Ohio 43215 l

\\

Harold Kahn, Staff Scientist P~ower Siting Commission 361 East Broad Street Columbus, Ohio 43216 I

f

/

Mr. Ted Myers Manager, Nuclear Licensing Toledo Edison Company Edison Plaza 300 Madison Avenue Tolado;,0hio 43652

L.

Encloaure REQUEST FOR A.iDITIONAL INFORMATION

~

SAFETY-GRADE ANTICIPATORY I

REACTOR TRIP Off LOSS OF MAIN t

FEEDWATER AND TURBINE TRIP t

i FOR DAVIS-BESSE UtlIT NO. 1 2

Relating to your September 8,1981 (Serial 744),.you are requested to provide:

1.

Electrical schematic; and control panel layout diagrams which show the locations cf the RESET and BLOCK switches, now these switches are wired, and the interconnections between these switches and the anticipatory l

reactor trip system (ARTS) logic shown on Figure 1.

2.

Electrical schematics whien show which contacts of the ARTS relays-(KA, KE, etc. shown on Figure 1) are used in the control rod drive breaker trip string and how these contacts are wired into the trip string.

3.

.'. RPS check-out procedure which will demonstrate the operability of the new trip circuitry.

4.

A discussion on whether the ARTS design permits a channel functional test which includes the operability of the pressure sensors (not calibration or set point verification) during plant operation.

If pressure sensors are not included in the channel functional test, discuss the extent to which the channel functional test capability demonstrates the operability of the system.

5.

A description of the isolators (including ratin ) shown on Figure 1.

1

.