Forwards Vols 3 & 4 to Environ Qualification of Class IE Equipment. Data Combined w/830520 Response to NRC 830111 Ser,Provides Complete Response to NUREG-0588,IE Bulletin 79-01B & Recently Published Rule 10CFR50.49
ML20024A679
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/15/1983
From: Westafer G
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20024A680 List:
References
REF-SSINS-6820, REF-SSINS-SSINS-6, RTR-NUREG-0588, RTR-NUREG-588 3F-0683-07, 3F-683-7, IEB-79-01B, IEB-79-1B, TAC-42512, NUDOCS 8306220049
Download: ML20024A679 (2)


Text

.s Power C O m P O R A T s O se June 15,1983 3F-0683-07 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Environmental Qualification of Safety Related Electrical Equipment

Dear Sir:

On November 6,1981, Florida Power Corporation (FPC) submitted, to the Nuclear Regulatory Commission, its response to the June 5,1981, NRC Safety Evoluotion Report for Crystal River Unit 3. In that submittal, FPC made certain commitments to perform additional analyses and investigations. The supplemental information to satisfy these commitments is contained in the attached Volumes 3 and 4 of " Environmental Qualification of Class IE Equipment." As discussed with Mr. M. B. Fairtile on June 14, 1983, FPC is enclosing two (2) copies of these documents.

Volume 3 of this submittal provides the following:

1.

Equipment Qualification Report Review Records.

2.

Material Aging Analyses & Support Documentation.

3.

Chemical Spray Evaluation and Analysis.

4.

Local Control Station Failure Analysis Criteria.

Volume 4 of the submittal contains System Component Evaluation Worksheets which have been revised as a result of the analysis and evaluation effort described in Volume 4 and the additional guidance received from the NRC since Volumes I and 2 were submitted in November,1981.

Florida Power Corporation believes that this data, combined with the May 20,1983, response to the NRC's January iI,1983, Safety Evaluation Report, provide a complete response to the recently published rule, 10CFR50.49, NUREG-0588, and IE Bulletin 79-01B.

PP 8306220049 830615

)

PDR ADOCK 05000302 f*

P PDR 9

General Office 3201 Tnirty-fourtn street soutn. P.O. Box 14042. St. Petersburg. Flonda 33733 813-866-5151

Mr. John F. Stolz 3F-0683-07 Page 2 It is our intention to proceed in good faith to implement the actions necessary to fulfill our commitments in an orderly fashion which will permit completion during the projected 198S Crystal River 3 refueling outage.

Sincerely, G. R. Westafer Monoger-Nuclear Licensing and Fuel Management Enclosure AEF:mm cc: - Mr. James P. O'Reilly Regional Administrator, Region 11 4

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900