Forwards Supplementary Info Re NUREG-0696 Concerning Emergency Response Facilities,Westinghouse Application for Withholding & Proprietary WCAP-9725, Westinghouse Technical Support Complex. Rept Withheld (Ref 10CFR2.790)
ML20005B494
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/02/1981
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML19277A024 List:
References
RTR-NUREG-0696, RTR-NUREG-696, TASK-3.A.1.2, TASK-TM TAC-43091, TAC-46131, TAC-46346, TAC-51292, NUDOCS 8107080296
Download: ML20005B494 (16)


Text

~

l r

- Ell PortlanciGeneralElechicCompany Ba1D m es vce Patent July 2, 1981 Trojan Nuclear Plant Docke t 50-344 License NPF-1 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

Attached please find supplemental information re3arding NUREG-0696

" Emergency Response Facilities" which was discussed at the June 15, 1981 meeting between the NRC and PGE. The Attachment covers five areas:

1) TSC Building, 2) TSC Computer System, 3) EOF Habitabi-lity, 4) EOF Data System, and 5) SPDS.

As discussed at the June 15, 1981 meeting, design descriptions of the raergency Response Facilities were submitted to the NRC on October 21, l'80 and April 15, 1981 as well as in the Irojan Radiological Emer-gency Plan which was submitted on December 31, 1980. rubsequent to the first submittal, procurement and construction of the TSC and SPDS were initiated and are in progress to comply with the NRC-required imple-mentation schedule.

Pursuant to your request, five copies of WCAP-9725 (proprier-ry) reports entitled " Westinghouse Technical Support Complev" s.e attached with this t :21ij transmitted to the NRC by submittal. These reports were cri t

Westinghouse (T. M. Anderson's letter to J. R. Miller dated June 13, 1980).

In conformance with the requirement of 10 CFR 2.790, as amended, of the

/

Commission's regulations, we are attaching with this submittal an appli- (gkD g j cation for withholding from public disclosure and an affidavit by

'f$

fpv I

Westinghouse.

0 gdL 999

-ro e f, Di07080296 810702 fstih Li PDR ADOCK 05000344

  • g F PDR (h0-121 S W Salrron Street Portard. Oregon 97204 3

Pbitlinid Genier-d Beddc Costy)eriy Mr. Darrell G. Eisenhut

' July 2, 1981 Page two Resolutirr-and approval by the NRC staff in the areas discussed in the att achment are required by August 1,1981, in order for us to comply with the October 1, 1982 completion date specified in NUREG-0696.

Sincerely, a

J n_ _

Bart D. Withers Vice President Nuclear Attachment c: Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Conmission Lynn Fraak, Director Stcte of Oregon Department of Energy

Trojan Nuclear Plant Docket 50-344 License NPF-1 ATTACHMENT 1 Sheet 1 of 6 TROJAN NUCLEAR PLANT SUPPLEMENTAL INFORMATION ON NUREG-0696 EMERGENCY RESPONSE FACILITIES (TSC, EOF and SPDS)

A detailed design description of the Technical Support Center (TSC),

Emergency Operations Facilities (EOF) and Safety Parameter Display System (SPDS) ror the Trojan tsuc: ear Plant was initially submitted to the NRC on October 21, 1980 in response to the NRC letter of September 5,1980.

Draft NUREGs-0696 and -0660, NUREGs-0578, -0585, and -0654 (Revi2 ion 0) were reviewed and consi$ered in the design of the Trojan Emergency Response Facilit.ies for the October 21, 1980 PGE submittal. Uti?ization of the EOF and TSC was described in the Trojan Radiological Emergency Plan, which was submitted on December 31, la80.

Due to the required implementation schedule of.anuary 1, 1982 at that time, procurement of the TSC computer system and the construction of the TSC building were commenced in May and December of 1980 respectively, which was before the final issuance of NUREG-0696.

