December 31, 2019
SUBJECT:
FERMI POWER PLANT, UNIT 2 - CYBER SECURITY INSPECTION REPORT 05000341/2019412
Dear Mr. Dietrich:
On November 21, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Power Plant, Unit 2 and discussed the results of this inspection with Mr. Matthew Kirschenheiter, Director of Nuclear Engineering and other members of your staff. The results of this inspection are documented in the enclosed report.
Three findings of very low security significance (Green) are documented in this report. Three of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Fermi Power Plant, Unit 2.
The following cross cutting aspects were assigned to findings using Inspection Manual Chapter 0310, Aspects Within Cross Cutting Areas: two [H.14] - Conservative Bias and one [H.7] - Documentation.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Fermi Power Plant, Unit 2. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA David Curtis Acting for/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety
Docket No. 05000341 License No. NPF-43
Enclosure:
As stated
cc: M. OConnor, Security Manager D. Asselin, State Liaison Officer, State of Michigan
cc w/o encl: Distribution via LISTSERV
SUNSI Review
X Non-Sensitive Sensitive
X Publicly Available
Non-Publicly Available
OFFICE RIII RIII
NAME ADahbur:jw via Email DCurtis for RDaley
DATE 12/27/19 12/31/19