(External_Sender) Response to Draft Rais, Dnrl Comments on Dominions October 31, 2019 Letter
ML19333B962
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/15/2019
From: Mark D. Sartain
Dominion
To: Angela Wu
NRC/NRR/DNRL/NLRP
Wu A, NRR-DNRL 415-2995
Shared Package
ML19333B959 List:
References
Download: ML19333B962 (1)


Text

From: Mark Sartain To: Wu, Angela Cc: Paul Aitken; Paul Phelps; Johnny Henderson; Fred Mladen; Diane Aitken; Craig D Sly; Bill Standley

Subject:

[External_Sender] Response to Draft RAIs, DNRL Comments on Dominions October 31, 2019 Letter Date: Friday, November 15, 2019 8:11:00 AM Attachments: email Attachment - Response to draft RAIs - Change Notice 6.pdf Ms. Wu, On November 7, 2019, in an email from Angela Wu (NRC) to Paul Aitken (Dominion), the NRC provided six comments on Dominions October 31, 2019 submittal, Surry Power Station (SPS) Units 1 and 2, Subsequent License Renewal Application (SLRA), Supplement to Subsequent License Renewal Application Change Notice 5.

During a follow-up telecom between Dominion and NRC that same day, it was determined that no action was required on behalf of Dominion for comments 1, 3, and 4.

Subsequently, on November 13, 2019, in an email from Lauren Gibson (NRC) to Paul Aitken (Dominion), the NRC provided 3 draft RAIs (comments 2, 5 and 6 from the email dated November 7, 2019) for which a response was requested on the docket. The attachment to this email provides the response to the draft RAIs and will be made available on the SPS docket within 10 business days as Change Notice 6.

Additionally, on October 14, 2019 Dominion submitted letter Serial No.19-385 that contained four topics that required an SLRA supplement. Change #1 in Enclosure 2 of letter Serial No.19-385 addressed ASME Code Case N-871 and examination of the accessible surfaces of the CFRP lining at the terminal ends. For clarity, it should be noted that the following sentence in Change #1 only applies to the terminal ends and not to the piping:

Prior to installation of the existing CFRP lining, the exposed metallic substrate was ultrasonically examined to confirm the minimum wall thickness requirements specified in the design documents were met.

If you have any comments or questions, please contact Mr. Paul Aitken at 804-273-2818.

Mark Sartain VP Nuclear Engineering & Fleet Support Tie line 730-3586 or iphone 804-201-0163 CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.