NUREG-0696 was issued in final form in February 1981. Supplemental infor-mation identifying exceptions to the final NUREG-0696 criteria was trans-mitted by PGE to the NRC on April 15, 1981 with appropriate justifications.

Pursuant to the June 15, 1981 meeting betweer the NRC and PGE, the follow-ing additional information is provided.

I.

TSC Building The identification of of fice spaces on the first floor of the TSC is described in Figure 1.

The lunch / conference room located on the ncrthwest corner will be assigned as the office space for the NRC personnel during emergency conditions.

The remaining three office spaces 11 be used during normal and emergency conditions by PGE personnel.

During emergency conditions the of fice/ conference room in the southeast corner can be used for special conferences and meetings.

Since the TSC is planned to be used by the Plant personnel during normal operations, tSe work area next to the command center is divided by temporary partitions about five feet in height as office spacts.

This area can also be used for of fices during emergency conditions.

The command center, which is approximately 985 sq ft, is located on the southwest corner of the building and is equipped with accordian-type curtains to isolate that space from the remaining of fice spaces. The detailed dimensions and layout of the command center is described in WCAP-9725 (June 1980), Figure 2.1.

As shown in Figure 1, the TSC Building is also equipped with a deccatamina-tion room to prevent radioactive contamination of the building because of personnel access during emergency conditions. Decontamination equipment as well as anticcatamination clothing will be located in the decontamina-tion room.

l l

a F

Trojan Nuclear Plant Docket 50-344 License NPF-1 ATTACHMENT I Sheet 2 of 6 In case the need arises to travel between the TSC and the control room during emergency conditions, the optimum travel route is out the emergency exit or the entrance door of the north side of the TSC, east through the yard to the Turbine Building doors (Figure 2).

There are three doors on the west side of the Turbine Building at El. 45 ft. and two doors on the soeth side. A person traveling to the control room is expected to take one of the Turbine Building doors, walk through the Turbine Building El 45 ft. floor to the Control Building and take either an elevator or stairs to the

<l. 93 ft. level where the control room is located.

In case this travel route is not available, there are also stairways internal to the Turbine Building which connect all three floors to the access door from the yard. Each floor of the Turbine Building is connected to the Control Building floors by doors. Therefore, the access through the Turbine Building to the Control Building is assured. Travel through the Turbine Building will also provide shielding from radioactivity releases which may be occurring.

In any case, the travel between the TSC arJ the control room can be conducted without passing through the security gate.

II.

TSC Computer System A general description of the TSC Computer System was provided in the October 21, 1980 PGE submittal, which was supplemented by WCAP-9725 (June 1980) for detailed design philosophy and descriptions (five copies of WCAP-9725 are attached to this submittal for your review). As discussed in the October 21, 1980 submittal, the Wectinghouse Computer System located in the TSC vill be utilized to accomplish the functions of data collection, data manipulation, and data display for the TSC, the SPDS and the Bypassed and Inoperable Status Indication (BISI) System. A description of the SPDS and BISI System is provided in Section V of this report.

The parameters to be included in the TSC Data System are delineated in Table 1.

The parameters in Table I constitute critical parameters consi-dered necessary for recognition and mitigation of accident conditions.

Other parameters, which are specified in Regulatory Guide 1.97 (Revision 2) but not included in the Trojan TSC Data System, will be made available on demand to the TSC and EOF by telephone communication. Containment sump water temperature and Containment spray flow,which are not currently mes-sured, will be inferred by the Containment temperature and Containment spray pump discharge pressure.

Qualifications of the components which provide input to the TSC Data System are presently being reviewed as part of the Regulatory Guide 1.97 review.

Information regarding equipment qualifications will not be available until the Regulatory Guide 1.97 review is completed in 1982.

.. -=-

4

~

r Trojan Nuclear Plant Docket 50-344 License NPF-1 ATTACHMENT 1 Sheet 3 of 6 I

III. EOF HABITABILITY The Trojan EOF is located in the Trojan Visitors Information Center (VIC),

approximately 700 meters WSW of the Containment. A floor plan of the EOF is 1

shown in Figure 3.

