Forwards Partial Review,Equipment Evaluation Rept by Ofc of Nuclear Reactor Regulation for Fl Power Corp,Crystal River Unit 3. Written Response Required
ML19347D186
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/23/1981
From: Novak T
Office of Nuclear Reactor Regulation
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19347D187 List:
References
TAC-42512, NUDOCS 8103110423
Download: ML19347D186 (3)


Text

$w a

p

[o UNITED STATES g

NUCLEAR REGULATORY COMMISSION y

)e g

WASHINGTON, D. C. 2c555

-y t,

e

%,...../

February 23, 1981 A

[#\\. g Docket No. 50-302 ro e R[x0h ITB 2 719gg w (A

Mr. J. A. Hancock w co @ **

Director, Nuclear Operations Florida Power Coracration

(

P. O. Box 14042, Mail Stop C-4

/

St. Petersburg, Florida 33733

~

Dear Mr. Hancock:

SUBJECT:

ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT RE:

Crystal River Unit No. 3 Nuclear Generating Plant, License No. DPR-72

Reference:

Order for Modification of License Concerning the Environmental Qualification of Safety-Related Electrical Equipment, October 24, 1980.

This letter transmits the preliminary results of our review of environmental qualifications of safety-related electrical equipment at your facility.

This evaluation was based on your submittals received over the past months.

The facility license was modified by the referenced Order of October 24, 1980, to require that all safety-related electrical equipment be qualified to specified requirements not later than June 30, 1982.

In addition, the Order noted that a licensee is obligated to modify or replace inadequate equipment promptly.

The staff's review of your submittals has resulted in our identifying a number of potential equipment deficiencies involving a lack of proper documentation, inadequate justification of assumed environmental conditions following an accident, and/or inadequate environmental testing of equipment, such that conformance to the 00R guidelines, as required by the Order, cannot be demonstrated. You are requested to review our identified defi-ciencies, and their ramifications, and provide us your overall finding regarding continued safe operation of your facility. Accordingly, in order to determine whether your license should be modified or suspended, you are required pursuant to 10 CFR 50.54(f), to provide within 10 days of receipt of this letter, a written statement, signed under oath or affirmation sup-porting the safe operation of your facility, that takes into account the NRC staff's. preliminary list of deficiencies.

8103110 N j#

2-The purpose of this statement is to provide the NRC with needed assurance, by the licensee, regarding the continued safety of the facility until you can provide an item-by-item reevaluation in a detailed documented manner at a later date. A negative finding on your part concerning the safety of continued operation would result in a unit shutdown, and should be reported as a Licensee Event Report (LER) within twenty-four (24) hours of the deter-mination to the appropriate NRC Regional Office.

Include in the LER the actions you have taken for the immediate resolution of the matter.

A copy of any such LER should be sent to the Director, Division of Licensing, Office of Nuclear Reactor Regulation.

Please submit a copy of your reply to us via telecopy.

Sincerely,

)

. P7 <

Thomas M. Novak, Assistant Ofrector for Operating Reactors Division of Licensing

Enclosure:

Evaluation Report cc w/ enclosure:

See next page

i Crystal River Unit No. 3 50-302 Florida Power Corporation I

cc w/ enclosure (s):

I Mr. S. A. Brandimore dr. Robert B. E,orsum Vice President and General Counsel Babcock & Wilcox P. O. Box 14042 Nuclear Power Generation Division St. Petersburg, Florida 33733 Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Mr. Wilbur Langely, Chairman Board of County Commissioners Mr. Tom Stetka. Resident Inspector Citrus County U.S. Nuclear Regulatory Comission Iverness, Florida 36250 Routa #3. Box 717 Crystal River, Florida 32629 U. S. Environmental Protection Agency Region IV Office ATTN: EIS COORDINATOR 345 Courtland Street, N.E.

i.

Atlanta, Georgia 30308 Bureau of Intergovernmental Relations 660 Apalachee Parkway Director, Criteria and Standards Tallahassee, Florida 32304 Division Office of Radiation Prograr.s (ANR-460)

U. S. Environrental Protection Agency Washington, D. C. 20460 j

Crystal River Public Library 668 N. W. First Avenue Crystal River, Florida 32629 i

Mr. J. Streve The Public Counsel Room 4 Holland Bldg.

Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida i

2600 Blair Stone Road Tallahassee, Florida 32301 1

Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 i

Dr. William R. Stratton Los Alamos Scientific Lab Box 503 Los Alamos, New Mexico 87544

.