Forwards LER 82-033/03L-0.Detailed Event Analysis Encl
ML20028B595
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/29/1982
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20028B596 List:
References
NUDOCS 8212030060
Download: ML20028B595 (2)


Text

i w j SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFsCs 764 COLUMBIA SOUTH CAROLINA 292 68 O. W. DixoN. Jm.

vice Passioeur NuCLsAR OpenarioNS November 29, 1982 4 , 1 Mr. James P. O'Reilly, Director N:'

.d l U.S. Nuclear Regulatory Commission :00 I

)

Region II, Suite 3100 P si 101 Marietta Street, N.W. . . 9 P d Atlanta, Georgia 30303 '# .S

SUBJECT:

Virgil C. SummerNuclearStafgn '..

'~

Docket No. 50/395 g i Operating License No. NPF-12 -l Thirty Day Written Report LER 82-033

Dear Mr. O'Reilly:

Please find attached Licensee Event Report #82-033 for Virgil i C. Summer Nuclear Station. This Thirty Day Report is required l by Technical Specification 6.9.1.13.(b) as a result of entry into the Action Statement of Technical Specification 3.7.4,

" Plant Systems . Service Water System," on October 31, 1982.

Should there be any questions, please call us at your  !

convenience.

Very truly yours,

? r- l 1

0. W. dixon, Jr. f.

l CJM:0WD:dwf l

Attachment cc: V. C. Summer A. R. Koon T. C. Nichols, Jr. H. Radin G. H. Fischer Site QA

0. W. Dixon, Jr. C. L. Ligon (NSRC)

H. N. Cyrus G. J. Braddick H. T. Babb J. L. Skolds D. A. Nauman J. B. Knotts, Jr.

M. B. Whitaker, Jr. B. A. Bursey W. A. Williams, Jr. I&E (Washington)

O. S. Bradham Document Management Branch R. B. Clary INPO Records Center M. N. Browne NPCF File

^

M' 8212030060 821129 PDR ADOCK 03000395 , y S pop

...y -.-.,r , . -. , - ~ .. r,y .- ~-

8 . . 1 ey Mr. James P. O'Reilly LER No.82-033 Page Two November 29, 1982 DETAILED DESCRIPTION'OF EVENT On October 31, 1982, with the Plant in Mode 4, while performing Surveillance Test Procedure (STP) 123.002, " Service Water System Pump Test", the Speed Switch for Service Water Pump "A" failed in mid-position during the fast to slow speed transfer. Service Water Train "A" was declared inoperable per Technical Specification 3.7.4.

PROBABLE CONSEQUENCES Since the redundant Service Water Train "B" -was operable at the time of this event, there were no adverse consequences.

CAUSE(S) OF THE OCCURRENCE The cause of this' occurrence was determined to be a bad contact on the Speed Switch Relay. The charging motor consequently failed to adequately charge the springs. causing the Speed Switch to shift only to mid-position.

IMMEDIATE CORRECTIVE ACTIONS TAKEN Speed Switch (XES-2003A) was manually shifted to fast speed and Service Water Pump "A" was started within fifteen (15). minutes of the occurrence. Service Water Pump "A" was removed from service af ter completion of Service Water Pump "C" alignment to Train "A". Speed Switch Relay repair was performed satisfactorily on November 1, 1982.

i ACTidd TAKEN TO PREVENT RECURRENCE Speed Switch Relay inspection has been added to the Station Preventive Maintenance Program to prevent recurrences of this nature.