The vie possesses several advantages as an EOF location:

A.

Its closeness to the Plant allows for fast activation, and permits the use of Plant personnel as the initial EOF staff.

i 1

B.

It can serve as an Assembly / Decontamination Area for personnel evacuated from the Plant. Any personnel can then quickly travel to the Plant if needed.

C.

The EOF staff, including the Emergency Response Manager (PGE Vice-President, Nuclear), is located close to the Plant, providing more ef fective control of the emergency.

D.

NRC, FEMA, and State and county representatives are located j

clost to the Plant.

i E.

The VIC is a good location from which to control site security.

l F.

The VIC has been used as the EOF since 1975. Plant personnel, as well as State and county emergency response personnel, are familiar with the facility and its location.

G.

Using the VIC as an EOF helps to utilize existing structures near ti a Plant most ef ficiently.

H.

A low wind frequency (0.06%) toward the WSW provides good assurance of EOF babitability.

j The EOF is a well engineered structure that is designed to withstand a 100 yr.

flood, i

i An analysis has been performed on the ability of the EOF to withstand a 100 yr wind. At this wind level, some damage to the EOF Building may occur, but will likely be limited to broken windows. However, the command, communi-l cations, and dose assessment functions of the EOF take place in the building j

auditorium, which has no windows.

  • he auditorium is protected from the j

building areas that have windows by internal walls. Therefore, the essential functions of the EOF are not expected to be adversely af fected by a 100 year wind.

A description of the operation of the EOF and the EOF staf f is contained it:

Chapter 2, Section 5.2 of the Trojan Radiological Emergency Plan.

The alternate EOF is located at the PGE St. Helens District office in St. Helens, Oregon (13 miles from the Plant), and if activated will have the scmo staff and functions as the primary EOF.

Emergency equipment and supplies are stored at the alternate EOF, and all EOF communications and dose assessment capabilities exist at the alternate EOF.

4 1

>+m?*ey

= r -t-p se- #c-w g --m i is-vy -% + v -iev g

- y ge e g -opww -

w eme-t-e %--y ew w y y==

-ww w e w op-e gn-wi-g---ep-g e-v --as w w. = re-e --'-y-yw,

&nW-w---

Trojan Nuclear Plant Docket 50-344 License NPF a ATTACHMENT 1 Sheet 4 of 6 The alternate EOF will be prepared for activation whenever the EOF is acti-vated by notifying the St. Helens District Manager.

If evacuation of the EOF is required, the St. Helens office staff will be notified to begin activation of the alternate EOF.

During the time required to move the EOF staff to the alternate EOF (approximately 30 uinutes), the command, communications, and dose assessment functions of the EOF will be assumed by the TSC.

The TSC staff is trained and qualified to carry on these tasks, and the required communications and dose assessment facilities exist in the TSC.

If the Emergency Response Manager (PGF Vice-President, Nuclear) has already reported to the EOF to assume command of the PGE emergency organi-zation (Emergency Coordinator), he will turn his duties as Emergency Coordinator back to the Plant General Manager in the TSC until the alter-nate EOF is operational.

State and county representatives at the EOF do not have decision-making roles, so relocation to the alternate EOF will not af fect the emergency response capabi.lities of the State and county EOCs.

PGE will include anticipatory protective action criteria for relocation to the alternate EOF in the next amendment to the Trojan Radiological Emer-gency Plan which is expected to be issued in August 1981. These antici-patory protective action criteria for the EOF, which are shown below, should peruit relocstion prior to substantial releases of radioactivity from the Containment:

Fuel melting indicated by Containment area monitors or dose rate measurement outside Containment; and 1.

Containment sprays and air coolers not func-tioning; and 2.

Containment pressure greater than 70 psig for 2 min.; or 3.

Other conditions exis which will lead to loss of Containment integrity.

The anticipatory protective action criteria are in addition to the following criteria which are based an radiation levels in the EOF:

1.

One rem /hr whole body; or 2.

100 MPC I-131; or 3.

Ten times these levels persisting for greater than 5 min.

PGE will test the relocation to and operation of the alternate EOF durine the 1982 Trojan Emergency Plan Exercise.

Trojan Nucleae Plant Docket 50-344 License NPF-1 ATTACHMENT 1 Sheet 5 of 6 HEPA filters are not required for the EOF ventilation system because of the protective action criteria established for the EOF.

The anticipatory protective action criteria for the EOF (listed above) will require reloca-tion to the alternate EOF before slow-developing accidents (i.e., greater than one hour) reach the point where significant particulate radioactivity will be released.

For accidents involving a quick release of radioactivity (i.e., less than one hour) the releases will initially be dominated by volatile nuclides (noble gases and iodine).

Particulate radioactivity will consist of iodine or short-lived noble gas deu;hters which do not contribute significantly to the dose rate inside the EOF. Furthermore, the presence of these short-lived noble gas daughters in the EOF would not be prevented by the HEPA filters because of their continuous generation by the decay of the uoble gases inside the EOF.

The dose rate and iodine air concentration protective action criteria will ensure relocation to the alternate EOF before significant long-lived particulate radioactivity such as Cesium-137 will be released.

IV.

EOF DATA SYSTEM The TSC data set discussed in Section II above will be transmitted to '.he primary EOF in the Visitors Information Center.

As a minimue., both meteoro-logical and radiological data will be transmitted to the alternate EOF in St. Helens, Oregon.

As shown in Table I the EOF data set contains the meteorological parameters required to calculate dispersion coefficients in the Evacuation Planning Zone (i.e., wind direction, wind speed, and 200-33 ft delta temperature) and Plant parameters required to calculate of fsite doses (e.g., effluent radioactivity concentrations, effluent stream flow rates, area radiation monitor readings and Containment pressure). These data can be input along with radiation dose and airborne radioactivity measurements from field monitoring teams into an existing computer program which operates on a commercial time-share computer system located in Los Angeles, California. The computer can be accessed via commercial and PGE telephone circuits.

Since PGE-owned microwave telephone circuits connect both the primary and alternate EOFs directly to major telephone exchanges in Portland, Oregon, access to the time-share computer will not be affected by the potential overload of telephone circuits in the vicinity of the Plant following an accident.

The computer program calculates atmospheric dispersion factors and offsite doses upen which of fsite protective action recommendations can be made.

The ptsgram incorporates terrain correction factors which compensate for the river valley terrain present in the Evacuation Planning Zone.

By October 1,1982 this program will be modified to calculate relative concentrations and of fsite doses consistent with NUREG-0654, Appendix 2.

PGE's course of action regarding the remaining items of NUREG-0654, Appendix 2 (i.e., a meteorological measurements system in accordance with proposed Revision 1 to Regulatory Guide 1.23 and remote interrogation of meteorological measurements) will be submitted to the NRC before January 1, 1982.

Trojan Nuclear Plant Docket 50-344 License NPF-1 ATTACRMENT 1 Sheet 6 of 6 V.

Safety Parameter Display System (SPDS)

The SPDS is an integral part of the TSC computer system and constitutes a series of graphic displays to provide the current status of the parameters important to safety in the main control room and the TSC command center.

One of the graphic displays utilized for the SPDS is an iconic display of the critical parameters (Figures 4-3, -4, and -5 in WCAP-9725) in order to provide a quick recognition of accident conditions.

Even with current technology, this display cannot be made available at the EOF without a great deal of difficulty and et a very high cost.

The purpose of the iconic display is to provide an immediste identification and analysis of accidents in the control room and TSC.

These functions are not performed by the EOF.

Therefore, the iconic displays are not required in the EOF.

Instead, the values of the critical parameters displayed in the iconic display along with their corresponding technical limits, will be transmitted to the EOF by the TSC Computer System.

This will ensure that EOF personnel have the same data as that in the control room and TSC.

The TSC Computer System which develops the SPDS is not a safety system and thus, is not seismically qualified.

In response to the NRC repiire-ments in NUREG-0696 for a seismically qualified backup display system, the critical parameters listed in Table 2 will be displayed on a seismi-cally qualified " post-accident" panel (panel C-09) which has been added to install the post-TMI instruments in the control room.

Among the eight parameters listed in Table 2, the neutron flux indicators and stegm generator water level recorders are displayed on panels C-02 and C-05, respectively.

Although equipment qualifications for these parameters are still under evaluation for Regulatory Guide 1.97, selection of the parameters are based on ANS Standard 4.5 for accident recognition and mitigation.

The distances for detectability (i.e., trend reading of recorder and relative position of indicator) of recorder pointers and indicator pointers have been reviewed in a preliminary human engineering review.

Detectability of meter pointers was subjectively evaluated and found to be adequate at 15 ft from the panel. However, detectability of recorder pointers was poor beyond 10 ft as was differentiation of recorder trace color.

Since the distance between panels C-05 and C-09 is approximately 24 ft, the detectability distance of 10 ft for recorders from each panel leaves about 4 ft in which an operator needs to travel for adequate detectability. Obviously, detectability of the meters is not a problem.

The distance of 4 f t (or 2 ft for each side) is insignificant compared to normal walking distance for the control room operators from panel to panel.

The only two recorders for which an operator would have to move approxi-mately 2 ft in either direction are steam generator water level on C-05 and Containment pressure on C-09.

The three panels, C-02, -05 and -09, are thus considered to be adequately located for the purpose of a backup SPDS.

GAZ/KM/4 caw 9B14

Ew u

s

~

2 Z

{y y 0.65

~

~

,! Ew H

2

,6L

~

e-et

    • s-ei s-m

, ;i as o x <<

O,,.

wu a.

w m o.

3 3 W g g e

g O

3 l

I k.

Zo a

=

r, a

<z 4 o-

=

i U '

l E

U o<

ElU s

i Q

l 5/ "3 E

'*l

~52 D

w I

o o

.ci I

a w

{ r, 8

+

r {,.Q D

5 l

l Cl

^ m) m a

j 1

G s

4 l'o 8

3 2

4 i d 8

x

- a M

.J 8

I o

3

' /

i 5

E

'o f,

i O

m r

a w

a o

8 J

l -(

>>[

R g

=

. _.J w

\\

e E

i W

E I

o

!e E

id z

,(

\\

z 1

o.

\\

z%

CM J

j j

Ij I:

=.

.v m

t 1

0

(

r

,-(

E 5

N h-C

,.E Ll I

f o:!b 2

0; I

l E

n i

2 a

i 4

.1 d[O C$

2

E12L,

II 5

y g

I

h. Ji< */ !.N 1

i 2

1:

S N

5

(

f

_ L< u_<

l a

n e

p

~

,! M E'd NE v

t l

o go O

$h

~

s, E

I

  • d.

Trojan Nuclear Plant 5"

Docket 50-344 5

o E

E License NPF-1 5

~

Eg g

2 >c w zo u 5w H Ed u.a 445*W s

v>

wC 3

2'E 4

W 0 <'

2 w

I i

O

$ "I F

n:

sa 8

(

g 1

E i

a i

3 h

a j

e e

f i

~

i?"'!!!!['I !

5' l

3.

.v 7

48 e

.v 5

.v. v.,

IC ;99 o

gi d

O 2

.v. -

e 8

0:v.

N:;_9;? :::li. g m

c 3

g l

a g

u;i 3

e l

I w

g 4-e

,_._7 4.

l l :

E

(

a R

i f

o at l

)

f

=

,er i

y f

E LJ g

j w

g I Pjf a

l gg C

,_ o ' - g" Ol O x:

D O

I

$m j

E L _ _ _ _ __ _ _ _ _ q _ _ _ _ _ J U

Z-x.

('

1 x

i

  1. l d

xj l

l l

l x

Trojan Nuclear Plant Docket 50-344 Licenss. NPF-1 I

l

~

, r 8 O ilARR I ER liAHR 11 R

!$.RRi a a g

NO ENTRY NO EN1RY l'l.AN I l't.H Se nNN EL gog ENil:R 111 dC g g g.

.na i a B.

V fl iI uz p.--________.

Pl. ANT PERSONNEI.

X'XX X INITIAL ASSDint.Y AREA UU S-_~

l

+

t q

l DF.-Con & sig tg

-un

Z~ ~'

"Cl.EAN" REl. EASE h

F '

DfERGENCY N

i: NO ENTRY' l-

^

CENERATOR

[XX g

m NO EXIT l l

l w

BARRIER i

PERSONNEL.

NTWIRM AID

\\

l X

FRISKER

  • hENTFY-CONTAMINATED l

\\ BAFRIER -

dx k

--RAD-PRoll CT sui t.l ES NO ENTRY Qp g

x s

s l

4 h

N I

3R

//

l ECOSPill.R E w <

j r

tRISKI R (

)SS)

BARMIER DOCUMEN1 dn 1:01-STORAGE O'

g $'

PER>)NNEL

' O-1 j/

3 2

s ONI.Y n,.

ENTRY COMMUNICATION JU PPI.I ES :

EQUIPMT Sill'Pl.Y

$C RAD F I El.I) TEAM TRimK BUILDING BARRIERS & GROSS FRISKfRS ROAD BI,0CK & VISIT. RLGIS. CARDS SUPPLIES EOF DESK SUPPI.lES

!* FR ELJ TEAM VElllCLE f

=-

DOSE ASSESSMENT AREA

/

COMMIINICATIONS CENTER b

D O

Id I'

(AUDITORIUM STAGE)

_ _ ~. -_-. -

-.. _ - ~ _ -.

i Trojan Nuclear Plant i

Docket 50-344 l

License NPF-1 TABLE 1 Sheet 1 of 4 TROJAN NUCLEAR PLANT TSC Data System P ameters (June 12, a.)

1.

SI Pump Discharge Flow 2.

Charging Flow to BIT 3.

Charging Flow 4.

Letdown Flow

(

5.

JCP Seal Injection Flow j

6.

Aax. Bldg. Vent Flow 1

7.

Containment Purge Flow j

8.

Air Ejector Flow i

9.

Effluent Flow (Discharge and Dilution) 10.

RCP Seal Leakage Flow

11. Emergency Boration Flow i

i

12. 'RCS Flow 13.

Steam Generator Feedwater Flow 14.

Steam Generator Steam Flow 15.

RHR Flow to Hotlegs 16.

RHR Flow to Coldlegs i

17.

AFW Flow 18.

Pressurizer Level j.

19.

BAT Level i

20.

VCT Level 1

21.

PRT Level 4

22.

Steam Generator Level (narrow and wide ranges) i-23.

Accumulator Level 24.

RWST Level

'r e

e-+w.

9

-y a wee, yee--- c e ee we,----,1-w-,--e,e--,vte e

-eer-m-we~~+

+

w-+ + ww --,-, w c e e ve%%,-e,---+e,w~w--e--e-,--e-wirr-r-www--w-e-,ww.-,-eew+e--

Trojan Nuclear Plant Docket 50-344 License NPF-1 TABLE 1 Sheet 2 of 4 25.

NA0H Tank Level 26.

RCDT Level 27.

Clean Waste Tank Level 28.

Waste Monitor Tank Level 29.

Dirty Waste Drain Tank Level 30.

Dirty Waste Monitor Tank Level 31.

CST Level 32.

Containment Sump Level 33.

Reactor Vessel Level 34.

Emergency Diesel Tank Level 35.

Diesel AFW Pump Tank Level 36.

Wind Speed 37.

Wind Direction 38.

Dew Point Temperature 39.

Delta Temperature 40.

Containment Hydrogen 41.

Nuclear Instrumentation System (Source, Intermediate and Power Ranges) 42.

VCT Pressure 43.

Charging Pump Discharge Pressure 44.

Steam Generator Feedwater Flow Pressure 45.

Nonregenerative HX Outlet Pressure 46.

RCS Pressure 47.

Pressurizer Pressure 48.

PRT Pressure 49.

SG Steam Pressure.. - -

T i

Trojan Nuclear Plant Docket 50-344 l

License NPF-1 TABLE 1 Sheet 3 of 4 52.

Accumulator. Pressure i

53.

RHR Suction Pressure 54.

Containment Spray Pump Discharge Pressure

55. Wast e Gas Decay Tank Pressure i

56.

Turbine First Stage Pressure l'

57.

Containment Pressure 4

58.

Instrument Air Header Pressure 1

59.

PRMs 60.

ARMS i

61.

In-core Temperatures 62.

Letdown HX Outlet Temperature f

63.

RCP Seal Water Temperature 64.

RCP Lower Seal Water Bearing Temperature 65.

RCS Hotleg Temperature i

66.

RCS Coldleg Temperature 67.

Pressurizer Liquid Temperature i

68.

Pressurizer Steam Temperature r

l 69.

Pressurizer Relief Valve Discharge Temperature

(

70.

PRT Temperature l

1 71.

RHR HX Inlet Temperature i

r 72.

Feed Water Temperature 73.

RCS Delta Temperature i

74.

RCS T avg.

75.

Tref 76.

Containment Temperature 7

i t b

y-,,e.._

, -,,.. -,. ~,

,%w,.,,,,,,..,

,-*m,---,,,+%,,.w----.,n

.-,,,.,,-,.,,,.w-,+.,%,_,-,-y-,w---.-,w.

m Trojan Nuclear Plant Docket 50-344 License NPF-1 TABLE 1 Sheet 4 of 4 77.

CCW RX Inlet Temperature 78.

CCW HX Outlet Temperature 79.

RCP Motor Bearing Temperature 80.

Containment Isolation Valve Positions (Opeil/Close) 81.

Safety-Related System Valve Positions 82.

Safety-Related Pump Status 83.

ESF BUS / Breaker Status (>480 volt level)

KM/4mm7B10 Trojan Nuclear Pisut Docket 50-344 License NPF-1 TABLE 2 I

TROJAN NUCLEAR PLANT CRITICAL PARAMETERS FOR BACKUP SPDS ON POST-ACCIDENT PANEL (C-09) j ANS Standard 4.5 j

Type B Function Panel

~

Parameter (Reg. Guide 1.97 Type B)

Number Installed?

1.

Neutron Flux (a) Reactivity Control Operator Yes j

Console j

C-02 l

t 2.

Reactor Vessel Reactor Core Cooling C-09 Operational i

Water Level upon NRC Approval

}

4 in 1982.

3.

RCS Hotleg Reactor Core Cooling C-09(b)

Yes and Coldleg Temperatures (a) t 4.

RCS Pressure (a) Reactor Core Cooling C-09(b) yes and RCS Integrity 5.

Containment RCS and Containment C-09 1/1/82 Water Level Integrity 6.

Containment RCS and Containment C-09 1/1/82 Pressure Integrity (Recorder)(a)

]

7.

Containment RCS Integrity C-09 1/1/82 High-Range Area 4

Radiation (a) 8.

Steam Generator Not Included C-05 Yee y

Water Leve (Recorder) a)

(a) Seismic qualification is still under review and will be included in Regulatory Guide 1.97 evaluation.

(b) Information is available on demand through the subcooling margin monitor located on C-09.